IDX-7
A
C
D E
F
G H
I
J
K L
B
IDX
ALPHABETICAL INDEX
Refrigeration cycle ...........................................
ATC-21
Removal and installation (A/T) ........... AT-266, AT-269
Removal and installation (Transfer) .................... TF-44
Revolution sensor (A/T) ...................... AT-118, AT-259
Rocker cover(VK45DE) ................................... EM-200
Rocker cover(VQ35DE) ..................................... EM-51
RP/SEN - Wiring diagram ................ EC-664, EC-1346
S
SAE J1979 - Service $01 - 09 ........... EC-129
, EC-715
Seal - See Exterior .............................................. EI-27
Seat belt inspection ............................................. SB-7
Seat belt, front ..................................................... SB-4
Seat, rear ......................................................... SE-104
Self-diagnosis (Transfer) .................................... TF-22
Self-diagnostic results ....................................... EC-70
SEN/PW - Wiring diagram ............... EC-484, EC-1152
SHIFT - Wiring diagram ................................... AT-233
Shift lock system .............................................. AT-232
Shift schedule .................................................. AT-359
Shock absorber (rear) ....................................... RSU-9
Side air bag (satellite) sensor .......................... SRS-51
Side curtain air bag .......................................... SRS-48
Side trim .............................................................. EI-38
SMJ (super multiple junction) ............................ PG-76
SNOW MODE SW ........................... EC-668, EC-1350
SNOWSW - Wiring diagram ............ EC-669, EC-1351
Spark plug replacement ..................................... MA-27
Spark plug replacement(VQ35DE) .................... MA-20
Spark plug(VK45DE) ....................................... EM-192
Spark plug(VQ35DE) ......................................... EM-43
Specification value ............................. EC-137, EC-802
Speedometer ........................................................ DI-5
Spiral cable ...................................................... SRS-44
SROOF - Wiring diagram ..................... BL-166, RF-13
SRS - See Supplemental Restraint System ...... SRS-5
SRS - Wiring diagram ...................................... SRS-12
SRS Trouble diagnoses ..................................... SRS-8
Stabilizer bar (rear) ......................................... RSU-16
Stall test (A/T) .................................................... AT-53
Standardized relay ............................................. PG-78
START - Wiring diagram ................................... SC-12
Starter ................................................................ SC-11
Starting system .................................................. SC-11
Steering gear and linkage inspection ................ MA-36
Steering linkage ................................................. PS-18
Steering wheel and column ................... PS-10, PS-13
Stop lamp switch ............................. EC-552, EC-1233
STSIG - Wiring diagram .................................. AT-108
Sun roof, electric ................................................ RF-10
Sunload sensor ............................. ATC-109, ATC-118
Sunroof .................................................. RF-10, RF-23
Supplemental Restraint System ........................ SRS-5
Supplemental restraint system - Wiring diagram ..........
SRS-12
Suspension ........................................................ MA-37
Symbols and abbreviations ..................... GI-11, GI-24
Symptom matrix chart ........................................ EC-96
System readiness test (SRT) code ...... EC-59, EC-721
T
Tachometer ........................................................... DI-5
TCM circuit diagram ........................................... AT-52
TCM inspection table ......................................... AT-89
Thermostat(VK45DE) ....................................... CO-53
Thermostat(VQ35DE) ....................................... CO-27
Three way catalyst function (Bank 1) EC-376, EC-1045
Three way catalyst function (Bank 2) EC-376, EC-1045
Three way catalyst precautions ............................ GI-6
Three way catalyst(VK45DE) .......................... EM-183
Three way catalyst(VQ35DE) ........................... EM-26
Throttle control motor ....................... EC-569, EC-1251
Throttle control motor relay .............. EC-557, EC-1238
Throttle position sensor (TPS) .......... EC-214, EC-338,
EC-509
, EC-511, EC-590, EC-886, EC-1009, EC-1185,
EC-1187
, EC-1272
Throttle valve closed position learning . EC-83, EC-745
Tie-rod ............................................................... PS-18
Timing chain(VK45DE) ................................... EM-203
Timing chain(VQ35DE) ..................................... EM-64
Tire rotation ....................................................... MA-35
Top tether strap child restraint ........................... SB-11
Torque converter installation AT-267, AT-268, AT-272
Torque convertor clutch solenoid valve AT-125, AT-127
TPS1 - Wiring diagram .................... EC-340, EC-1011
TPS2 - Wiring diagram ...................... EC-216, EC-888
TPS3 - Wiring diagram .................... EC-592, EC-1274
Traction control system circuit (engine) .......... EC-494,
EC-495
Transfer control unit inspection table ................. TF-21
Transverse link (front) ...................................... FSU-14
TRNSCV - Wiring diagram ............................... BL-226
Trouble diagnoses .............................................. GI-12
Two trip detection logic ........................ EC-53, EC-715
Tyre pressure monitoring system - trouble diagnoses ..
WT-15
Tyre pressure monitoring system - wiring diagram .......
WT-16
U
Unified meter and A/C amp. ............................... DI-28
V
Vacuum hose (brake system) ............................ BR-17
Vacuum hose drawing (Engine control) ........... EC-106
Valve clearance(VK45DE) .............................. EM-222
Valve clearance(VQ35DE) ................................ EM-93
Valve guide ..................................................... EM-108
Valve guide(VK45DE) ..................................... EM-239
Valve lifter ......................................................... EM-87
Valve seat(VK45DE) ....................................... EM-241
Valve seat(VQ35DE) ...................................... EM-110
Valve spring(VK45DE) .................................... EM-242
Valve spring(VQ35DE) ................................... EM-111
SB-8
SEAT BELTS
Revision: 2006 July 2007 FX35/FX45
NOTE:
Apply the tape so that there is no looseness or wrinkling.
6. Remove the clip fixing the seat belt and ensure that the webbing returns smoothly.
7. Repeat steps above as necessary to check the other seat belts.
SEAT BELT RETRACTOR ON-VEHICLE INSPECTION
Emergency Locking Retractors (ELR) and Automatic Locking Retractors (ALR)
NOTE:
All seat belt retractors are of the Emergency Locking Retractors (ELR) type. In an emergency (sudden stop)
the retractor will lock and prevent the webbing from extending any further. All 3-point type seat belt retractors
except the driver's seat belt also have an Automatic Locking Retractors (ALR) mode. The ALR mode (also
called child restraint mode) is used when installing child seats. The ALR mode is activated when the seat belt
is fully extended. When the webbing is then retracted partially, the ALR mode automatically locks the seat belt
in a specific position so the webbing cannot be extended any further. To cancel the ALR mode, allow the seat
belt to fully wind back into the retractor.
Check the seat belt retractors using the following test(s) to determine if a retractor assembly is operating prop-
erly.
Stationary Inspection for ELR Function
Grasp the shoulder webbing and pull forward quickly. The retractor should lock and prevent the belt from
extending further.
Stationary Inspection for ALR Function
1. Pull out entire length of seat belt from retractor until a click is heard.
2. Retract the webbing partially. A clicking noise should be heard as the webbing retracts indicating that the retractor is in the Automatic Locking Retractor (ALR) mode.
3. Grasp the seat belt and try to pull out the retractor. The webbing must lock and not extend any further. If necessary replace the retractor assembly.
4. Allow the entire length of the webbing to retract to cancel the automatic locking mode.
Moving Inspection for ELR Function
WARNING:
Perform the following test in a safe, open area clear of other vehicles and obstructions (for example, a
large, empty parking lot). Road surface must be paved and dry. DO NOT perform the following test on
wet or gravel roads or on public streets and highways. This could result in an accident and serious
personal injury. The driver and passenger must be prepared to brace themselves in the event the
retractor does not lock.
1. Fasten driver's seat belt. Buckle a passenger into the seat for the belt that is to be tested.
2. Proceed to the designated safe area.
3. Drive the vehicle at approximately 16 km/h (10 MPH). Notify any passengers of a pending sudden stop. The driver and passenger must be prepared to brace themselves in the event the retractor does not lock.
Apply brakes firmly and make a very hard stop.
During stop, seat belts should lock and not be extended. If the seat belt retractor assembly does not lock, per-
form the retractor off-vehicle inspection.