Downloaded from www.Manualslib.com manuals search engine 1A-170 Engine General Information and Diagnosis:
6Terminating resistance check in ECM and combination
meter
1) Turn ignition switch to OFF position and then disconnect
negative (–) cable at battery.
2) Measure resistance between CAN High terminal (2) and
CAN Low terminal (3) on DLC (1).
If resistance 57 – 67
Ω?Go to Step 7. Go to Step 8.
7Substitute ECM and recheck
1) Substitute a known-good ECM and recheck.
Is it in good condition?End. Substitute a known-
good combination meter
and recheck. If NG, go
to Step 11.
8Terminating resistance check in ECM
1) Make sure that ignition switch is OFF position and
battery negative (–) cable is disconnected.
2) Disconnect combination meter connector.
3) Measure resistance between CAN high terminal and
CAN low terminal on DLC as the same manner as Step
6.
Is resistance 114 – 134
Ω?Substitute a known-
good combination
meter.Go to Step 9.
9Internal circuit check in BCM
1) Make sure that ignition switch is OFF position and
battery negative (–) cable is disconnected.
2) Disconnect ABS control module connector.
3) Measure resistance between the followings
• Between CAN high terminal on DLC and “E08-2”
terminal on ABS control module connector
• Between CAN low terminal on DLC and “E08-13”
terminal on ABS control module connector
Is each resistance 0 – 1
Ω?Go to Step 10. Substitute a known-
good BCM.
10Internal circuit check in ABS control module
1) Make sure that ignition switch is OFF position and
battery negative (–) cable is disconnected.
2) Connect ABS control module connector and disconnect
ECM connector.
3) Measure resistance between the followings
• Between CAN High terminal on DLC and “E01-3”
terminal on ECM connector
• Between CAN Low terminal on DLC and “E01-18”
terminal on ECM connector
If each resistance 0 – 1
Ω?Substitute a known-
good ECM and recheck.
If NG, go to step 11.Substitute a known-
good ABS control
module.
11Substitute BCM and recheck
1) Substitute a known-good BCM and recheck.
Is it in good condition?End. Substitute a known-
good ABS control
module. Step Action Yes No
2
1
9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8
3
I7RW01110098-01
Downloaded from www.Manualslib.com manuals search engine Engine General Information and Diagnosis: 1A-171
12CAN communication check of TCM
1) Turn ignition switch to OFF position.
2) Connect TCM connectors.
3) Perform “Communication Bus Check” under “Bus
Check” using SUZUKI-SDT with ignition switch turned
ON.
Are all of BCM, ECM, ABS control module, combination
meter and TCM normally displayed?Go to Step 13. Check power and
ground circuits of TCM
referring to “TCM Power
and Ground Circuit
Check in Section 5A”. If
OK, substitute a known-
good TCM.
13CAN communication check of keyless start control
module
1) Turn ignition switch to OFF position.
2) Connect keyless start control module connector.
3) Perform “Communication Bus Check” under “Bus
Check” using SUZUKI-SDT with ignition switch turned
ON.
Are all of BCM, ECM, ABS control module, combination
meter, TCM and keyless start control module normally
displayed?Go to Step 14. Check power and
ground circuits of
keyless start control
module referring to
“Keyless Start Control
Module Power and
Ground Circuit Check in
Section 10E”. If OK,
substitute a known-
good keyless start
control module.
14CAN communication check of 4WD control module
1) Turn ignition switch to OFF position.
2) Connect combination meter connector and 4WD control
module.
3) Perform “Communication Bus Check” under “Bus
Check” on SUZUKI-SDT with ignition switch turned ON.
Are all of BCM, ECM, ABS control module, combination
meter, TCM, keyless start control module, combination
meter and 4WD control module normally displayed?Recheck DTC. Check power and
ground circuits of 4WD
control module referring
to “Step 2” and “Step 3”
under “DTC C1240:
4WD Control Module
Power Supply Circuit
Malfunction in Section
3B”. If OK, substitute a
known-good 4WD
control module. Step Action Yes No
Downloaded from www.Manualslib.com manuals search engine 1A-172 Engine General Information and Diagnosis:
Inspection of ECM and Its CircuitsS6RW0D1104072
ECM and its circuits can be checked by measuring voltage, pulse signal and resistance with special tool connected.
CAUTION!
ECM cannot be checked by itself. It is strictly prohibited to connect voltmeter or ohmmeter to ECM
with ECM connectors disconnected from it.
Voltage Check
1) Remove ECM (1) from its bracket referring to “Engine Control Module (ECM) Removal and Installation in Section
1C”.
2) Connect special tool between ECM and ECM connectors securely.
Special tool
(A): 09933–06320
3) Check voltage and/or pulse signal using voltmeter (2) and oscilloscope (3).
NOTE
• As each terminal voltage is affected by battery voltage, confirm that it is 11 V or more when ignition
switch is turned ON.
• Voltage with asterisk (*) cannot be measured with voltmeter because it is pulse signal. Use
oscilloscope for its check if necessary.
• Before this inspection, be sure to read the “Precautions of ECM Circuit Inspection”.
Viewed from harness side
1
2
3(A)
I5JB0A110073-01
E01C01
3 4
18 19 5 6 7 10 11
17 20
47 46 49 50 51 21 22
5216 259
24 14
29
55 57 54 53 59
60 582
26 27 28 15
30
56 4832 31 34 35 36 37 40 42 39 38 44
45 43 41 331 12 13
238 3 4
18 19 5 6 7 10 11
17 20
47 46 49 50 51 21 22
5216 259
24 14
29
55 57 54 53 59
60 582
26 27 28 15
30
56 4832 31 34 35 36 37 40 42 39 38 44
45 43 41 331 12 13
238
I6RW0D110051-01
Downloaded from www.Manualslib.com manuals search engine 1A-192 Engine General Information and Diagnosis:
Resistance Check
1) Remove ECM from its bracket referring to “Engine Control Module (ECM) Removal and Installation in Section 1C”.
CAUTION!
Never touch terminals of ECM itself or connect voltmeter or ohmmeter (2).
2) Connect special tool to ECM connectors (1) securely.
NOTE
Do not connect the other connector of special tool to ECM.
Special tool
(A): 09933–06320
3) Check resistance between each pair of terminals of special tool connectors (1) as listed in the following table.
CAUTION!
• Be sure to connect ohmmeter probe from wire harness side of coupler.
• Be sure to turn OFF ignition switch for this check.
• Resistance in the following table represents that measured when parts temperature is 20 °C (68 °F).
1
(A)
2
3
I7RW01110032-02
Terminals Circuit Standard resistance Condition
C01-47 to E01-29 Heater of HO2S-2 4 – 15 Ω—
E01-46 to E01-1/16 Radiator cooling fan relay No.1 160 – 240 Ω—
E01-60 to E01-29 Main relay 160 – 240 ΩBattery disconnected and
ignition switch turned ON
E01-15 to E01-29 Fuel pump relay 160 – 240 Ω—
C01-16 to E01-1/16No.3 fuel injector
10.8 – 18.2 Ω—
C01-17 to E01-1/16No.4 fuel injector
C01-4 to E01-1/16EGR valve (stepping motor No.1 coil) (if
equipped)20 – 31 Ω—
C01-29 to E01-1/16 EVAP canister purge valve 28 – 35 Ω—
C01-2 to E01-1/16 No.2 fuel injector 10.8 – 18.2 Ω—
C01-3 to E01-1/16EGR valve (stepping motor No.2 coil) (if
equipped)
20 – 31 Ω— C01-18 to E01-1/16EGR valve (stepping motor No.4 coil) (if
equipped)
C01-19 to E01-1/16EGR valve (stepping motor No.3 coil) (if
equipped)
C01-46 to E01-29 Heater of HO2S-1 2 – 11 Ω—
C01-1 to E01-1/16 No.1 fuel injector 10.8 – 18.2 Ω—
E01-29 to E01-47 A/C compressor relay (if equipped with A/C) 160 – 240 Ω—
E01-58 to E01-1/16A/C condenser cooling fan relay
(if equipped with A/C)160 – 240 Ω—
C01-60 to C01-59 Oil control valve (for engine with VVT system) 6 – 15 Ω—
E01-45 to E01-1/16 Throttle actuator control relay 160 – 240 Ω—
Downloaded from www.Manualslib.com manuals search engine Engine General Information and Diagnosis: 1A-199
Troubleshooting
NOTE
• Before performed trouble shooting, be sure to read the “Precautions of ECM Circuit Inspection”.
• When measuring circuit voltage, resistance and/or pulse signal at ECM connector, connect the
special tool to ECM and/or the ECM connectors referring to “Inspection of ECM and Its Circuits”.
Step Action Yes No
1Fuel pump control system check for operation
Is fuel pump heard to operate 2 sec. after ignition switch is
turned ON?Fuel pump circuit is in
good condition.Go to Step 2.
2Fuel pump relay power supply check
1) Disconnect fuel pump relay from individual circuit fuse
box No.1 with ignition switch turned OFF.
2) Check for proper connection to fuel pump relay at each
terminal.
3) If OK, turn ON ignition switch, measure voltage between
“BLK/WHT” wire terminal of fuel pump relay connector
and engine ground.
Is voltage 10 – 14 V?Go to Step 3. “BLK/WHT” wire is open
or shorted to ground
circuit.
3Fuel pump relay power supply check
1) Turn ON ignition switch, measure voltage between “BLK/
RED” wire terminal of fuel pump relay connector and
engine ground.
Is voltage 10 – 14 V?Go to Step 4. “BLK/RED” wire is open
circuit.
4Fuel pump relay check
1) Check fuel pump relay referring to “Main Relay, Fuel
Pump Relay, Starting Motor Control Relay, Throttle
Actuator Control Relay and Radiator Cooling Fan Relay
Inspection in Section 1C”.
Is relay in good condition?Go to Step 5. Faulty relay.
5Fuel pump relay drive signal check
1) Connect fuel pump relay to individual circuit fuse box
No.1.
2) Connect voltmeter between “E01-15” terminal of ECM
connector and vehicle body ground.
3) Measure voltage 2 second after ignition switch is turned
ON.
Is voltage 10 – 14 V?Go to Step 6. “GRN/WHT” wire is
open circuit or shorted
to ground circuit.
I2RH01110132-01
Downloaded from www.Manualslib.com manuals search engine Engine General Information and Diagnosis: 1A-213
1) Connect SUZUKI scan tool to DLC (1) with ignition
switch turned OFF.
Special tool
(A): SUZUKI scan tool (SUZUKI-SDT)2) Warm up engine to normal operating temperature.
3) Check engine idle speed and “IAC throttle opening”
by using “Data List” mode on scan tool to check “IAC
throttle opening”.
4) If check result is out of specification, inspect electric
throttle body assembly referring to “Electric Throttle
Body Assembly On-Vehicle Inspection in Section
1C”.
Engine idle speed
A/C OFF: 700 ± 50 rpm (IAC duty: 5 – 25%)
A/C ON: 750 ± 50 rpm
5) Check that specified engine idle speed is obtained
with A/C turned ON if vehicle is equipped with A/C.
If not, check A/C system referring to “A/C System
Circuits Check”.
Special Tools and Equipment
Special ToolS6RW0D1108001
(A) 1I5RW0C110011-01
09912–58432 09912–58442
Fuel pressure gauge hose Fuel pressure gauge
This tool is included in fuel
pressure gauge set (09912-
58413). )This tool is included in fuel
pressure gauge set (09912-
58413). )
09912–58490 09933–06320
3-way joint & hose ECM check harness (120P)
) ) / )
SUZUKI scan tool (SUZUKI-
SDT)
—
This kit includes following
items. 1. SUZUKI-SDT 2.
DLC3 cable 3. USB cable 4.
AC/DC power supply 5.
Voltage meter probe 6.
Storage case ) / )
1
2
34
56
Downloaded from www.Manualslib.com manuals search engine 1B-5 Aux. Emission Control Devices:
PCV Hose InspectionS6RW0D1206009
NOTE
Be sure to check that there is no obstruction
in PCV valve or its hoses before checking
IAC throttle valve opening, for obstructed
PCV valve or hose hampers its accurate
adjustment.
Check hoses for connection, leakage, clog and
deterioration.
Replace as necessary.
PCV Valve InspectionS6RW0D1206010
NOTE
Be sure to check that there is no obstruction
in PCV valve or its hoses before checking
IAC throttle valve opening, for obstructed
PCV valve or hose hampers its accurate
adjustment.
1) Detach air cleaner assembly.
2) Disconnect PCV valve from cylinder head cover and
install plug to head cover hole.
3) Install air cleaner assembly temporarily.
4) Run engine at idle.5) Place your finger over end of PCV valve (1) to check
for vacuum.
If there is no vacuum, check for clogged valve.
Replace as necessary.
6) After checking vacuum, stop engine and remove
PCV valve (1).
Shake valve and listen for rattle of check needle
inside the valve. If valve does not rattle, replace PCV
valve.
7) After checking, remove plug and install PCV valve.
8) Install air cleaner assembly securely.
Special Tools and Equipment
Special ToolS6RW0D1208001
I2RH0B120007-01
I2RH0B120008-01
09917–47011 SUZUKI scan tool (SUZUKI-
SDT)
Vacuum pump gauge —
) / )This kit includes following
items. 1. SUZUKI-SDT 2.
DLC3 cable 3. USB cable 4.
AC/DC power supply 5.
Voltage meter probe 6.
Storage case ) / )
1
2
34
56
Downloaded from www.Manualslib.com manuals search engine 1C-4 Engine Electrical Devices:
Throttle Position Sensor Performance Check
1) Remove air cleaner outlet hose.
2) Turn OFF ignition switch.
3) Disconnect connector from electric throttle body
assembly.
4) Check throttle position sensor (main and sub) output
voltage as following steps.
a) For throttle position sensor (main), arrange 3
new 1.5 V batteries (1) in series (check that total
voltage is 4.5 – 5.0 V) and connect its positive
terminal to “Vin” terminal (2) and negative
terminal to “Ground” terminal (3) of sensor. Then
using voltmeter, connect positive terminal to
“Vout 1” terminal (4) of sensor and negative
terminal to battery.
b) For throttle position sensor (sub), arrange 3 new
1.5 V batteries (1) in series (check that total
voltage is 4.5 – 5.0 V) and connect its positive
terminal to “Vin” terminal (2) and negative
terminal to “Ground” terminal (3) of sensor. Then
using voltmeter, connect positive terminal to
“Vout 2” terminal (4) of sensor and negative
terminal to battery.
c) Measure output voltage variation while throttle
valve is opened and closed as following
specification.If sensor voltage is out of specified value and linear
variation as the following graph, replace electric throttle
body assembly.
TP sensor output voltage
TP sensor (main) [A]: 0.45 – 4.88 V, varying
according to throttle valve opening by finger
(Voltage should vary by 0.04 V for each 1° valve
opening)
TP sensor (sub) [B]: 1.33 – 5.007 V, varying
according to throttle valve opening by finger
(Voltage should vary by about 0.032 V for each 1°
valve opening)
1 42 3
I4RS0B130007-02
1
3
24
I4RS0B130008-01
[C]: TP sensor (main) output voltage
[D]: TP sensor (sub) output voltage
[E]: Throttle valve opening
[F]: Position where throttle valve is open by 7° from completely closed
position (default position)
[G]: Angel obtained when accelerator pedal is depressed fully (84°)
[H]: Angle obtained when throttle valve is fully opened with finger (96°)
[B]
[A][D]
(V) [C]
(V)
[F]
[G][E] 0.45 - 0.75 0.724 - 1.036 3.675 - 4.245 4.000 - 4.880
1.33 - 1.63 1.604 - 1.9163.883 - 4.453 4.097 - 5.007
[H]
I7RW01130019-05