Page 206 of 2893

(#'
)
K20Z2 engine
6-606-60 Cylinder Head
Valve, Spring, and Valve Seal
Installation (cont’d)
Rocker Arm Assembly Installation
07757-PJ1010A
A
A A
B
5. Install the valve spring and the spring retainer.Place the end of the valve spring with the closely
wound coils toward the cylinder head.
6. Install the valve spring compressor attachment and the valve spring compressor. Compress the valve
spring, and install the valve cotters.
7. Remove the valve spring compressor and the valve spring compressor attachment.
8. Lightly tap the end of each valve stem two or three times with a plastic mallet (A) to ensure proper
seating of the valve and valve keepers. Tap the
valve stem only along its axis so you do not bend
the stem. 1. Reassemble the rocker arm assembly (see page
6-46).
2. Clean and dry the No. 5 rocker shaft holder mating surface.
3. Apply liquid gasket, P/N 08717-0004, 08718-0001, 08718-0003, or 08718-0009, evenly to the cylinder
head mating surface of the No. 5 rocker shaft
holder. Install the component within 5 minutes of
applying the liquid gasket.
NOTE: If you apply liquid gasket P/N 08718-0012, the component must be install within 4 minutes.
If too much time has passed after applying the liquid gasket, remove the old liquid gasket and
residue, then reapply new liquid gasket.
4. Insert the bolts (A) into the rocker shaft holder, then install the rocker arm assembly (B) on the cylinder
head.
Apply liquid gasket
along the broken line.
08/08/21 14:28:24 61SNR030_060_0060
ProCarManuals.com
DYNOMITE -2009-
Page 207 of 2893

(#'
)
K20Z2 engine
6-606-60 Cylinder Head
Valve, Spring, and Valve Seal
Installation (cont’d)
Rocker Arm Assembly Installation
07757-PJ1010A
A
A A
B
5. Install the valve spring and the spring retainer.Place the end of the valve spring with the closely
wound coils toward the cylinder head.
6. Install the valve spring compressor attachment and the valve spring compressor. Compress the valve
spring, and install the valve cotters.
7. Remove the valve spring compressor and the valve spring compressor attachment.
8. Lightly tap the end of each valve stem two or three times with a plastic mallet (A) to ensure proper
seating of the valve and valve keepers. Tap the
valve stem only along its axis so you do not bend
the stem. 1. Reassemble the rocker arm assembly (see page
6-46).
2. Clean and dry the No. 5 rocker shaft holder mating surface.
3. Apply liquid gasket, P/N 08717-0004, 08718-0001, 08718-0003, or 08718-0009, evenly to the cylinder
head mating surface of the No. 5 rocker shaft
holder. Install the component within 5 minutes of
applying the liquid gasket.
NOTE: If you apply liquid gasket P/N 08718-0012, the component must be install within 4 minutes.
If too much time has passed after applying the liquid gasket, remove the old liquid gasket and
residue, then reapply new liquid gasket.
4. Insert the bolts (A) into the rocker shaft holder, then install the rocker arm assembly (B) on the cylinder
head.
Apply liquid gasket
along the broken line.
08/08/21 14:28:24 61SNR030_060_0060
ProCarManuals.com
DYNOMITE -2009-
Page 208 of 2893

Î
(#'
)
Specified Torque
8x1.25mm
22 N·m (2.2 kgf·m, 16 lbf·ft)
6x1.0mm
12 N·m (1.2 kgf·m, 8.7 lbf·ft)
6 x 1.0 mm Bolts: , ,
K20Z3 engine
6-616-61
C A B
A A
B
5. Remove the bolts from the rocker shaft holder.
6. Make sure the punch marks on the variable valvetiming control (VTC) actuator and the exhaust
camshaft sprocket are facing up, then set the
camshafts (A) in the holder. Apply new engine oil to
the camshaft journals and lobes.
7. Set the camshaft holders (C) and cam chain guide B in place.
8. Tighten the bolts to the specified torque.
9. Install the cam chain (see page 6-21), then adjust the valve clearance (see page 6-12). 1. Reassemble the rocker arm assembly (see page
6-47).
2. Clean and dry the No. 5 rocker shaft holder mating surface.
3. Apply liquid gasket, P/N 08717-0004, 08718-0001, 08718-0003, or 08718-0009, evenly to the cylinder
head mating surface of the No. 5 rocker shaft
holder. Install the component within 5 minutes of
applying the liquid gasket.
NOTE: If you apply liquid gasket P/N 08718-0012, the component must be install within 4 minutes.
If too much time has passed after applying the liquid gasket, remove the old liquid gasket and
residue, then reapply new liquid gasket.
4. Insert the bolts (A) into the rocker shaft holder, then install the rocker arm assembly (B) on the cylinder
head.
5. Remove the bolts from the rocker shaft holder. (cont’d)
Apply liquid gasket
along the broken line.
08/08/21 14:28:40 61SNR030_060_0061
ProCarManuals.com
DYNOMITE -2009-
Page 209 of 2893

Î
Î
(#'
)
Specified Torque
8x1.25mm
22 N·m (2.2 kgf·m, 16 lbf·ft)
6x1.0mm
12 N·m (1.2 kgf·m, 8.7 lbf·ft)
6 x 1.0 mm Bolts: , ,
6-626-62 Cylinder Head
Rocker Arm Assembly Installation
(cont’d)
Cylinder Head Installation
C
A B
A
B
A
B
6. Make sure the punch marks on the variable valve timing control (VTC) actuator and the exhaust
camshaft sprocket are facing up, then set the
camshafts (A) in the holder. Apply new engine oil to
the camshaft journals and lobes.
7. Set the camshaft holders (C) and cam chain guide B in place.
8. Tighten the bolts in sequence to the specified torque.
NOTE: If the engine does not have bolt , skip it
and continue the torque sequence.
9. Install the cam chain (see page 6-21), then adjust the valve clearance (see page 6-14). 1. Install a new coolant separator (A) in the engine
block whenever the engine block is replaced.
2. Clean the cylinder head and the engine block surface.
3. Install the new cylinder head gasket (A) and the dowel pins (B) on the engine block. Always use a
new cylinder head gasket.
08/08/21 14:28:42 61SNR030_060_0062
ProCarManuals.com
DYNOMITE -2009-
Page 210 of 2893

Î
Î
(#'
)
Specified Torque
8x1.25mm
22 N·m (2.2 kgf·m, 16 lbf·ft)
6x1.0mm
12 N·m (1.2 kgf·m, 8.7 lbf·ft)
6 x 1.0 mm Bolts: , ,
6-626-62 Cylinder Head
Rocker Arm Assembly Installation
(cont’d)
Cylinder Head Installation
C
A B
A
B
A
B
6. Make sure the punch marks on the variable valve timing control (VTC) actuator and the exhaust
camshaft sprocket are facing up, then set the
camshafts (A) in the holder. Apply new engine oil to
the camshaft journals and lobes.
7. Set the camshaft holders (C) and cam chain guide B in place.
8. Tighten the bolts in sequence to the specified torque.
NOTE: If the engine does not have bolt , skip it
and continue the torque sequence.
9. Install the cam chain (see page 6-21), then adjust the valve clearance (see page 6-14). 1. Install a new coolant separator (A) in the engine
block whenever the engine block is replaced.
2. Clean the cylinder head and the engine block surface.
3. Install the new cylinder head gasket (A) and the dowel pins (B) on the engine block. Always use a
new cylinder head gasket.
08/08/21 14:28:42 61SNR030_060_0062
ProCarManuals.com
DYNOMITE -2009-
Page 211 of 2893

6-63
A
B
B50 mm (2.0 in.)
45 mm (1.8 in.)
A
FIRST STEP
SECOND STEP
THIRD STEP
(New bolt)
4. Set the crankshaft to top dead center (TDC). Align
the TDC mark (A) on the crankshaft sprocket with
the pointer (B) on the engine block.
5. Set the camshaft pulley to TDC (see step 2 on page 6-21).
6. Install the cylinder head on the engine block.
7. Measure the diameter of each cylinder head bolt at point A and point B.
8. If either diameter is less than 10.6 mm (0.42 in.), replace the cylinder head bolt. 9. Apply new engine oil to the threads and under the
bolt heads of all cylinder head bolts.
10. Tighten the cylinder head bolts in sequence to 39 N·m (4.0 kgf·m, 29 lbf·ft). Use a beam-type
torque wrench. When using a preset click-type
torque wrench, be sure to tighten slowly and do not
overtighten. If a bolt makes any noise while you are
torquing it, loosen the bolt and retighten it from the
first step.
11. After torquing, tighten all cylinder head bolts in two steps (90 ° per step) using the sequence shown in
step 10. If you are using a new cylinder head bolt,
tighten the bolt an extra 90 °.
NOTE: Remove the cylinder head bolt if you
tightened it beyond the specified angle, and go
back to step 6 of the procedure. Do not loosen it
back to the specified angle.
(cont’d)
08/08/21 14:28:42 61SNR030_060_0063
ProCarManuals.com
DYNOMITE -2009-
Page 212 of 2893

6-64Cylinder Head
Cylinder Head Installation (cont’d)
B
A
8 x 1.25 mm
22 N·m (2.2 kgf·m, 16 lbf·ft) A
B
A
B
6x1.0mm
12 N·m
(1.2 kgf·m, 8.7 lbf·ft)
12. Install the rocker arm assembly:
K20Z2 engine (see page 6-60)
K20Z3 engine (see page 6-61)
13. Install the cam chain (see page 6-21).
14. Connect the following engine wire harness connectors, and install the wire harness clamps to
the cylinder head:
Four fuel injector connectors
Engine coolant temperature (ECT) sensor 1 connector
Camshaft position (CMP) sensor A (Intake) connector
Camshaft position (CMP) sensor B (Exhaust) connector
Rocker arm oil control valve connector
Rocker arm oil pressure switch connector
EVAP canister purge valve connector
Variable valve timing control (VTC) oil control solenoid valve connector
Exhaust gas recirculation (EGR) valve connector (K20Z2 engine)
Engine oil pressure switch connector
15. Install the bolt (A) securing the connecting pipe.
16. Connect the water bypass hose (B). 17. Connect the upper radiator hose (A) and the heater
hoses (B).
18. Install the harness holder bracket (A), then install the harness holder (B).
08/08/21 14:28:43 61SNR030_060_0064
ProCarManuals.com
DYNOMITE -2009-
Page 213 of 2893

6-65
A
B6x1.0mm
12 N·m
(1.2 kgf·m, 8.7 lbf·ft)
B
A A
B
19. Connect the positive crankcase ventilation (PCV)hose (A) (K20Z2 engine) and install the ground
cable (B).
20. Connect the fuel feed hose (A) (see page 11-331), then install the quick-connect fitting cover (B). 21. Connect the evaporative emission (EVAP) canister
hose (A) and the brake booster vacuum hose (B).
22. Install the exhaust manifold (see page 9-11).
23. Install the intake manifold: K20Z2 engine (see page 9-4)
K20Z3 engine (see page 9-9)
24. Install the drive belt (see page 4-31).
25. Install the air cleaner assembly (see page 11-345).
26. After installation, check that all tubes, hoses and connectors are installed correctly.
27. Inspect for fuel leaks. Turn the ignition switch to ON (II) (do not operate the starter) so that the fuel
pump runs for about 2 seconds and pressurizes the
fuel line. Repeat this operation three times, then
check for fuel leakage at any point in the fuel line.
(cont’d)
08/08/21 14:28:44 61SNR030_060_0065
ProCarManuals.com
DYNOMITE -2009-