Page 61 of 4555
PREPARATION
EM-7
[QR]
C
D
E
F
G
H
I
J
K
L
MA
EM
PREPARATIONPFP:00002
Special Service ToolsEBS00L7N
Tool number
Tool nameDescription
KV10111100
Seal cutterRemoving oil pan and timing chain case
ST0501S000
Engine stand assembly
1. ST05011000
Engine stand
2. ST05012000
BaseDisassembling and assembling
KV10106500
Engine stand shaft
KV10115300
Engine sub-attachment
KV10116200
Valve spring compressor
1. KV10115900
Attachment
2. KV10109220
AdapterDisassembling and assembling valve
mechanism
Part (1) is a component of KV10116200, but
Part (2) is not so.
KV10112100
Angle wrenchTightening bolts for bearing cap, cylinder
head, etc.
KV10117100
Heated oxygen sensor wrenchLoosening or tightening heated oxygen
sensors with 22 mm (0.87 in) hexagon nut
S-NT046
NT042
NT028
ZZA1078D
PBIC1650E
S-NT014
NT379
Page 186 of 4555
EM-132
[YD22DDTi]
PREPARATION
PREPARATIONPFP:00002
Special Service ToolsEBS00LR6
Tool number
Tool nameDescription
ST0501S000
Engine stand assembly
1. ST05011000
Engine stand
2. ST05012000
BaseDisassembling and assembling
KV10106500
Engine stand shaft
KV11105900
Engine sub-attachmentUsed with KV10106500
KV10115600
Valve oil seal driftInstalling valve oil seal
Use side A.
Side A
a: 20 (0.79) dia.
b: 13 (0.51) dia.
c: 10.3 (0.406) dia.
d: 8 (0.31) dia.
e: 10.7 (0.421)
f: 5 (0.20)
Unit: mm (in)
KV10107902
Valve oil seal puller
1. KV10116100
Valve oil seal puller adapterRemoving valve oil seal
KV11103000
Pulley pullerRemoving crankshaft pulley
ED19600610
Compression gauge adapterChecking compression pressure
NT042
NT028
NT799
NT603
S-NT605
NT676
ZZA1188D
Page 326 of 4555
LU-4
[QR]
PREPARATION
PREPARATIONPFP:00002
Special Service ToolsEBS00KO0
Commercial Service ToolsEBS011TG
Tool number
Tool nameDescription
ST25051001
Oil pressure gaugeMeasuring oil pressure
Maximum measuring range:
2,452 kPa (24.52 bar, 25 kg/cm
2 , 356 psi)
ST25052000
HoseAdapting oil pressure gauge to cylinder block
KV10115801
Oil filter wrenchRemoving and installing oil filter
a: 64.3 mm (2.531 in)
WS39930000
Tube presserPressing the tube of liquid gasket
S-NT050
S-NT559
S-NT375
S-NT052
Tool nameDescription
Deep socketRemoving and installing oil pressure switch
a: 26 mm (1.02 in)
PBIC2072E
Page 340 of 4555
LU-18
[YD22DDTi]
PREPARATION
PREPARATIONPFP:00002
Special Service ToolsEBS00B01
Commercial Service ToolsEBS011WH
Tool number
Tool nameDescription
ST25051001
Oil pressure gaugeMeasuring oil pressure
Maximum measuring range:
2,452 kPa (25 kg/cm2, 356 psi)
ST25052000
HoseAdapting oil pressure gauge to cylinder block
S-NT050
S-NT559
Tool nameDescription
Deep socketRemoving and installing oil pressure switch
a: 26 mm (1.02 in)
PBIC2072E
Page 1662 of 4555
![NISSAN X-TRAIL 2005 Service Repair Manual EC-1258
[YD (WITH EURO-OBD)]
DTC P1268 - P1271 FUEL INJECTOR
DTC Confirmation ProcedureEBS011DK
CAUTION:
Always drive vehicle in safe manner according to traffic conditions and obey all traffic laws NISSAN X-TRAIL 2005 Service Repair Manual EC-1258
[YD (WITH EURO-OBD)]
DTC P1268 - P1271 FUEL INJECTOR
DTC Confirmation ProcedureEBS011DK
CAUTION:
Always drive vehicle in safe manner according to traffic conditions and obey all traffic laws](/manual-img/5/57403/w960_57403-1661.png)
EC-1258
[YD (WITH EURO-OBD)]
DTC P1268 - P1271 FUEL INJECTOR
DTC Confirmation ProcedureEBS011DK
CAUTION:
Always drive vehicle in safe manner according to traffic conditions and obey all traffic laws when driv-
ing.
NOTE:
If DTC Confirmation Procedure has been previously conducted, always turn ignition switch OFF and wait at
least 10 seconds before conducting the next test.
WITH CONSULT-II
1. Turn ignition switch ON, and select “DATA MONITOR” mode
with CONSULT-II.
2. Restart engine and let it idle for about 15 minutes.
3. If DTC is detected, go to EC-1261, "
Diagnostic Procedure" .
If DTC is not detected, go to next step.
4. Drive vehicle and maintain the following conditions for at least
60 seconds.
5. If DTC is detected, go to EC-1261, "
Diagnostic Procedure" .
WITH GST
Follow the procedure “WITH CONSULT-II” above.
CKPS·RPM 700 - 2000 rpm (A constant rotation is maintained)
COOLAN TEMP/S Less than 75°C (167°F)
Shift lever Suitable position
Accelerator pedal Hold the accelerator pedal as steady as possible.
PBIB2156E
Page 2001 of 4555
![NISSAN X-TRAIL 2005 Service Repair Manual DTC P1268 - P1271 FUEL INJECTOR
EC-1597
[YD (WITHOUT EURO-OBD)]
C
D
E
F
G
H
I
J
K
L
MA
EC
DTC Confirmation ProcedureEBS01271
CAUTION:
Always drive vehicle in safe manner according to traffic conditi NISSAN X-TRAIL 2005 Service Repair Manual DTC P1268 - P1271 FUEL INJECTOR
EC-1597
[YD (WITHOUT EURO-OBD)]
C
D
E
F
G
H
I
J
K
L
MA
EC
DTC Confirmation ProcedureEBS01271
CAUTION:
Always drive vehicle in safe manner according to traffic conditi](/manual-img/5/57403/w960_57403-2000.png)
DTC P1268 - P1271 FUEL INJECTOR
EC-1597
[YD (WITHOUT EURO-OBD)]
C
D
E
F
G
H
I
J
K
L
MA
EC
DTC Confirmation ProcedureEBS01271
CAUTION:
Always drive vehicle in safe manner according to traffic conditions and obey all traffic laws when driv-
ing.
NOTE:
If DTC Confirmation Procedure has been previously conducted, always turn ignition switch OFF and wait at
least 10 seconds before conducting the next test.
WITH CONSULT-II
1. Turn ignition switch ON, and select “DATA MONITOR” mode
with CONSULT-II.
2. Restart engine and let it idle for about 15 minutes.
3. If DTC is detected, go to EC-1600, "
Diagnostic Procedure" .
If DTC is not detected, go to next step.
4. Drive vehicle and maintain the following conditions for at least
60 seconds.
5. If DTC is detected, go to EC-1600, "
Diagnostic Procedure" .
WITHOUT CONSULT-II
1. Start engine and let it idle for about 15 minutes.
2. Turn ignition switch OFF, wait at least 10 seconds and then turn ON.
3. Perform Diagnostic Test Mode II (Self-diagnostic results) with ECM.
4. If DTC is detected, go to EC-1600, "
Diagnostic Procedure" .
If DTC is not detected, go to next step.
5. Set voltmeter probes between ECM terminal 70 (engine coolant temperature sensor signal) and ground.
6. Restart engine and drive vehicle and maintain the following conditions for at least 60 seconds.
7. Turn ignition switch OFF, wait at least 10 seconds and then turn ON.
8. Perform Diagnostic Test Mode II (Self-diagnostic results) with ECM.
9. If DTC is detected, go to EC-1600, "
Diagnostic Procedure" .
CKPS·RPM 700 - 2000 rpm (A constant rotation is maintained)
COOLAN TEMP/S Less than 75°C (167°F)
Shift lever Suitable position
Accelerator pedal Hold the accelerator pedal as steady as possible.
PBIB2156E
Engine speed· 700 - 2000 rpm (A constant rotation is maintained)
Voltage between ECM
terminal 70 and groundMore than 0.6V
Shift lever Suitable position
Accelerator pedal Hold the accelerator pedal as steady as possible.
Page 2160 of 4555

MT-4
PREPARATION
PREPARATIONPFP:00002
Special Service ToolsECS008BN
Tool number
Tool nameDescription
KV381054S0
Puller
Removing differential side bearing outer
race
Removing mainshaft front bearing
ST35321000
Drift
a: 49 mm (1.93 in) dia.
b: 41 mm (1.61 in) dia.
Installing input shaft oil seal
Installing reverse main gear
Installing 1st main gear bushing
Installing 1st-2nd synchronizer hub
assembly
Installing 2nd main gear bushing
Installing 3rd main gear
Removing differential side bearing (clutch
housing side for 4WD models)
ST30720000
Drift
a: 77 mm (3.03 in) dia.
b: 55.5 mm (2.185 in) dia.
Installing differential side oil seal
Installing differential side bearing outer race
Installing mainshaft rear bearing
Installing differential side bearing
ST33200000
Drift
a: 60 mm (2.36 in) dia.
b: 44.5 mm (1.752 in) dia.
Installing mainshaft front bearing
Installing 6th input gear bushing
(RS6F51A)
Installing 4th main gear
Installing 5th main gear
Installing 6th main gear (RS6F51A)
KV40105320
Drift
a: 88 mm (3.46 in) dia.Installing differential side bearing outer race
ST33061000
Drift
a: 38 mm (1.50 in) dia.
b: 28.5 mm (1.122 in) dia.
Installing bore plug
Removing differential side bearing (clutch
housing side for 2WD models)
Removing differential side bearing
(transaxle case side for 4WD models)
ZZA0601D
ZZA1000D
ZZA0811D
ZZA1002D
ZZA0898D
ZZA1000D
Page 2161 of 4555

PREPARATION
MT-5
D
E
F
G
H
I
J
K
L
MA
B
MT
ST33052000
Drift
a: 22 mm (0.87 in) dia.
b: 28 mm (1.10 in) dia.Installing welch plug
Removing input shaft rear bearing
Removing input shaft bearing spacer and
5th stopper (RS5F51A)
Removing 5th input gear bushing, thrust
washer, 4th input gear, 4th input gear
bushing, 3rd-4th synchronizer hub
assembly and 3rd input gear
Installing input shaft front bearing
Removing 6th input gear and 6th input gear
bushing (RS6F51A)
Removing mainshaft rear bearing
Removing 4th main gear and 5th main gear
Removing 6th main gear (RS6F51A)
KV40105020
Drift
a: 39.7 mm (1.563 in) dia.
b: 35 mm (1.38 in) dia.
c: 15 mm (0.59 in)
Removing 5th input gear, 5th synchronizer
hub assembly (RS5F51A) and 5th-6th
synchronizer hub assembly (RS6F51A)
Removing 3rd main gear, 2nd main gear,
2nd main gear bushing, 1st-2nd
synchronizer hub assembly, 1st main gear,
reverse main gear and 1st main gear
bushing
KV40105710
Press stand
a: 46 mm (1.81 in) dia.
b: 41 mm (1.61 in)
Installing 3rd-4th synchronizer hub
assembly
Installing 4th input gear bushing
Installing 5th input gear bushing
Installing 5th synchronizer hub assembly
(RS5F51A)
Installing 5th-6th synchronizer hub
assembly (RS6F51A)
Installing 2nd main gear bushing
Installing 3rd main gear
ST38220000
Press stand
a: 63 mm (2.48 in) dia.
b: 65 mm (2.56 in)
Installing reverse main gear
Installing 1st main gear bushing
Installing 1st-2nd synchronizer hub
assembly
ST30032000
Drift
a: 80 mm (3.15 in) dia.
b: 38 mm (1.50 in) dia.
c: 31 mm (1.22 in) dia.
Installing 5th stopper and input shaft
bearing spacer (RS5F51A)
Installing input shaft front bearing
ST30901000
Drift
a: 79 mm (3.11 in) dia.
b: 45 mm (1.77 in) dia.
c: 35.2 mm (1.386 in) dia.
Installing input shaft rear bearing
Installing 4th main gear
Installing 5th main gear
Installing 6th main gear (RS6F51A)
Installing mainshaft rear bearing Tool number
Tool nameDescription
ZZA1023D
ZZA1133D
ZZA1058D
ZZA1058D
ZZA0978D
ZZA0978D