ENGINE ASSEMBLY EM-241
[VK45DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
Preparation
1. Release fuel pressure. Refer to EC-789, "FUEL PRESSURE RELEASE" .
2. Drain engine coolant from radiator. Refer to CO-37, "
Changing Engine Coolant" .
CAUTION:
Perform this step when engine is cold.
Do not spill engine coolant on drive belts.
3. Disconnect both battery terminal. Refer to SC-4, "
BATTERY" .
4. Remove crankshaft position sensor (POS) from transmission. CAUTION:
Handle carefully to avoid dropping and shocks.
Do not disassemble.
Do not allow metal powder to adhere to magnetic part at sensor tip.
Do not place sensors in a location where they are exposed to magnetism.
5. Remove the following parts:
Hood assembly; Refer to BL-13, "HOOD" .
Engine cover; Refer to EM-172, "ENGINE ROOM COVER" .
Front and rear engine undercover
Air duct (inlet), air duct and air cleaner case assembly; Refer to EM-176, "AIR CLEANER AND AIR
DUCT" .
Drive belts; Refer to EM-173, "DRIVE BELTS" .
Radiator and radiator hoses (upper and lower); Refer to CO-41, "RADIATOR" .
Front road wheels and tires
Engine Room LH
1. Disconnect engine room harness from the engine side and set it aside for easier work.
2. Disconnect heater hoses, and install plugs to avoid leakage of engine coolant.
3. Disconnect ground cable from exhaust manifold cover to vehicle.
4. Disconnect vacuum hose between vehicle and engine and set it aside.
5. Discharge refrigerant from A/C circuit. Refer to ATC-138, "
REFRIGERANT LINES" .
6. Remove A/C piping from A/C compressor, and temporarily fasten it on vehicle with a rope. Refer to AT C -
140, "Components" .
Engine Room RH
1. Disconnect fuel feed hose and EVAP hose. Refer to EM-192, "FUEL INJECTOR AND FUEL TUBE" .
CAUTION:
Fit plugs onto disconnected hose to prevent fuel leak.
2. Disconnect engine room harness from the engine side and set it aside for easier work.
3. Disconnect ground cable from exhaust manifold cover to vehicle.
4. Disconnect vacuum hose between vehicle and engine and set it aside.
5. Disconnect reservoir tank of power steering oil pump from engine, and move it aside for easier work. CAUTION:
When temporarily securing, keep reservoir tank upright to avoid a fluid leak.
Vehicle Underbody
1. Remove front cross bar. Refer to FSU-6, "FRONT SUSPENSION ASSEMBLY" .
2. Disconnect power steering oil pump from engine. Move it from its location and secure with a rope for eas- ier work. Refer to PS-33, "
Removal and Installation (VK45DE Models)" .
3. Remove A/T fluid cooler tube. Refer to AT- 2 7 0 , "
TRANSMISSION ASSEMBLY" .
4. Remove exhaust front tube and center muffler with power tool. Refer to EX-3, "
EXHAUST SYSTEM" .
5. Remove RH and LH transverse link mounting bolts and nuts. Refer to FSU-14, "
TRANSVERSE LINK" .
6. Disconnect stabilizer connecting rod lower. Refer to FSU-6, "
FRONT SUSPENSION ASSEMBLY" .
7. Remove A/T control rod at control device assembly side. Then temporarily secure it on transmission, so that it does not sag. Refer to AT- 2 3 3 , "
SHIFT CONTROL SYSTEM" .
ENGINE ASSEMBLY EM-243
[VK45DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
Separation Work
1. Change engine slinger installing to cylinder head (right bank).
NOTE:
In order to keep secure position when hoisting engine.
2. Remove engine mounting insulators (RH and LH) under side nut with power tool.
3. Lift with hoist and separate engine and transmission assembly from front suspension member. CAUTION:
Before and during this lifting, always make sure that any harnesses are left connected.
Avoid damage to and oil/grease smearing or spills onto engine mounting insulator.
4. Remove alternator. Refer to SC-23, "
CHARGING SYSTEM" .
5. Remove starter motor. Refer to SC-10, "
STARTING SYSTEM" .
6. Separate engine from transmission assembly. Refer to AT- 2 7 3 , "
Removal and Installation (AWD Models)"
.
7. Remove front final drive from engine. Refer to FFD-12, "
FRONT FINAL DRIVE ASSEMBLY" .
8. Remove engine mounting insulators (RH and LH) and brackets (RH and LH) from engine with power tool.
9. Remove engine rear member and engine mounting insulator (rear) from transmission.
INSTALLATION
Note the following, and install in the reverse order of removal.
Do not allow engine mounting insulator to be damage and careful no engine oil gets on it.
For a location with a positioning pin, insert it securely into hole of mating part.
For a part with a specified installation orientation, refer to component figure in EM-240, "Removal and
Installation" .
When installing engine mounting brackets (RH and LH) on cylin-
der block, tighten two upper bolts (shown as “A” in the figure)
first. Then tighten two lower bolts (shown as “B” in the figure).
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The followings are procedures for checking fluids leak, lubricates leak and exhaust gases leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-12, "
RECOMMENDED FLUIDS AND LUBRICANTS"
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of fuel, exhaust gases, or any oil/fluids
including engine oil and engine coolant. Slinger bolts:
:33.4 N·m (3.4 kg-m, 25 ft-lb)
PBIC2447E
PBIC2365E
EM-244
[VK45DE]
ENGINE ASSEMBLY
Revision: 2005 July 2005 FX
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid. power steering fluid, brake fluid, etc. Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
Exhaust gases — Leakage —
CYLINDER BLOCK EM-247
[VK45DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
–Rocker cover; Refer to EM-197, "ROCKER COVER" .
–Other removable brackets
NOTE:
The figure shows an example of widely use engine stand that
can hold mating surface of transmission with drive plate and rear
plate removed.
CAUTION:
Before removing the hanging chains, make sure the engine
stand is stable and there is no risk of overturning.
4. Drain engine oil. Refer to LU-27, "
Changing Engine Oil" .
5. Drain engine coolant from inside engine by removing water drain plugs “B” as shown in the figure.
6. Remove the following parts and related parts (The parts listed in step 3 are not included here.)
Oil pan and oil strainer; Refer to EM-185, "OIL PAN AND OIL STRAINER" .
Crankshaft pulley, front cover and timing chain; Refer to EM-200, "TIMING CHAIN" .
Camshaft; Refer to EM-212, "CAMSHAFT" .
Cylinder head; Refer to EM-229, "CYLINDER HEAD" .
7. Remove knock sensor. CAUTION:
Carefully handle sensor, avoiding shocks.
8. Remove piston and connecting rod assembly as follows:
Before removing piston and connecting rod assembly, check the connecting rod side clearance. Refer
to EM-262, "
CONNECTING ROD SIDE CLEARANCE" .
a. Position crankshaft pin corresponding to connecting rod to be removed onto the bottom dead center.
b. Remove connecting rod bearing cap.
c. Using hammer handle or similar tool, push piston and connect- ing rod assembly out to the cylinder head side.
CAUTION:
Be careful not to damage the cylinder wall and crankshaft
pin, resulting from an interference of the connecting rod big
end.
9. Remove connecting rod bearings from connecting rod and connecting rod bearing cap. CAUTION:
Identify installation positions, and store them without mixing them up.
PBIC0085E
PBIC1265E
PBIC0086E
CYLINDER BLOCK EM-249
[VK45DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
14. Remove main bearing cap as follows:
Before loosening main bearing cap bolts, measure the crankshaft end play. Refer to EM-262, "CRANK-
SHAFT END PLAY" .
Loosen main bearing cap bolts in several different steps.
a. Remove cover attached to the rear left side of cylinder block (next to the starter motor housing).
NOTE:
Bolts (No. 27 shown in the figure) are installed on the inside of
cover.
b. Loosen side bolts (M10) starting from 30 to 21 to remove.
c. Loosen main bearing cap sub bolts (M9) starting from 20 to 11 to remove.
d. Loosen main bearing cap bolts (M12) starting from 10 to 1 to remove.
e. Using main bearing cap remover (SST), remove main bearing cap.
15. Remove crankshaft.
16. Remove main bearings and thrust bearings from cylinder block and main bearing caps. CAUTION:
Identify installation positions, and store them without mixing them up.
17. If pilot converter must be removed, remove it from the rear end of the crankshaft using pilot bushing puller (SST).
It is possible to remove pilot converter without hoisting engine
with engine stand.
ASSEMBLY
1. Fully air-blow engine coolant and engine oil passages in cylinder block, cylinder bore and crankcase to remove any foreign material.
CAUTION:
Use a goggles to protect your eye.
PBIC0090E
PBIC0091E
PBIC0092E
CYLINDER BLOCK EM-265
[VK45DE]
C
D E
F
G H
I
J
K L
M A
EM
Revision: 2005 July 2005 FX
Piston Pin Outer Diameter
Measure the outer diameter of piston pin with micrometer.
Connecting Rod Bushing Oil Clearance
(Connecting rod bushing oil clearance) = (Connecting rod bushing inner diameter) – (Piston pin outer diame-
ter)
If the calculated value exceeds the limit, replace connecting rod assembly and/or piston and piston pin
assembly.
If replacing piston and piston pin assembly, refer to EM-255, "HOW TO SELECT PISTON" .
If replacing connecting rod assembly, refer to EM-269, "CON-
NECTING ROD BEARING OIL CLEARANCE" to select the con-
necting rod bearing.
Factory installed parts grading:
Service parts apply only to grade “0”.
Unit: mm (in)
*: After installing in connecting rod
CYLINDER BLOCK DISTORTION
Using scraper, remove gasket on the cylinder block surface, and also remove engine oil, scale, carbon, or
other contamination.
CAUTION:
Be careful not to allow gasket flakes to enter engine oil or engine coolant passages. Standard : 21.989 - 22.001 mm (0.8657 - 0.8662 in)
PBIC0117E
Standard : 0.005 - 0.017 mm (0.0002 - 0.0007 in)
Limit : 0.030 mm (0.0012 in)
PBIC2164E
Grade 0 1
Connecting rod bushing
inner diameter * 22.000 - 22.006
(0.8661 - 0.8664) 22.006 - 22.012
(0.8664 - 0.8666)
Piston pin hole diameter 21.993 - 21.999
(0.8659- 0.8661) 21.999 - 22.005
(0.8661 - 0.8663)
Piston pin outer diameter 21.989 - 21.995
(0.8657 - 0.8659) 21.995 - 22. 001
(0.8659 - 0.8662)
PBIC2372E
FSU-2
PRECAUTIONS
Revision: 2005 July 2005 FX
PRECAUTIONSPFP:00001
CautionAES000MZ
When installing rubber bushings, final tightening must be carried out under unladen conditions with tires
on ground. Oil will shorten the life of rubber bushings. Be sure to wipe off any spilled oil.
Unladen conditions mean that fuel, engine coolant and lubricant are full. Spare tire, jack, hand tools and
mats are in designated positions.
After servicing suspension parts, be sure to check wheel alignment.
Caulking nuts are not reusable. Always use new ones when installing. Since new caulking nuts are pre-
oiled, tighten as they are.
Avoid burden to front cross bar.
FSU-6
FRONT SUSPENSION ASSEMBLY
Revision: 2005 July 2005 FX
FRONT SUSPENSION ASSEMBLYPFP:54010
On-Vehicle Inspection and ServiceAES000N3
Make sure the mounting conditions (looseness, back lash) of each component and component statues (wear,
damage) are normal.
INSPECTION OF TRANSVERSE LINK BALL JOINT END PLAY
1. Set front wheels in a straight-ahead position. Do not depress brake pedal.
2. Measure axial end play by installing and moving up/down between transverse link and steering knuckle with an iron pry bar or something similar.
CAUTION:
Be careful not to damage ball joint boot.
STRUT INSPECTION
Check strut for oil leakage, damage and replace if necessary. Refer to FSU-11, "COIL SPRING AND STRUT" .
Wheel Alignment InspectionAES000N4
DESCRIPTION
Measure wheel alignment under unladen conditions.
NOTE:
Unladen conditions mean that fuel, engine coolant, and lubricant are full. Spare tire, jack, hand tools and mats
are designated positions.
PRELIMINARY CHECK
1. Check tires for improper air pressure and wear.
2. Check road wheels for runout.
3. Check wheel bearing axial end play.
4. Check transverse link ball joint axial end play.
5. Check strut operation.
6. Check each mounting part of axle and suspension for looseness and deformation.
7. Check each link, rod and member for cracks, deformation and other damage.
8. Check vehicle posture.
INSPECTION OF CAMBER, CASTER AND KINGPIN INCLINATION ANGLES
Camber, caster, kingpin inclination angles cannot be adjusted.
Before inspection, mount front wheels onto turning radius gauge. Mount rear wheels onto a stand that has
same height so vehicle will remain horizontal.
Using a CCK Gauge
Install CCK gauge attachment (SST: KV991040S0) as following procedure in wheel, then measure wheel
alignment.
1. Remove wheel nuts (3), and install a guide bolt to hub bolt.
2. Screw adapter into plate body until it contacts body tightly.
3. Screw center plate into plate.
4. Insert plate on guide bolt. Put spring in, and then evenly screw both guide bolt nut. When fastening guide bolt nut, do not com-
pletely compress spring. Axial end play : 0 mm (0 in)
SEIA0240E