Page 249 of 462
Downloaded from www.Manualslib.com manuals search engine 243
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Checking and setting the timing.
Raise and support the vehicle, wheels hanging.
Disconnect the battery.
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line at the flexible pipe.
- Disconnect the connecteur at «a».
Remove the accessories drive belt
(see corresponding operation).
Support the engine with a roller jack equipped with a block.
Remove the four screws (5), the three screws (4)and the engine supports (3).
B1BP38TD
B1BP38UD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 243
Page 254 of 462

Downloaded from www.Manualslib.com manuals search engine 248
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
IMPERATIVE: Should it be impossible to peg the camshaft, check that the offset between the camshaft hole and the pegging hole is not
more than 1 mm. If the offset is too great, repeat the operation to position the timing belt
(see corresponding operation).
Remove the tools [2]and [3].
Refit tool [1]at «b».
Remove the screw (8).
Refit:
- The upper timing cover (11).
- The lower timing cover (12).
- The pulley (9).
- The screw (8).
Tightening methodfor the screw (8):
- Pre-tighten to 3 ± 0,3 m.daN.
- Angular tighten 180° ± 5°.
Remove tool [1].Refit:
- The engine support (7), tighten to 5,5 ± 0,9 m.daN.
- The engine support (3).
- The four screws (5), tighten to 5,5 ± 0,8 m.daN.
- The three screws (4), tighten to 5,5 ± 0,8 m.daN.
- The electrical harness (6).
Disengage the jack from under the engine.
Complete the refitting.
IMPERATIVE: Carry out the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 248
Page 255 of 462
Downloaded from www.Manualslib.com manuals search engine 249
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories drive belt
(see corresponding operation).
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line
(at the flexible pipe).
Disconnect the connecter at «a».
Remove and move aside the power steering fluid reservoir (6).
Uncouple, plug and move aside the tube (2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports (4)and (5).
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 249
Page 257 of 462

Downloaded from www.Manualslib.com manuals search engine 251
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refit the screw (10).
Rotate the crankshaft six times
(clockwise).
IMPERATIVE: Never turn it backwards.
Peg the camshaft at «c», using tool [2]
(oil the peg).
WARNING: The magnetic track should not show any sign of damage and should not be
approached by any other magnetic source.
Peg the crankshaft at «d», using tool [3].
ESSENTIAL: Should it not be possible to peg the camshaft, check that the offset between
the camshaft pinion hole and the pegging hole is not more than 1 mm. If it is more, repeat
the operation to position the timing belt
(see corresponding operation).
Note: The index «e»of the dynamic tensioner roller should be centred in the interval «d».
Check the correct positioning of the index «e».
If it is not correct, repeat the operation to tension the timing belt
(see corresponding operation).
Remove tools [2] and [3].
B1EP1E4D
B1EP1E5C
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 251
Page 258 of 462
![Citroen C4 2005 2.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The uppe Citroen C4 2005 2.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The uppe](/manual-img/9/4138/w960_4138-257.png)
Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The upper timing cover (12).
- The lower timing cover (11).
- The accessories drive pulley (9).
- The screw (10).
Tightening torque
Screw (10)Pre-tighten to : 3 ± 0,3 m.daN.
Angular tighten : 180° ± 5°.
Remove tool [1].
Refit:
- The engine support (8), tighten to 5,5 ± 0,4 m.daN.
- The engine support (4), tighten to 6,1 ± 0,6 m.daN.
- The engine support (5), tighten to 2,5 ± 0,2 m.daN.
- The electrical harness (7).
- The power steering fluid reservoir (6).
XSARA PICASSO
Couple:
- The tube (2).
- The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
- The fuel unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
- The accessories drive belt
(see corresponding operation).
- The front RH splash-shield (see corresponding operation).
- The front RH wheel, tighten to 9 ± 1 m.daN.
- Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 252
Page 259 of 462
Downloaded from www.Manualslib.com manuals search engine 253
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1]Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3] Crankshaft setting peg: (-).0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories drive belt
(see corresponding operation).
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line
(at the flexible pipe).
Disconnect the connecter at «a».
Remove and move aside the power steering fluid reservoir (6).
Uncouple, plug and move aside the tube (2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports(4)and (5).
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 253
Page 264 of 462
![Citroen C4 2005 2.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 258
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit: Citroen C4 2005 2.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 258
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit:](/manual-img/9/4138/w960_4138-263.png)
Downloaded from www.Manualslib.com manuals search engine 258
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting (continued).
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The upper timing cover (12).
- The lower timing cover (11).
- The accessories drive pulley (9).
- The screw (10).
Tightening torque
- Screw (10)Pre-tighten to: 3 ± 0,3 m.daN.
Angular tighten: 180° ± 5°.
Remove tool [1].
Refit:
- The engine support (8), tighten to 5,5 ± 0,4 m.daN.
- The engine support (4), tighten to 6,1 ± 0,6 m.daN.
- The engine support (5), tighten to 2,5 ± 0,2 m.daN.
- The electrical harness (7).
- The power steering fluid reservoir (6).
XSARA PICASSO
Disengage the jack from under the engine.
Couple:
- The tube (2).
- The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
- The fuel unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
- The accessories drive belt
(see corresponding operation).
- The front RH splash-shield (see corresponding operation).
- The front RH wheel, tighten to 9 ± 1 m.daN.
Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 258
Page 266 of 462

Downloaded from www.Manualslib.com manuals search engine 260
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: WJY
B1BP2FTC
Setting the timing.
Removing.
Disconnect the battery.
Remove the front RH lower splash-shield, using tool [1].
Remove the accessories drive belt
(see corresponding operation).Uncouple and plug the diesel fuel delivery and return hoses.
Support the engine, using a workshop hoist.
Remove the RH engine support.
Engage 5th gearto permit rotation of the engine.
Remove the upper cover (1).
Remove the intermediate cover (2).
Remove the lower cover (3).
WARNING: Refit the screw (4) equipped with a washer
(5 mm thick).
Rotate the front RH wheel to drive the engine in its normal direction of
rotation.
Bring the camshaft drive and injection pump pinions to their setting
points.
Position the peg [2]
(from underneath the vehicle).
Continue turning the engine until the peg [2]engages in the flywheel.
B1BP30BC
XSARA
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 260