10-90 CAB
Important Operations - Removal
2. Outside Handle Assembly
Disconnect the lock link and remove the 2 fixing bolts.
5. Tail Gate
1) Removing the tailgate assembly may require two people.
2) Remove the tailgate hinge fixing bolts.
Important Operations - Installation
7. Tail Gate Lock Striker
Tighten the lock striker fixing bolts to the specified
torque.
Torque Nm(kgfm/lbft)
15 (1.5 / 11)
6. Tail Gate Hinge
Tighten the hinge fixing bolts to the specified torque.
C: Bolt
Torque Nm(kgfm/lbft)
40 (4.1 / 30)
5. Tail Gate
1) A: Bolts
Torque N
m(kgf
m/lb
in)
13 (1.3 / 113)
2) B: Bolt
Torque N
m(kgf
m/lb
in)
25 (2.5 / 18)
3) Check the tailgate and rear body.
a. Clearance: 5.0 mm (0.20 in.)
b. Height (Step): Flush
c. Height (Step): Flush
3. Tail Gate Lock Assembly
Tighten the lock assembly fixing bolts to the specified
torque.
Torque N
m(kgf
m/lb
ft)
15 (1.5 / 11)
2. Outside Handle Assembly
Tighten the outside handle assembly fixing bolts to the
specified torque and if remove the key cylinder (i
f
equipped) tighten it to the specified torque.
Torque N
m(kgf
m/lb
in)
9 (0.9 / 78)