2004 DAEWOO NUBIRA battery

[x] Cancel search: battery

Page 2300 of 2643

DAEWOO NUBIRA 2004  Service Repair Manual SECTION : 9E
INSTRUMENTATION/DRIVER INFORMATION
CAUTION : Disconnect the negative battery cable before removing or installing any electrical unit or when a tool
or equipment could easily come in conta

Page 2301 of 2643

DAEWOO NUBIRA 2004  Service Repair Manual 9E – 2IINSTRUMENTATION/DRIVER INFORMATION
DAEWOO V–121 BL4
SPECIFICATIONS
FASTENER TIGHTENING SPECIFICATIONS
ApplicationNSmLb–FtLb–In
Air Deflector Screws2–18
Chime Module Screws4–35
Clock

Page 2305 of 2643

DAEWOO NUBIRA 2004  Service Repair Manual 9E – 6IINSTRUMENTATION/DRIVER INFORMATION
DAEWOO V–121 BL4
DIAGNOSIS
CIGAR LIGHTER
Cigar Lighter Inoperative
StepActionValue(s)YesNo
1Check fuse F19.
Is the fuse blown?–Go to Step 2Go to Step 3

Page 2306 of 2643

DAEWOO NUBIRA 2004  Service Repair Manual INSTRUMENTATION/DRIVER INFORMATION  9E – 7
DAEWOO V–121 BL4
DIGITAL CLOCK
Digital Clock Inoperative
StepActionValue(s)YesNo
1Check fuses F17, Ef28 and F22.
Is either fuse F17, Ef28 and F22 blown?

Page 2308 of 2643

DAEWOO NUBIRA 2004  Service Repair Manual INSTRUMENTATION/DRIVER INFORMATION  9E – 9
DAEWOO V–121 BL4
INSTRUMENT PANEL ILLUMINATION
Instrument Panel Illumination Lamps Inoperative
StepActionValue(s)YesNo
1Check fuse Ef28.
Is fuse Ef28 blo

Page 2311 of 2643

DAEWOO NUBIRA 2004  Service Repair Manual 9E – 12IINSTRUMENTATION/DRIVER INFORMATION
DAEWOO V–121 BL4
INSTRUMENT CLUSTER INDICATOR LAMPS
Instrument Panel Indicator Lamps Do Not Operate
StepActionValue(s)YesNo
1Check fuse F4.
Is fuse F4 bl

Page 2320 of 2643

DAEWOO NUBIRA 2004  Service Repair Manual INSTRUMENTATION/DRIVER INFORMATION  9E – 21
DAEWOO V–121 BL4
Installation  Procedure
1.  Install the glove box with the screws.
NOTCHBACK DEPOSIT BOX
Removal Procedure
1.  Remove the glove box.
2.

Page 2321 of 2643

DAEWOO NUBIRA 2004  Service Repair Manual 9E – 22IINSTRUMENTATION/DRIVER INFORMATION
DAEWOO V–121 BL4
Installation  Procedure
1.  Install the digital clock with the screws.
2.  Connect the electrical connector.
3.  Install the center mold