FILL/CHECK LOCATIONS - DESCRIPTION,
FLUID...............................0-7
FILLER CAP - DESCRIPTION, FUEL.......25-12
FILLER CAP - OPERATION, FUEL........25-12
FILLER NECK SEAL - DIAGNOSIS AND
TESTING, RADIATOR CAP TO............7-27
FILLER TUBE - INSTALLATION, FUEL
TANK ..............................14-13
FILLER TUBE - REMOVAL, FUEL TANK....14-12
FILLING - STANDARD PROCEDURE,
COOLING SYSTEM.....................7-5
FILLING - STANDARD PROCEDURE,
REAR HEATER CORE.................24-101
FILTER - DESCRIPTION, AIR............24-43
FILTER - DESCRIPTION, OIL.............9-53
FILTER - INSTALLATION, AIR...........24-44
FILTER - INSTALLATION, INLET..........14-13
FILTER - INSTALLATION, OIL.......9-139,9-53
FILTER - REMOVAL, AIR...............24-43
FILTER - REMOVAL, INLET.............14-13
FILTER - REMOVAL, OIL...........9-139,9-53
FILTER ADAPTER - INSTALLATION, OIL . . . 9-139
FILTER ADAPTER - REMOVAL, OIL.......9-139
FILTER CHANGE - STANDARD
PROCEDURE, ENGINE OIL..........9-137,9-53
FILTER SERVICE - STANDARD
PROCEDURE, FLUID..........21-203,21s-104
FINAL DRIVE - ASSEMBLY......21-195,21s-99
FINAL DRIVE - DESCRIPTION............21s-95
FINAL DRIVE - DISASSEMBLY....21-190,21s-96
FINAL DRIVE - OPERATION............21s-96
FINESSE SANDING/BUFFING &
POLISHING - DESCRIPTION............23-85
FINISH - DESCRIPTION, BASE
COAT/CLEARCOAT....................23-85
FIRING ORDER, SPECIFICATIONS.........8I-3
FIRST ROW - BENCH - INSTALLATION,
SEAT BELT BUCKLE..................8O-13
FIRST ROW - BENCH - REMOVAL, SEAT
BELT BUCKLE.......................8O-13
FIRST ROW - OUTBOARD -
INSTALLATION, SEAT BELT &
RETRACTOR........................8O-14
FIRST ROW - OUTBOARD - REMOVAL,
SEAT BELT & RETRACTOR.............8O-14
FIRST ROW INBOARD - QUAD BUCKET -
INSTALLATION, SEAT BELT BUCKLE......8O-12
FIRST ROW INBOARD - QUAD BUCKET -
REMOVAL, SEAT BELT BUCKLE.........8O-12
FITTING - CONNECTING ROD............9-45
FITTING - PISTON RING................9-45
FITTING - STANDARD PROCEDURE,
MAIN BEARING......................9-123
FITTING - STANDARD PROCEDURE,
PISTON RING.......................9-121
FITTING - STANDARD PROCEDURE,
PISTON TO CYLINDER BORE............9-42
FITTING CONNECTING RODS -
STANDARD PROCEDURE...............9-116
FITTING PISTONS - STANDARD
PROCEDURE........................9-117
FITTINGS - STANDARD PROCEDURE,
HANDLING TUBING...................24-70
FITTINGS - STANDARD PROCEDURE,
QUICK-CONNECT.....................14-14
FLANGE SEAL - INSTALLATION, INPUT....3-45
FLANGE SEAL - INSTALLATION, OUTPUT . . . 3-46
FLANGE SEAL - REMOVAL, INPUT
........3-44
FLANGE SEAL - REMOVAL, OUTPUT
.......3-45
FLANGE SHIM SELECTION,
ADJUSTMENTS - OUTPUT
...............21-7
FLAP AND SPRING ASSEMBLY -
INSTALLATION, QUAD BUCKET SEAT
SIDE SHIELD/CUPHOLDER
............23-107
FLAP AND SPRING ASSEMBLY -
REMOVAL, QUAD BUCKET SEAT SIDE
SHIELD/CUPHOLDER
.................23-107
FLEX DRIVE - DESCRIPTION
...........8N-36
FLEX DRIVE - INSTALLATION
...........8N-37
FLEX DRIVE - OPERATION
.............8N-36
FLEX DRIVE - REMOVAL
...............8N-37
FLEX PLATE - INSTALLATION
...........9-131
FLEX PLATE - REMOVAL
...............9-131
FLEXIBLE FUEL ENGINE OIL -
DESCRIPTION
.........................0-3
FLOOR CONSOLE TRAY - BRACKET
ASSEMBLY - INSTALLATION
............23-83FLOOR CONSOLE TRAY - BRACKET
ASSEMBLY - REMOVAL................23-83
FLOOR CONSOLE TRAY - INSTALLATION . . 23-83
FLOOR CONSOLE TRAY - REMOVAL......23-83
FLOOR DISTRIBUTION DUCTS -
INSTALLATION.......................24-50
FLOOR DISTRIBUTION DUCTS -
REMOVAL..........................24-50
FLOOR HEAT DUCT - INSTALLATION,
REAR..............................24-63
FLOOR HEAT DUCT - REMOVAL, REAR . . . 24-62
FLOOR MATS - INSTALLATION, CARPETS . 23-76
FLOOR MATS - REMOVAL, CARPETS.....23-75
FLOW AND PRESSURE TEST -
DIAGNOSIS AND TESTING, POWER
STEERING SYSTEM....................19-1
FLOW CHECK - DIAGNOSIS AND
TESTING, COOLING SYSTEM.............7-3
FLUID - DESCRIPTION, AUTOMATIC/
MANUAL TRANSAXLE...................0-4
FLUID - DESCRIPTION, AWD POWER
TRANSFER UNIT.......................0-6
FLUID AND FILTER SERVICE -
STANDARD PROCEDURE.......21-203,21s-104
FLUID CAPACITIES - SPECIFICATIONS......0-6
FLUID CHANGE - STANDARD
PROCEDURE, DIFFERENTIAL
ASSEMBLY..........................3-40
FLUID CHANGE - STANDARD
PROCEDURE, OVERRUNNING CLUTCH
HOUSING............................3-41
FLUID CHANGE - STANDARD
PROCEDURE, PTU......................21-5
FLUID CONTAMINATION - DIAGNOSIS
AND TESTING, BRAKE.............5-32,5s-31
FLUID COOLER - DESCRIPTION.........19-44
FLUID COOLER - INSTALLATION.........19-45
FLUID COOLER - OPERATION...........19-44
FLUID COOLER - REMOVAL............19-44
FLUID DRAIN AND FILL - STANDARD
PROCEDURE........................21-71
FLUID FILL/CHECK LOCATIONS -
DESCRIPTION.........................0-7
FLUID LEAK DIAGNOSIS, DIAGNOSIS
AND TESTING........................21-3
FLUID LEAKAGE - DIAGNOSIS AND
TESTING, TORQUE CONVERTER
HOUSING....................21-123,21s-31
FLUID LEVEL AND CONDITION CHECK,
STANDARD PROCEDURE.......21-201,21s-102
FLUID LEVEL CHECK - STANDARD
PROCEDURE........................21-71
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, BRAKE..............5-32,5s-31
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, POWER STEERING........19-44
FLUID LEVEL INSPECTION - STANDARD
PROCEDURE.........................21-4
FLUID LEVEL SWITCH - DESCRIPTION,
BRAKE..........................5-10,5s-9
FLUID LEVEL SWITCH - INSTALLATION,
BRAKE.........................5-11,5s-10
FLUID LEVEL SWITCH - INSTALLATION,
WASHER...........................8R-12
FLUID LEVEL SWITCH - OPERATION,
BRAKE..........................5-10,5s-9
FLUID LEVEL SWITCH - REMOVAL,
BRAKE
.........................5-11,5s-10
FLUID LEVEL SWITCH - REMOVAL,
WASHER
...........................8R-12
FLUID, SPECIFICATIONS - BRAKE
....5-33,5s-32
FLUIDS - DESCRIPTION, AWD REAR
DRIVELINE MODULE
....................0-6
FLUSH MEASUREMENTS -
SPECIFICATIONS, GAP
................23-124
FLYWHEEL - INSTALLATION
.............6-12
FLYWHEEL - REMOVAL
.................6-12
FOG LAMP - DIAGNOSIS AND TESTING,
FRONT
..............................8L-7
FOG LAMP - INSTALLATION, FRONT
.......8L-8
FOG LAMP - REMOVAL, FRONT
..........8L-8
FOG LAMP UNIT ALIGNMENT - EXPORT
- STANDARD PROCEDURE, FRONT
........8L-9
FOG LAMP UNIT ALIGNMENT -
STANDARD PROCEDURE, FRONT
.........8L-9
FOLDAWAY MIRROR SWITCH - EXPORT
- DESCRIPTION, POWER
..............8N-48FOLDAWAY MIRROR SWITCH - EXPORT
- INSTALLATION, POWER..............8N-49
FOLDAWAY MIRROR SWITCH - EXPORT
- OPERATION, POWER................8N-48
FOLDAWAY MIRROR SWITCH - EXPORT
- REMOVAL, POWER..................8N-48
FORK AND SHAFT - DESCRIPTION,
SHIFT.............................21-113
FORM-IN-PLACE GASKETS AND
SEALERS - STANDARD PROCEDURE . . 9-11,9-84
FRAME DIMENSIONS, SPECIFICATIONS....13-4
FRONT - DESCRIPTION, HALF SHAFT.......3-1
FRONT - INSTALLATION, CRANKSHAFT
OIL SEAL.......................9-127,9-40
FRONT - INSTALLATION, HALF SHAFT......3-4
FRONT - INSTALLATION, SEAT BELT &
RETRACTOR - OUTBOARD.............8O-14
FRONT - INSTALLATION, SPRING
MOUNTS............................2-44
FRONT - INSTALLATION, WHEEL
MOUNTING STUDS...................22-21
FRONT - REMOVAL, CRANKSHAFT OIL
SEAL..........................9-127,9-40
FRONT - REMOVAL, HALF SHAFT..........3-2
FRONT - REMOVAL, SEAT BELT &
RETRACTOR - OUTBOARD.............8O-14
FRONT - REMOVAL, SPRING MOUNTS.....2-43
FRONT - REMOVAL, WHEEL MOUNTING
STUDS.............................22-20
FRONT - SPECIFICATIONS, HALF SHAFT . . . 3-15,
3-6
FRONT BRAKE ROTOR - INSTALLATION.....5-54,
5s-57
FRONT BRAKE ROTOR - REMOVAL . . . 5-54,5s-57
FRONT BUMPER REINFORCEMENT -
INSTALLATION........................13-2
FRONT BUMPER REINFORCEMENT -
REMOVAL...........................13-2
FRONT BUSHING - INSTALLATION, LEAF
SPRING.............................2-30
FRONT BUSHING - REMOVAL, LEAF
SPRING.............................2-29
FRONT CABLE - INSTALLATION.....5-64,5s-67
FRONT CABLE - INSTALLATION,
PARKING BRAKE LEVER...........5-66,5s-69
FRONT CABLE - REMOVAL.........5-64,5s-67
FRONT CABLE - REMOVAL, PARKING
BRAKE LEVER...................5-65,5s-68
FRONT CONTROL MODULE -
DESCRIPTION........................8E-7
FRONT CONTROL MODULE - DIAGNOSIS
AND TESTING........................8E-7
FRONT CONTROL MODULE -
INSTALLATION........................8E-8
FRONT CONTROL MODULE - OPERATION . . 8E-7
FRONT CONTROL MODULE - REMOVAL....8E-8
FRONT CRADLE CROSSMEMBER -
DESCRIPTION........................13-9
FRONT CRADLE CROSSMEMBER
THREAD REPAIR - DESCRIPTION
.........13-9
FRONT CROSSMEMBER MOUNT
BUSHINGS - INSTALLATION
............13-12
FRONT CROSSMEMBER MOUNT
BUSHINGS - REMOVAL
................13-12
FRONT DISC BRAKE CALIPER ADAPTER
- INSTALLATION
.................5-31,5s-30
FRONT DISC BRAKE CALIPER ADAPTER
- REMOVAL
.....................5-31,5s-30
FRONT DISC BRAKE CALIPER
(CONTINENTAL TEVES BRAKES) -
INSTALLATION
.......................5s-26
FRONT DISC BRAKE CALIPER
(CONTINENTAL TEVES BRAKES) -
REMOVAL
..........................5s-23
FRONT DISC BRAKE CALIPER
(DISC/DISC BRAKES) - INSTALLATION
.....5-27
FRONT DISC BRAKE CALIPER
(DISC/DISC BRAKES) - REMOVAL
.........5-24
FRONT DISC BRAKE CALIPER
(DISC/DRUM BRAKES) -
INSTALLATION
........................5-27
FRONT DISC BRAKE CALIPER
(DISC/DRUM BRAKES) - REMOVAL
.......5-24
FRONT DISC BRAKE CALIPER (TRW
BRAKES) - INSTALLATION
..............5s-26
FRONT DISC BRAKE CALIPER (TRW
BRAKES) - REMOVAL
.................5s-23
14 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
FRONT DISC BRAKE SHOES
(CONTINENTAL TEVES BRAKES) -
INSTALLATION.......................5s-15
FRONT DISC BRAKE SHOES
(CONTINENTAL TEVES BRAKES) -
REMOVAL..........................5s-14
FRONT DISC BRAKE SHOES (DISC/DISC
BRAKES) - INSTALLATION...............5-16
FRONT DISC BRAKE SHOES (DISC/DISC
BRAKES) - REMOVAL..................5-14
FRONT DISC BRAKE SHOES (DISC/
DRUM BRAKES) - INSTALLATION.........5-17
FRONT DISC BRAKE SHOES (DISC/
DRUM BRAKES) - REMOVAL............5-15
FRONT DISC BRAKE SHOES (TRW
BRAKES) - INSTALLATION..............5s-16
FRONT DISC BRAKE SHOES (TRW
BRAKES) - REMOVAL.................5s-14
FRONT DOOR GLASS RUN
WEATHERSTRIP - INSTALLATION.......23-113
FRONT DOOR GLASS RUN
WEATHERSTRIP - REMOVAL...........23-113
FRONT DOOR INNER BELT MOLDING -
INSTALLATION......................23-115
FRONT DOOR INNER BELT MOLDING -
REMOVAL.........................23-115
FRONT DOOR OUTER BELT MOLDING -
INSTALLATION......................23-113
FRONT DOOR OUTER BELT MOLDING -
REMOVAL.........................23-113
FRONT DOOR WEATHERSTRIP -
INSTALLATION......................23-114
FRONT DOOR WEATHERSTRIP -
REMOVAL.........................23-114
FRONT FASCIA - INSTALLATION..........13-1
FRONT FASCIA - REMOVAL..............13-1
FRONT FENDER - INSTALLATION........23-52
FRONT FENDER - REMOVAL............23-52
FRONT FOG LAMP - DIAGNOSIS AND
TESTING............................8L-7
FRONT FOG LAMP - INSTALLATION.......8L-8
FRONT FOG LAMP - REMOVAL...........8L-8
FRONT FOG LAMP UNIT ALIGNMENT -
EXPORT - STANDARD PROCEDURE.......8L-9
FRONT FOG LAMP UNIT ALIGNMENT -
STANDARD PROCEDURE................8L-9
FRONT INBOARD - INSTALLATION, SEAT
BELT BUCKLE.......................8O-12
FRONT INBOARD - REMOVAL, SEAT
BELT BUCKLE.......................8O-12
FRONT MOUNT - INSTALLATION....9-131,9-49
FRONT MOUNT - REMOVAL........9-131,9-49
FRONT SEAT - INSTALLATION...........23-91
FRONT SEAT - REMOVAL..............23-91
FRONT SEAT BACK - INSTALLATION......23-92
FRONT SEAT BACK - REMOVAL.........23-92
FRONT SEAT CUSHION SIDE COVER -
INSTALLATION.......................23-94
FRONT SEAT CUSHION SIDE COVER -
REMOVAL..........................23-94
FRONT SEAT RISER - MANUAL TRACK -
INSTALLATION.......................23-95
FRONT SEAT RISER - MANUAL TRACK -
REMOVAL..........................23-94
FRONT SEAT TRACK - REAR COVER -
INSTALLATION.......................23-96
FRONT SEAT TRACK - REAR COVER -
REMOVAL..........................23-96
FRONT SEAT TRACK MANUAL
ADJUSTER - INSTALLATION............23-95
FRONT SEAT TRACK MANUAL
ADJUSTER - REMOVAL................23-95
FRONT SEAT TRACK POWER ADJUSTER
- INSTALLATION.....................23-95
FRONT SEAT TRACK POWER ADJUSTER
- REMOVAL.........................23-95
FRONT SEATBACK ASSIST STRAP -
INSTALLATION.......................23-92
FRONT SEATBACK ASSIST STRAP -
REMOVAL..........................23-92
FRONT SEATBACK COVER -
INSTALLATION.......................23-93
FRONT SEATBACK COVER - REMOVAL
....23-93
FRONT SEATBACK PANEL -
INSTALLATION
.......................23-93
FRONT SEATBACK PANEL - REMOVAL
....23-92
FRONT SUSPENSION - DESCRIPTION
......2-2
FRONT SUSPENSION - OPERATION
........2-2FRONT SUSPENSION FASTENER
TORQUE, SPECIFICATIONS...............2-3
FRONT SUSPENSION, SPECIAL TOOLS.....2-3
FRONT WASHER PUMP MOTOR -
INSTALLATION.......................8R-8
FRONT WASHER PUMP MOTOR -
REMOVAL...........................8R-8
FRONT WHEEL SPEED SENSOR -
INSTALLATION........................5-80
FRONT WHEEL SPEED SENSOR -
REMOVAL...........................5-79
FRONT WHEELHOUSE SPLASH SHIELD -
INSTALLATION.......................23-55
FRONT WHEELHOUSE SPLASH SHIELD -
REMOVAL..........................23-55
FRONT WIPER ARM ALIGNMENT -
STANDARD PROCEDURE...............8R-8
FRONT WIPER ARMS - INSTALLATION....8R-9
FRONT WIPER ARMS - REMOVAL........8R-9
FRONT WIPER MOTOR - INSTALLATION . . . 8R-9
FRONT WIPER MOTOR - REMOVAL.......8R-9
FRONT WIPER SYSTEM - DIAGNOSIS
AND TESTING........................8R-2
FRONT WIPER/WASHER SWITCH -
DIAGNOSIS AND TESTING..............8R-2
FRONT/QUAD SEAT CUSHION -
INSTALLATION.......................23-93
FRONT/QUAD SEAT CUSHION -
REMOVAL..........................23-93
FRONT-WHEEL-DRIVE - INSTALLATION....2-36
FRONT-WHEEL-DRIVE - REMOVAL........2-36
FUEL CORRECTION OR ADAPTIVE
MEMORIES, OPERATION...............14-20
FUEL DELIVERY - DESCRIPTION..........14-2
FUEL DELIVERY - OPERATION...........14-2
FUEL DELIVERY SYSTEM - DIAGNOSIS
AND TESTING........................14-2
FUEL DOSING PUMP - DESCRIPTION....24-115
FUEL DOSING PUMP - INSTALLATION . . . 24-116
FUEL DOSING PUMP - OPERATION.....24-115
FUEL DOSING PUMP - REMOVAL.......24-115
FUEL ENGINE OIL - DESCRIPTION,
FLEXIBLE.............................0-3
FUEL FILL DOOR - INSTALLATION.......23-52
FUEL FILL DOOR - REMOVAL...........23-52
FUEL FILL DOOR BLOCKER LATCH -
INSTALLATION.......................23-53
FUEL FILL DOOR BLOCKER LATCH -
REMOVAL..........................23-53
FUEL FILL DOOR BLOCKER LATCH
STRIKER - INSTALLATION..............23-53
FUEL FILL DOOR BLOCKER LATCH
STRIKER - REMOVAL.................23-53
FUEL FILL DOOR BLOCKER LOCKOUT
LINK - INSTALLATION.................23-54
FUEL FILL DOOR BLOCKER LOCKOUT
LINK - REMOVAL.....................23-53
FUEL FILLER CAP - DESCRIPTION.......25-12
FUEL FILLER CAP - OPERATION.........25-12
FUEL INJECTOR - DESCRIPTION.........14-26
FUEL INJECTOR - OPERATION..........14-26
FUEL LEVEL SENDING UNIT / SENSOR -
DESCRIPTION........................14-5
FUEL LEVEL SENDING UNIT / SENSOR -
INSTALLATION........................14-5
FUEL LEVEL SENDING UNIT / SENSOR -
OPERATION..........................14-5
FUEL LEVEL SENDING UNIT / SENSOR -
REMOVAL...........................14-5
FUEL LINE - INSTALLATION...........24-118
FUEL LINE - REMOVAL...............24-117
FUEL LINES/HOSES AND CLAMPS -
DESCRIPTION........................14-6
FUEL PRESSURE REGULATOR -
INSTALLATION........................14-7
FUEL PRESSURE REGULATOR -
OPERATION..........................14-7
FUEL PRESSURE REGULATOR -
REMOVAL...........................14-7
FUEL PUMP - DESCRIPTION.............14-8
FUEL PUMP - OPERATION..............14-8
FUEL PUMP MODULE - DESCRIPTION.....14-8
FUEL PUMP MODULE - INSTALLATION....14-9
FUEL PUMP MODULE - OPERATION
.......14-8
FUEL PUMP MODULE - REMOVAL
........14-8
FUEL PUMP RELAY - DESCRIPTION
......14-28
FUEL PUMP RELAY - OPERATION
........14-28
FUEL REQUIREMENTS - DESCRIPTION
......0-4FUEL REQUIREMENTS - DIESEL ENGINE
- DESCRIPTION........................0-6
FUEL, SPECIAL TOOLS............14-23,14-4
FUEL SYSTEM PRESSURE RELEASE
PROCEDURE - STANDARD
PROCEDURE.........................14-2
FUEL SYSTEM PRESSURE,
SPECIFICATIONS......................14-3
FUEL TANK - DESCRIPTION............14-10
FUEL TANK - INSTALLATION............14-12
FUEL TANK - OPERATION..............14-11
FUEL TANK - REMOVAL...............14-11
FUEL TANK - STANDARD PROCEDURE,
DRAINING...........................14-2
FUEL TANK FILLER TUBE -
INSTALLATION.......................14-13
FUEL TANK FILLER TUBE - REMOVAL....14-12
FULL OPEN SWITCH - DESCRIPTION....8N-12,
8N-31
FULL OPEN SWITCH - INSTALLATION....8N-13
FULL OPEN SWITCH - OPERATION . 8N-12,8N-31
FULL OPEN SWITCH - REMOVAL........8N-13
FUNCTIONS - DESCRIPTION, CIRCUIT . . 8W-01-6
FUSE - DESCRIPTION, IOD...........8W-97-3
FUSE - OPERATION, IOD.............8W-97-3
FUSES POWERING SEVERAL LOADS -
STANDARD PROCEDURE, TESTING
FOR A SHORT TO GROUND ON......8W-01-10
FWD - INSTALLATION..................2-45
FWD - INSTALLATION, REAR WHEEL
SPEED SENSOR.......................5-81
FWD - INSTALLATION, SPRING...........2-42
FWD - REMOVAL......................2-45
FWD - REMOVAL, REAR WHEEL SPEED
SENSOR............................5-81
FWD - REMOVAL, SPRING..............2-41
GALLERY PLUGS - STANDARD
PROCEDURE, ENGINE CORE AND OIL . 9-10,9-86
GAP AND FLUSH MEASUREMENTS -
SPECIFICATIONS....................23-124
GAP, SPECIFICATIONS - WHEEL SPEED
SENSOR AIR.........................5-79
GAS - INSTALLATION, MODULAR
CLUTCH ASSY - 2.4L..................6-11
GAS - REMOVAL, MODULAR CLUTCH
ASSY - 2.4L..........................6-11
GASKET - DIAGNOSIS AND TESTING,
CYLINDER HEAD.............9-24,9-99,9s-16
GASKET SURFACE PREPARATION -
STANDARD PROCEDURE, ENGINE....9-11,9-85
GASKETS AND SEALERS - STANDARD
PROCEDURE, FORM-IN-PLACE.......9-11,9-84
GASOLINE ENGINES - DIAGNOSIS AND
TESTING, SYSTEM CHARGE LEVEL
TEST..............................24-67
GEAR - DESCRIPTION.................19-26
GEAR - INSTALLATION, LHD............19-32
GEAR - INSTALLATION, RHD............19-33
GEAR & LINK ROD - DESCRIPTION, LIFT . 8N-16
GEAR & LINK ROD - INSTALLATION,
LIFT...............................8N-16
GEAR & LINK ROD - OPERATION, LIFT . . . 8N-16
GEAR & LINK ROD - REMOVAL, LIFT.....8N-16
GEAR - OPERATION...................19-27
GEAR - REMOVAL, LHD...............19-27
GEAR - REMOVAL, RHD...............19-31
GEAR END PLAY - ADJUSTMENT,
DIFFERENTIAL SIDE..................21-70
GEAR SHIFT CABLE - INSTALLATION....21-205
GEAR SHIFT CABLE - REMOVAL . 21-204,21s-105
GEAR SHIFT LEVER - INSTALLATION.....19-21
GEAR SHIFT LEVER - REMOVAL.........19-21
GEAR, SPECIAL TOOLS - POWER
STEERING..........................19-34
GEARSHIFT BOOT - INSTALLATION......21-73
GEARSHIFT BOOT - REMOVAL..........21-72
GEARSHIFT CABLE - CROSSOVER -
INSTALLATION.......................21-76
GEARSHIFT CABLE - CROSSOVER -
REMOVAL..........................21-73
GEARSHIFT CABLE - SELECTOR -
INSTALLATION
.......................21-84
GEARSHIFT CABLE - SELECTOR -
REMOVAL
..........................21-81
GEARSHIFT CABLE ADJUSTMENT,
ADJUSTMENTS
.....................21-206
GEARSHIFT KNOB - INSTALLATION
......21-87
GEARSHIFT KNOB - REMOVAL
..........21-87
RSINDEX15
Description Group-Page Description Group-Page Description Group-Page
HEATED SEAT SWITCH - INSTALLATION,
DRIVER............................8G-10
HEATED SEAT SWITCH - INSTALLATION,
PASSENGER........................8G-14
HEATED SEAT SWITCH - OPERATION,
DRIVER.............................8G-8
HEATED SEAT SWITCH - OPERATION,
PASSENGER........................8G-12
HEATED SEAT SWITCH - REMOVAL,
DRIVER............................8G-10
HEATED SEAT SWITCH - REMOVAL,
PASSENGER........................8G-14
HEATED SEAT SYSTEM - DESCRIPTION....8G-7
HEATED SEAT SYSTEM - DIAGNOSIS
AND TESTING........................8G-8
HEATED SEAT SYSTEM - OPERATION.....8G-8
HEATER - DESCRIPTION, CABIN........24-112
HEATER - DESCRIPTION, ENGINE BLOCK . . . 7-20
HEATER - DIAGNOSIS AND TESTING,
DIESEL SUPPLEMENTAL CABIN........24-113
HEATER - INSTALLATION, ENGINE
BLOCK..............................7-20
HEATER - OPERATION, ENGINE BLOCK....7-20
HEATER - REMOVAL, ENGINE BLOCK......7-20
HEATER AND AIR CONDITIONER -
DESCRIPTION........................24-1
HEATER AND AIR CONDITIONER -
OPERATION..........................24-4
HEATER CONTROL - DESCRIPTION, A/C . . . 24-20
HEATER CONTROL - INSTALLATION, A/C . . 24-21
HEATER CONTROL - REMOVAL, A/C.......24-21
HEATER CORE - DESCRIPTION....24-101,24-83
HEATER CORE - INSTALLATION . . . 24-103,24-85
HEATER CORE - OPERATION......24-101,24-83
HEATER CORE - REMOVAL.......24-102,24-84
HEATER CORE FILLING - STANDARD
PROCEDURE, REAR..................24-101
HEATER CORE TUBES - INSTALLATION . . . 24-85
HEATER CORE TUBES - REMOVAL.......24-83
HEATER HOSES - INSTALLATION.......24-104
HEATER HOSES - REMOVAL...........24-103
HEATER INLET HOSE - INSTALLATION....24-86
HEATER INLET HOSE - REMOVAL........24-85
HEATER LINES - INSTALLATION, REAR . . 24-111
HEATER PERFORMANCE TEST -
DIAGNOSIS AND TESTING.............24-10
HEATER RETURN HOSE - INSTALLATION . . 24-87
HEATER RETURN HOSE - REMOVAL......24-86
HEATER TESTING - DIAGNOSIS AND
TESTING, ENGINE BLOCK...............7-20
HEATER TUBES - REMOVAL,
UNDERBODY.......................24-109
HEATER UNIT - INSTALLATION.........24-119
HEATER UNIT - REMOVAL.............24-118
HEATER WIRING - INSTALLATION,
SUPPLEMENTAL DIESEL..............24-119
HEATER WIRING - REMOVAL,
SUPPLEMENTAL DIESEL..............24-119
HEAVY DUTY, CARGO - INSTALLATION,
AWD ...............................2-36
HEAVY DUTY, CARGO - REMOVAL, AWD . . . 2-36
HEIGHT ADJUSTER-BORC-PILLAR -
INSTALLATION, SEAT BELT.............8O-13
HEIGHT ADJUSTER-BORC-PILLAR -
REMOVAL, SEAT BELT................8O-13
HEIGHT ADJUSTER KNOB -
INSTALLATION, SEAT BELT.............8O-14
HEIGHT ADJUSTER KNOB - REMOVAL,
SEAT BELT .........................8O-14
HEIGHT MEASUREMENT - STANDARD
PROCEDURE, CURB...................2-55
HIGH AND LOW LIMITS - DESCRIPTION . . . 25-8
HIGH MOUNTED STOP LAMP -
INSTALLATION, CENTER................8L-6
HIGH MOUNTED STOP LAMP -
REMOVAL, CENTER....................8L-6
HIGH MOUNTED STOP LAMP UNIT -
INSTALLATION, CENTER................8L-6
HIGH MOUNTED STOP LAMP UNIT -
REMOVAL, CENTER....................8L-6
HIGH PRESSURE RELIEF VALVE -
DESCRIPTION
.......................24-73
HIGH PRESSURE RELIEF VALVE -
OPERATION
.........................24-73
HIGH SPEED OPERATION - STANDARD
PROCEDURE, TIRE PRESSURE
.....22-17,22s-9
HINGE - INSTALLATION
......23-18,23-40,23-60
HINGE - INSTALLATION, CENTER
........23-24HINGE - INSTALLATION, LOWER........23-28
HINGE - INSTALLATION, UPPER.........23-36
HINGE - REMOVAL.........23-17,23-40,23-60
HINGE - REMOVAL, BENCH SEAT BACK . . 23-102
HINGE - REMOVAL, CENTER............23-24
HINGE - REMOVAL, LOWER............23-28
HINGE - REMOVAL, UPPER.............23-36
HINGE COVERS - QUAD BUCKET, 50/50
SPLIT, BENCH - INSTALLATION, SEAT
BACK.............................23-101
HINGE COVERS - QUAD BUCKET, 50/50
SPLIT, BENCH - REMOVAL, SEAT BACK . . 23-101
HOISTING - STANDARD PROCEDURE......0-27
HOLD OPEN LATCH - INSTALLATION.....23-25
HOLD OPEN LATCH - REMOVAL.........23-25
HOLD OPEN LATCH CABLE -
INSTALLATION.......................23-38
HOLD OPEN LATCH CABLE - REMOVAL . . . 23-38
HOLD OPEN LATCH STRIKER -
INSTALLATION.......................23-26
HOLD OPEN LATCH STRIKER -
REMOVAL..........................23-26
HOLDDOWN - DESCRIPTION, BATTERY . . . 8F-15
HOLDDOWN - INSTALLATION, BATTERY . . . 8F-16
HOLDDOWN - OPERATION, BATTERY.....8F-15
HOLDDOWN - REMOVAL, BATTERY . 8F-15,8F-16
HOLDER - INSTALLATION, CUP.........23-64
HOLDER - REMOVAL, CUP.............23-64
HOLDING CLUTCHES - DESCRIPTION . . . 21-207,
21s-106
HOLDING CLUTCHES - OPERATION.....21-207,
21s-106
HOLE REPAIR - DESCRIPTION,
THREADED........................Intro.-5
HONING - STANDARD PROCEDURE,
CYLINDER BORE.................9-112,9-35
HOOD - INSTALLATION................23-61
HOOD - REMOVAL....................23-60
HOOD AJAR SWITCH - EXPORT -
INSTALLATION.......................8Q-3
HOOD AJAR SWITCH - EXPORT -
REMOVAL...........................8Q-3
HORN - DIAGNOSIS AND TESTING.......8H-3
HORN - INSTALLATION.................8H-5
HORN - REMOVAL....................8H-4
HORN CHIRP PREFERENCE - STANDARD
PROCEDURE....................8N-42,8N-5
HORN SWITCH - DESCRIPTION..........8H-5
HORN SYSTEM - DESCRIPTION..........8H-1
HORN SYSTEM - DIAGNOSIS AND
TESTING............................8H-1
HORN SYSTEM - OPERATION............8H-1
HOSE - INSTALLATION, HEATER INLET....24-86
HOSE - INSTALLATION, HEATER RETURN . 24-87
HOSE - REMOVAL, HEATER INLET.......24-85
HOSE - REMOVAL, HEATER RETURN.....24-86
HOSE CLAMPS - DESCRIPTION...........7-1
HOSE CLAMPS - OPERATION.............7-2
HOSES - DESCRIPTION, BRAKE TUBES....5-14,
5s-13
HOSES - INSPECTION, BRAKE TUBES.....5-14,
5s-13
HOSES - INSTALLATION, HEATER.......24-104
HOSES - INSTALLATION, WASHER.......8R-13
HOSES - OPERATION, BRAKE TUBES . 5-14,5s-13
HOSES - REMOVAL, HEATER..........24-103
HOSES - REMOVAL, WASHER..........8R-13
HOSES AND CLAMP - STANDARD
PROCEDURE.........................14-7
HOUSING - INSTALLATION, AIR
CLEANER........................9-24,9-99
HOUSING - INSTALLATION, HVAC........24-61
HOUSING - INSTALLATION, LOCK
CYLINDER..........................19-19
HOUSING - REMOVAL, AIR CLEANER . . 9-24,9-99
HOUSING - REMOVAL, HVAC...........24-60
HOUSING - REMOVAL, LOCK CYLINDER . . 19-17
HOUSING FLUID CHANGE - STANDARD
PROCEDURE, OVERRUNNING CLUTCH.....3-41
HOUSING FLUID LEAKAGE - DIAGNOSIS
AND TESTING, TORQUE CONVERTER . . . 21-123,
21s-31
HOW TO USE WIRING DIAGRAMS -
DESCRIPTION
.....................8W-01-1
HUB / BEARING - DESCRIPTION
.......2-30,2-4
HUB / BEARING - INSTALLATION
......2-33,2-6
HUB / BEARING - OPERATION
........2-30,2-4
HUB / BEARING - REMOVAL
..........2-31,2-5HUB AND BEARING - DIAGNOSIS AND
TESTING.........................2-31,2-5
HVAC - LWB - INSTALLATION, SEAT
BELT & RETRACTOR - SECOND ROW -
RIGHT OUTBOARD WITH REAR.........8O-16
HVAC - LWB - REMOVAL, SEAT BELT &
RETRACTOR - SECOND ROW - RIGHT
OUTBOARD WITH REAR...............8O-16
HVAC HOUSING - INSTALLATION........24-61
HVAC HOUSING - REMOVAL............24-60
HVAC LOUVER - INSTALLATION, REAR . . . 23-81
HVAC LOUVER - REMOVAL, REAR.......23-81
HYDRAULIC CIRCUITS AND VALVES -
OPERATION..........................5-83
HYDRAULIC LASH ADJUSTER NOISE
DIAGNOSIS - DIAGNOSIS AND
TESTING............................9-34
HYDRAULIC LASH ADJUSTERS -
INSTALLATION........................9-34
HYDRAULIC LASH ADJUSTERS -
REMOVAL...........................9-34
HYDRAULIC LIFTERS - DIAGNOSIS AND
TESTING...........................9-113
HYDRAULIC LIFTERS (CAM IN BLOCK) -
DESCRIPTION.......................9-113
HYDRAULIC LIFTERS (CAM IN BLOCK) -
INSTALLATION.......................9-114
HYDRAULIC LIFTERS (CAM IN BLOCK) -
REMOVAL..........................9-114
HYDRAULIC PRESSURE TESTS -
DIAGNOSIS AND TESTING.......21-120,21s-28
HYDRAULIC SCHEMATICS, SCHEMATICS
AND DIAGRAMS - 41TE TRANSAXLE....21-169
HYDRAULIC SCHEMATICS, SCHEMATICS
AND DIAGRAMS - 4XTE TRANSAXLE....21s-75
HYDROSTATIC LOCKED ENGINE -
STANDARD PROCEDURE............9-10,9-85
ICU - ASSEMBLY......................5-94
ICU - DISASSEMBLY...................5-93
ICU (INTEGRATED CONTROL UNIT) -
DESCRIPTION........................5-89
ICU (INTEGRATED CONTROL UNIT) -
OPERATION..........................5-90
IDENTIFICATION - DESCRIPTION,
FASTENER.........................Intro.-2
IDENTIFICATION - DESCRIPTION,
VEHICLE............................23-1
IDENTIFICATION AND INFORMATION -
DESCRIPTION, SECTION.............8W-01-6
IDENTIFICATION, DIAGNOSIS AND
TESTING - SEAL......................21-3
IDENTIFICATION NUMBER -
DESCRIPTION, VEHICLE..............Intro.-9
IDLE AIR CONTROL MOTOR -
DESCRIPTION.......................14-28
IDLE AIR CONTROL MOTOR -
INSTALLATION.......................14-29
IDLE AIR CONTROL MOTOR -
OPERATION.........................14-28
IDLE AIR CONTROL MOTOR - REMOVAL . . 14-29
IGNITION COIL - DESCRIPTION...........8I-6
IGNITION COIL - OPERATION.............8I-7
IGNITION INTERLOCK - DESCRIPTION....19-17
IGNITION SENSE - PCM INPUT -
OPERATION.........................8E-15
IGNITION SWITCH - INSTALLATION......19-16
IGNITION SWITCH - REMOVAL..........19-14
IGNITION SYSTEM - DESCRIPTION........8I-1
IGNITION SYSTEM - OPERATION..........8I-1
IGNITION-OFF DRAW TEST - STANDARD
PROCEDURE........................8F-13
IIITSTATE DISPLAY TEST MODE,
OPERATION - DRB....................25-9
ILLUMINATION LAMPS - INSTALLATION,
CLUSTER...........................8L-21
ILLUMINATION LAMPS - REMOVAL,
CLUSTER...........................8L-21
IMMOBILIZER MODULE - DESCRIPTION,
SENTRY KEY
........................8E-18
IMMOBILIZER MODULE - INSTALLATION,
SENTRY KEY
........................8E-19
IMMOBILIZER MODULE - OPERATION,
SENTRY KEY
........................8E-18
IMMOBILIZER MODULE - REMOVAL,
SENTRY KEY
........................8E-18
INBOARD - 50/50 BENCH -
INSTALLATION, SEAT BELT BUCKLE -
SECOND ROW
.......................8O-13
RSINDEX17
Description Group-Page Description Group-Page Description Group-Page
KEY REMOTE ENTRY MODULE -
INSTALLATION, SENTRY................8Q-6
KEY REMOTE ENTRY MODULE -
OPERATION, SENTRY..................8Q-4
KEY REMOTE ENTRY MODULE -
REMOVAL, SENTRY...................8Q-5
KEY REMOTE ENTRY SYSTEM -
DIAGNOSIS AND TESTING, SENTRY.......8Q-3
KEYLESS ENTRY MODULE -
DESCRIPTION, REMOTE...............8N-43
KEYLESS ENTRY MODULE - DIAGNOSIS
AND TESTING, REMOTE...............8N-43
KEYLESS ENTRY MODULE -
INSTALLATION, REMOTE..............8N-44
KEYLESS ENTRY MODULE - OPERATION,
REMOTE...........................8N-43
KEYLESS ENTRY MODULE - REMOVAL,
REMOTE...........................8N-44
KEYLESS ENTRY TRANSMITTER -
DIAGNOSIS AND TESTING.........8N-42,8N-5
KEYLESS ENTRY TRANSMITTER
PROGRAMMING - STANDARD
PROCEDURE, REMOTE.................8N-5
KEY/LOCK CYLINDER - DESCRIPTION....19-20
KEY/LOCK CYLINDER - INSTALLATION....19-20
KEY/LOCK CYLINDER - OPERATION......19-20
KEY/LOCK CYLINDER - REMOVAL.......19-20
KNOB - INSTALLATION, GEARSHIFT......21-87
KNOB - INSTALLATION, SEAT BELT
HEIGHT ADJUSTER...................8O-14
KNOB - REMOVAL, GEARSHIFT..........21-87
KNOB - REMOVAL, SEAT BELT HEIGHT
ADJUSTER.........................8O-14
KNOCK SENSOR - DESCRIPTION..........8I-8
KNOCK SENSOR - OPERATION...........8I-8
KNUCKLE - DESCRIPTION................2-6
KNUCKLE - INSPECTION, STEERING........2-9
KNUCKLE - INSTALLATION, STEERING......2-9
KNUCKLE - OPERATION.................2-7
KNUCKLE - REMOVAL, STEERING.........2-7
LABEL - DESCRIPTION, E-MARK......Intro.-11
LABEL - DESCRIPTION, VECI.........Intro.-11
LABEL - DESCRIPTION, VEHICLE
CERTIFICATION....................Intro.-11
LABEL - DESCRIPTION, VEHICLE
EMISSION CONTROL INFORMATION.......25-1
LAMP - DESCRIPTION, VTSS/SKIS
INDICATOR..........................8Q-7
LAMP - DIAGNOSIS AND TESTING,
FRONT FOG..........................8L-7
LAMP - INSTALLATION, CENTER
CONSOLE...........................8L-21
LAMP - INSTALLATION, CENTER HIGH
MOUNTED STOP......................8L-6
LAMP - INSTALLATION, COURTESY......8L-21
LAMP - INSTALLATION, DOME/CARGO....8L-22
LAMP - INSTALLATION, FRONT FOG.......8L-8
LAMP - INSTALLATION, LICENSE........8L-17
LAMP - INSTALLATION, LIFTGATE.......8L-22
LAMP - INSTALLATION, PARK/TURN
SIGNAL............................8L-18
LAMP - INSTALLATION, READING........8L-23
LAMP - INSTALLATION, TAIL...........8L-19
LAMP - INSTALLATION, VANITY.........8L-24
LAMP - OPERATION, VTSS/SKIS
INDICATOR..........................8Q-8
LAMP - REMOVAL, CENTER CONSOLE....8L-21
LAMP - REMOVAL, CENTER HIGH
MOUNTED STOP......................8L-6
LAMP - REMOVAL, COURTESY..........8L-21
LAMP - REMOVAL, DOME/CARGO.......8L-22
LAMP - REMOVAL, FRONT FOG..........8L-8
LAMP - REMOVAL, LICENSE............8L-17
LAMP - REMOVAL, LIFTGATE...........8L-22
LAMP - REMOVAL, PARK/TURN SIGNAL . . 8L-18
LAMP - REMOVAL, READING...........8L-23
LAMP - REMOVAL, TAIL...............8L-18
LAMP - REMOVAL, VANITY.............8L-24
LAMP REPLACEMENT - STANDARD
PROCEDURE, MODULE................8M-3
LAMP REPLACEMENT - STANDARD
PROCEDURE, READING/COURTESY
.......8M-3
LAMP SWITCH - DESCRIPTION, BRAKE
....8L-4
LAMP SWITCH - DIAGNOSIS AND
TESTING, BRAKE
......................8L-4
LAMP SWITCH - INSTALLATION,
BACK-UP
...........................21-62
LAMP SWITCH - INSTALLATION, BRAKE
. . . 8L-5LAMP SWITCH - INSTALLATION, CENTER
CONSOLE...........................8L-21
LAMP SWITCH - INSTALLATION, GLOVE
BOX ...............................8L-22
LAMP SWITCH - OPERATION, BRAKE......8L-4
LAMP SWITCH - REMOVAL, BACK-UP....21-62
LAMP SWITCH - REMOVAL, BRAKE.......8L-5
LAMP SWITCH - REMOVAL, CENTER
CONSOLE...........................8L-21
LAMP SWITCH - REMOVAL, GLOVE BOX . . 8L-22
LAMP UNIT - INSTALLATION, CENTER
HIGH MOUNTED STOP.................8L-6
LAMP UNIT - INSTALLATION, TAIL.......8L-19
LAMP UNIT - REMOVAL, CENTER HIGH
MOUNTED STOP......................8L-6
LAMP UNIT - REMOVAL, TAIL...........8L-19
LAMP UNIT ALIGNMENT - EXPORT -
STANDARD PROCEDURE, FRONT FOG.....8L-9
LAMP UNIT ALIGNMENT - STANDARD
PROCEDURE, FRONT FOG...............8L-9
LAMPS - INSTALLATION, CLUSTER
ILLUMINATION......................8L-21
LAMPS - REMOVAL, CLUSTER
ILLUMINATION......................8L-21
LAMPS, SPECIFICATIONS - EXTERIOR.....8L-3
LAMPS, SPECIFICATIONS - INTERIOR....8L-20
LAMPS/LIGHTING - EXTERIOR -
DESCRIPTION........................8L-2
LAMPS/LIGHTING - EXTERIOR -
OPERATION..........................8L-2
LAMPS/LIGHTING - EXTERIOR -
WARNING...........................8L-3
LASH ADJUSTER NOISE DIAGNOSIS -
DIAGNOSIS AND TESTING, HYDRAULIC....9-34
LASH ADJUSTERS - INSTALLATION,
HYDRAULIC..........................9-34
LASH ADJUSTERS - REMOVAL,
HYDRAULIC..........................9-34
LATCH - DESCRIPTION...........8N-13,8N-29
LATCH - INSTALLATION.....23-18,23-41,23-61
LATCH - INSTALLATION..........8N-14,8N-29
LATCH - INSTALLATION, FUEL FILL
DOOR BLOCKER.....................23-53
LATCH - INSTALLATION, GLOVE BOX.....23-64
LATCH - INSTALLATION, HOLD OPEN.....23-25
LATCH / LOCK ASSEMBLY -
INSTALLATION.......................23-27
LATCH / LOCK ASSEMBLY - REMOVAL....23-26
LATCH - OPERATION............8N-13,8N-29
LATCH - REMOVAL.........23-18,23-41,23-61
LATCH - REMOVAL..............8N-13,8N-29
LATCH - REMOVAL, FUEL FILL DOOR
BLOCKER...........................23-53
LATCH - REMOVAL, GLOVE BOX.........23-64
LATCH - REMOVAL, HOLD OPEN........23-25
LATCH ACTUATOR - DESCRIPTION......8N-14
LATCH ACTUATOR - INSTALLATION......8N-14
LATCH ACTUATOR - OPERATION........8N-14
LATCH ACTUATOR - REMOVAL..........8N-14
LATCH CABLE - INSTALLATION, HOLD
OPEN..............................23-38
LATCH CABLE - REMOVAL, HOLD OPEN . . . 23-38
LATCH HANDLE - INSTALLATION, INSIDE . . 23-34
LATCH HANDLE - REMOVAL, INSIDE.....23-34
LATCH LOCKING LINK - INSTALLATION,
SEAT RISER........................23-106
LATCH LOCKING LINK - REMOVAL, SEAT
RISER
............................23-106
LATCH RELEASE CABLE - INSTALLATION
. . 23-62
LATCH RELEASE CABLE - REMOVAL
.....23-61
LATCH STRIKER - INSTALLATION
. . 23-19,23-41,
23-62
LATCH STRIKER - INSTALLATION, FUEL
FILL DOOR BLOCKER
.................23-53
LATCH STRIKER - INSTALLATION, GLOVE
BOX
...............................23-64
LATCH STRIKER - INSTALLATION, HOLD
OPEN
..............................23-26
LATCH STRIKER - INSTALLATION, REAR
. . 23-29
LATCH STRIKER - REMOVAL
. 23-19,23-41,23-62
LATCH STRIKER - REMOVAL, FUEL FILL
DOOR BLOCKER
.....................23-53
LATCH STRIKER - REMOVAL, GLOVE
BOX
...............................23-64
LATCH STRIKER - REMOVAL, HOLD
OPEN
..............................23-26
LATCH STRIKER - REMOVAL, REAR
......23-29LEAD - DIAGNOSIS AND TESTING,
TIRE/VEHICLE..................22-14,22s-6
LEAF SPRING FRONT BUSHING -
INSTALLATION........................2-30
LEAF SPRING FRONT BUSHING -
REMOVAL...........................2-29
LEAK DETECTION ASSY - INSTALLATION,
NATURAL VAC.......................25-13
LEAK DETECTION ASSY - REMOVAL,
NATURAL VAC.......................25-13
LEAK DETECTION PUMP - INSTALLATION . 25-13
LEAK DETECTION PUMP - REMOVAL.....25-13
LEAK DIAGNOSIS, DIAGNOSIS AND
TESTING - FLUID......................21-3
LEAK INSPECTION - DIAGNOSIS AND
TESTING, ENGINE OIL...............9-8,9-82
LEAK REPAIRING - STANDARD
PROCEDURE, TIRE..............22-17,22s-9
LEAK TEST - DIAGNOSIS AND TESTING,
COOLING SYSTEM.....................7-2
LEAKAGE - DIAGNOSIS AND TESTING,
TORQUE CONVERTER HOUSING FLUID . . 21-123,
21s-31
LEAKAGE TEST - DIAGNOSIS AND
TESTING, CYLINDER COMBUSTION
PRESSURE.......................9-83,9-9
LEAKS - DIAGNOSIS AND TESTING,
INTAKE MANIFOLD...............9-145,9-58
LEAKS - DIAGNOSIS AND TESTING,
REFRIGERANT SYSTEM...............24-66
LEAKS - DIAGNOSIS AND TESTING,
WATER .............................23-1
LEARN CYCLE - STANDARD
PROCEDURE, POWER DOOR.............8N-28
LEARN CYCLE - STANDARD
PROCEDURE, POWER LIFTGATE..........8N-9
LEARN PROCEDURE - STANDARD
PROCEDURE, QUICK.............8E-16,8E-23
LEFT - CLEANING, EXHAUST MANIFOLD . . 9-152
LEFT - INSPECTION, EXHAUST
MANIFOLD..........................9-152
LEFT - INSTALLATION, CYLINDER HEAD
COVER.............................9-103
LEFT - INSTALLATION, EXHAUST
MANIFOLD..........................9-152
LEFT - REMOVAL, CYLINDER HEAD
COVER.............................9-103
LEFT - REMOVAL, EXHAUST MANIFOLD . . . 9-152
LEFT B-PILLAR SWITCH - DESCRIPTION . . 8N-32
LEFT B-PILLAR SWITCH - INSTALLATION . 8N-32
LEFT B-PILLAR SWITCH - OPERATION....8N-32
LEFT B-PILLAR SWITCH - REMOVAL.....8N-32
LEFT D-PILLAR TRIM PANEL -
INSTALLATION.......................23-78
LEFT D-PILLAR TRIM PANEL - REMOVAL . 23-78
LEFT MOUNT - INSTALLATION......9-133,9-50
LEFT MOUNT - REMOVAL..........9-133,9-49
LEFT OUTBOARD - INSTALLATION, SEAT
BELT & RETRACTOR - SECOND ROW....8O-17
LEFT OUTBOARD - REMOVAL, SEAT
BELT & RETRACTOR - SECOND ROW....8O-17
LEFT QUARTER TRIM PANEL -
INSTALLATION.......................23-80
LEFT QUARTER TRIM PANEL - REMOVAL
. 23-80
LENS - INSTALLATION, CLUSTER
........8J-10
LENS - REMOVAL, CLUSTER
............8J-10
LEVEL - STANDARD PROCEDURE,
CHECKING BATTERY ELECTROLYTE
......8F-14
LEVEL - STANDARD PROCEDURE,
REFRIGERANT OIL
...................24-93
LEVEL AND CONDITION CHECK,
STANDARD PROCEDURE - FLUID
......21-201,
21s-102
LEVEL CHECK - STANDARD
PROCEDURE, COOLANT
.................7-5
LEVEL CHECK - STANDARD
PROCEDURE, ENGINE OIL
..............9-137
LEVEL CHECK - STANDARD
PROCEDURE, FLUID
..................21-71
LEVEL CHECK, STANDARD PROCEDURE
- ENGINE OIL
........................9-53
LEVEL CHECKING - STANDARD
PROCEDURE, BRAKE FLUID
........5-32,5s-31
LEVEL CHECKING - STANDARD
PROCEDURE, POWER STEERING FLUID
. . . 19-44
LEVEL INSPECTION - STANDARD
PROCEDURE, FLUID
...................21-4
RSINDEX19
Description Group-Page Description Group-Page Description Group-Page
OUTPUT - OPERATION, SPEED SENSOR . 21-241,
21s-142
OUTPUT - REMOVAL, SPEED SENSOR . . 21-241,
21s-143
OUTPUT - SBEC CONTROLLER -
OPERATION, 8-VOLT SUPPLY - PCM.....8E-15
OUTPUT FLANGE SEAL - INSTALLATION . . . 3-46
OUTPUT FLANGE SEAL - REMOVAL.......3-45
OUTPUT FLANGE SHIM SELECTION,
ADJUSTMENTS.......................21-7
OUTSIDE HANDLE - INSTALLATION......23-35
OUTSIDE HANDLE - REMOVAL..........23-35
OUTSIDE HANDLE CABLE -
INSTALLATION.......................23-37
OUTSIDE HANDLE CABLE - REMOVAL....23-37
OVER STEERING COLUMN COVER -
INSTALLATION.......................23-70
OVER STEERING COLUMN COVER -
REMOVAL..........................23-70
OVERHEAD CONSOLE - DESCRIPTION....8M-1
OVERHEAD CONSOLE - DIAGNOSIS AND
TESTING............................8M-2
OVERHEAD CONSOLE - OPERATION......8M-2
OVERHEAD CONSOLE - REMOVAL........8M-6
OVERHEAD CONSOLE, SPECIAL TOOLS . . . 8M-6
OVERRUNNING CLUTCH - DESCRIPTION,
BI-DIRECTIONAL......................3-34
OVERRUNNING CLUTCH - OPERATION,
BI-DIRECTIONAL......................3-36
OVERRUNNING CLUTCH HOUSING FLUID
CHANGE - STANDARD PROCEDURE........3-41
PAD - INSTALLATION, REAR FASCIA -
SCUFF..............................13-4
PAD - REMOVAL, REAR FASCIA - SCUFF . . . 13-3
PAD ASSEMBLY - INSTALLATION,
INSTRUMENT PANEL TOP..............23-72
PAD ASSEMBLY - REMOVAL,
INSTRUMENT PANEL TOP..............23-71
PAINT CODE - DESCRIPTION...........23-85
PAINTED TOUCH-UP - DESCRIPTION.....23-85
PAN - CLEANING, OIL.................9-140
PAN - INSPECTION, OIL...............9-140
PAN - INSTALLATION, OIL.........9-140,9-54
PAN - REMOVAL, OIL.............9-140,9-54
PANEL - INSTALLATION, BENCH
SEATBACK..........................23-99
PANEL - INSTALLATION, FRONT
SEATBACK..........................23-93
PANEL - INSTALLATION, GLASS........23-120
PANEL - INSTALLATION, LEFT D-PILLAR
TRIM..............................23-78
PANEL - INSTALLATION, LEFT QUARTER
TRIM..............................23-80
PANEL - INSTALLATION, LOWER
INSTRUMENT.......................23-69
PANEL - INSTALLATION, RIGHT
D-PILLAR TRIM......................23-82
PANEL - INSTALLATION, RIGHT
QUARTER TRIM......................23-79
PANEL - INSTALLATION, TRIM.....23-20,23-34,
23-44
PANEL - REMOVAL, BENCH SEATBACK . . . 23-99
PANEL - REMOVAL, FRONT SEATBACK....23-92
PANEL - REMOVAL, GLASS
............23-120
PANEL - REMOVAL, LEFT D-PILLAR
TRIM
..............................23-78
PANEL - REMOVAL, LEFT QUARTER
TRIM
..............................23-80
PANEL - REMOVAL, LOWER
INSTRUMENT
.......................23-69
PANEL - REMOVAL, RIGHT D-PILLAR
TRIM
..............................23-81
PANEL - REMOVAL, RIGHT QUARTER
TRIM
..............................23-79
PANEL - REMOVAL, TRIM
....23-20,23-33,23-43
PANEL ADJUSTMENT, ADJUSTMENTS -
SUNROOF GLASS
...................23-120
PANEL ANTENNA CABLE -
INSTALLATION, INSTRUMENT
............8A-9
PANEL ANTENNA CABLE - REMOVAL,
INSTRUMENT
........................8A-8
PANEL ASSEMBLY - INSTALLATION,
INSTRUMENT
.......................23-66
PANEL ASSEMBLY - REMOVAL,
INSTRUMENT
.......................23-65
PANEL CENTER BEZEL - INSTALLATION,
INSTRUMENT
.......................23-68PANEL CENTER BEZEL - REMOVAL,
INSTRUMENT.......................23-68
PANEL DEMISTER DUCTS -
INSTALLATION, INSTRUMENT...........24-55
PANEL DEMISTER DUCTS - REMOVAL,
INSTRUMENT.......................24-55
PANEL DUCTS - INSTALLATION,
INSTRUMENT.......................24-55
PANEL DUCTS - REMOVAL,
INSTRUMENT.......................24-55
PANEL END CAP - INSTALLATION,
INSTRUMENT.......................23-68
PANEL END CAP - REMOVAL,
INSTRUMENT.......................23-68
PANEL OUTLET - INSTALLATION,
INSTRUMENT.......................24-46
PANEL OUTLET - REMOVAL,
INSTRUMENT.......................24-45
PANEL REPAIR - STANDARD
PROCEDURE, PLASTIC BODY............23-3
PANEL TOP COVER - INSTALLATION,
INSTRUMENT.......................23-69
PANEL TOP COVER - REMOVAL,
INSTRUMENT.......................23-68
PANEL TOP PAD ASSEMBLY -
INSTALLATION, INSTRUMENT...........23-72
PANEL TOP PAD ASSEMBLY - REMOVAL,
INSTRUMENT.......................23-71
PANEL/FENDER AIR EXHAUSTER -
DESCRIPTION, REAR QUARTER.........23-57
PANEL/FENDER AIR EXHAUSTER -
INSTALLATION, REAR QUARTER.........23-58
PANEL/FENDER AIR EXHAUSTER -
REMOVAL, REAR QUARTER..............23-57
PARK SWITCH - DIAGNOSIS AND
TESTING, FAILED.....................8R-2
PARKING BRAKE - INSTALLATION,
LEVER.........................5-65,5s-67
PARKING BRAKE - INSTALLATION,
SHOES.........................5-72,5s-75
PARKING BRAKE - REMOVAL, LEVER . 5-64,5s-67
PARKING BRAKE - REMOVAL, SHOES.....5-67,
5s-69
PARKING BRAKE AUTOMATIC ADJUSTER
TENSION RELEASE - STANDARD
PROCEDURE....................5-58,5s-61
PARKING BRAKE AUTOMATIC ADJUSTER
TENSION RESET - STANDARD
PROCEDURE....................5-59,5s-61
PARKING BRAKE CABLE (FRONT) -
INSTALLATION...................5-63,5s-65
PARKING BRAKE CABLE (FRONT) -
REMOVAL......................5-59,5s-62
PARKING BRAKE CABLE
(INTERMEDIATE) - INSTALLATION . . . 5-63,5s-66
PARKING BRAKE CABLE
(INTERMEDIATE) - REMOVAL.......5-60,5s-62
PARKING BRAKE CABLE (LEFT REAR) -
INSTALLATION...................5-64,5s-66
PARKING BRAKE CABLE (LEFT REAR) -
REMOVAL......................5-62,5s-64
PARKING BRAKE CABLE (RIGHT REAR) -
INSTALLATION...................5-63,5s-66
PARKING BRAKE CABLE (RIGHT REAR) -
REMOVAL......................5-60,5s-63
PARKING BRAKE CABLES -
ADJUSTMENT
...................5-64,5s-66
PARKING BRAKE LEVER AND FRONT
CABLE - INSTALLATION
............5-66,5s-69
PARKING BRAKE LEVER AND FRONT
CABLE - REMOVAL
...............5-65,5s-68
PARKING BRAKE SHOES - ADJUSTMENT
. . 5-73,
5s-76
PARK/TURN SIGNAL LAMP -
INSTALLATION
.......................8L-18
PARK/TURN SIGNAL LAMP - REMOVAL
. . . 8L-18
PASSENGER AIRBAG - DESCRIPTION
.....8O-8
PASSENGER AIRBAG - INSTALLATION
....8O-10
PASSENGER AIRBAG - OPERATION
.......8O-9
PASSENGER AIRBAG - REMOVAL
........8O-9
PASSENGER BENCH - INSTALLATION,
SEAT BELT BUCKLE - SECOND ROW -
THREE
.............................8O-15
PASSENGER BENCH - REMOVAL, SEAT
BELT BUCKLE - SECOND ROW - THREE
. . . 8O-15
PASSENGER HEATED SEAT SWITCH -
DESCRIPTION
.......................8G-12PASSENGER HEATED SEAT SWITCH -
DIAGNOSIS AND TESTING.............8G-13
PASSENGER HEATED SEAT SWITCH -
INSTALLATION......................8G-14
PASSENGER HEATED SEAT SWITCH -
OPERATION.........................8G-12
PASSENGER HEATED SEAT SWITCH -
REMOVAL..........................8G-14
PASSENGER POWER SEAT TRACK -
DESCRIPTION..................8N-16,8N-59
PASSENGER POWER SEAT TRACK -
INSTALLATION.................8N-18,8N-61
PASSENGER POWER SEAT TRACK -
OPERATION...................8N-17,8N-60
PASSENGER POWER SEAT TRACK -
REMOVAL.....................8N-18,8N-61
PASSENGER SEAT SWITCH -
DESCRIPTION..................8N-13,8N-56
PASSENGER SEAT SWITCH - DIAGNOSIS
AND TESTING..................8N-14,8N-57
PASSENGER SEAT SWITCH -
INSTALLATION.................8N-15,8N-57
PASSENGER SEAT SWITCH - OPERATION . 8N-13,
8N-56
PASSENGER SEAT SWITCH - REMOVAL . . 8N-14,
8N-57
PATTERNS - DIAGNOSIS AND TESTING,
TIRE WEAR....................22-16,22s-8
PCM GROUND - OPERATION...........8E-15
PCM INPUT - OPERATION, DATA BUS
COMMUNICATION RECEIVE.............8E-15
PCM INPUT - OPERATION, IGNITION
SENSE.............................8E-15
PCM INPUT - OPERATION, SENSOR
RETURN............................8E-15
PCM OUTPUT - OPERATION, 5 VOLT
SUPPLY............................8E-15
PCM OUTPUT - SBEC CONTROLLER -
OPERATION, 8-VOLT SUPPLY...........8E-15
PCM/SKIM PROGRAMMING - STANDARD
PROCEDURE.........................8E-2
PCV SYSTEM - DIAGNOSIS AND
TESTING...........................25-17
PCV VALVE - DESCRIPTION............25-16
PCV VALVE - OPERATION..............25-16
PEDAL - INSTALLATION, ACCELERATOR . . . 14-24
PEDAL - REMOVAL, ACCELERATOR......14-24
PEDAL INTERLOCK SWITCH -
INSTALLATION, CLUTCH................6-14
PEDAL INTERLOCK SWITCH - REMOVAL,
CLUTCH
.............................6-13
PEDAL TORQUE SHAFT - RHD -
INSTALLATION
...................5-39,5s-43
PEDAL TORQUE SHAFT - RHD -
REMOVAL
......................5-39,5s-42
PEDAL UPSTOP SWITCH -
INSTALLATION, CLUTCH
................6-16
PEDAL UPSTOP SWITCH - REMOVAL,
CLUTCH
.............................6-15
PEDALS - ADJUSTABLE - INSTALLATION
. . 5s-40
PEDALS - ADJUSTABLE - REMOVAL
......5s-38
PEDALS SWITCH - INSTALLATION,
ADJUSTABLE
........................5s-10
PEDALS SWITCH - REMOVAL,
ADJUSTABLE
........................5s-10
PERFORMANCE - DIAGNOSIS AND
TESTING, ENGINE DIAGNOSIS
........9-4,9-78
PERFORMANCE TEST - DIAGNOSIS AND
TESTING, A/C
........................24-7
PERFORMANCE TEST - DIAGNOSIS AND
TESTING, HEATER
....................24-10
PIN BUSHINGS (CONTINENTAL TEVES
BRAKES) - ASSEMBLY, CALIPER GUIDE
. . . 5s-24
PIN BUSHINGS (CONTINENTAL TEVES
BRAKES) - DISASSEMBLY, CALIPER
GUIDE
.............................5s-23
PIN BUSHINGS (DISC/DISC BRAKES) -
ASSEMBLY, CALIPER GUIDE
.............5-25
PIN BUSHINGS (DISC/DISC BRAKES) -
DISASSEMBLY, CALIPER GUIDE
..........5-24
PINCH SENSOR - DESCRIPTION
.........8N-17
PINCH SENSOR - INSTALLATION
........8N-17
PINCH SENSOR - OPERATION
..........8N-17
PINCH SENSOR - REMOVAL
............8N-17
PINION FACTOR SETTING - STANDARD
PROCEDURE
...................8E-15,8E-23
24 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
PINS (DISC/DRUM BRAKES) -
INSTALLATION, DISC BRAKE CALIPER
GUIDE..............................5-31
PINS (DISC/DRUM BRAKES) - REMOVAL,
DISC BRAKE CALIPER GUIDE............5-31
PINS (TRW BRAKES) - INSTALLATION,
DISC BRAKE CALIPER GUIDE...........5s-30
PINS (TRW BRAKES) - REMOVAL, DISC
BRAKE CALIPER GUIDE................5s-30
PIPE - 3.3/3.8L - INSTALLATION,
CROSS-OVER........................11-6
PIPE - 3.3/3.8L - REMOVAL, CROSS-
OVER...............................11-6
PIPE - INSTALLATION, AIR INTAKE......24-114
PIPE - REMOVAL, AIR INTAKE.........24-113
PISTON & CONNECTING ROD -
DESCRIPTION...................9-116,9-42
PISTON & CONNECTING ROD -
INSTALLATION........................9-44
PISTON & CONNECTING ROD -
REMOVAL...........................9-43
PISTON AND SEAL - ASSEMBLY,
CALIPER..............5-26,5-29,5s-25,5s-28
PISTON AND SEAL - DISASSEMBLY,
CALIPER..............5-24,5-28,5s-23,5s-27
PISTON RING, FITTING.................9-45
PISTON RING FITTING - STANDARD
PROCEDURE........................9-121
PISTON RINGS - INSTALLATION.........9-121
PISTON RINGS - REMOVAL............9-121
PISTON TO CYLINDER BORE FITTING -
STANDARD PROCEDURE................9-42
PISTONS - STANDARD PROCEDURE,
FITTING............................9-117
PLANETARY GEARTRAIN -
DESCRIPTION...............21-232,21s-132
PLANETARY GEARTRAIN - OPERATION . . 21-232,
21s-132
PLASTIC BODY PANEL REPAIR -
STANDARD PROCEDURE................23-3
PLASTIC GROCERY BAG RETAINER -
INSTALLATION......................23-105
PLASTIC GROCERY BAG RETAINER -
REMOVAL.........................23-104
PLASTIGAGE - STANDARD PROCEDURE,
MEASURING BEARING CLEARANCE
USING..........................9-12,9-84
PLATE - 2.5L TD - INSTALLATION,
CLUTCH DISC AND PRESSURE...........6-12
PLATE - 2.5L TD - REMOVAL, CLUTCH
DISC AND PRESSURE..................6-11
PLATE - DESCRIPTION, BODY CODE....Intro.-1
PLATE - DESCRIPTION, MANUFACTURER . Intro.-11
PLATE - DRUM BRAKE - INSTALLATION,
SUPPORT.......................5-56,5s-58
PLATE - DRUM BRAKE - REMOVAL,
SUPPORT.......................5-56,5s-58
PLATE - INSTALLATION, DOOR SILL
TRIM..............................23-77
PLATE - INSTALLATION, FLEX...........9-131
PLATE - INSTALLATION, LIFTGATE SILL . . . 23-79
PLATE - INSTALLATION, SLIDING DOOR
SILL...............................23-82
PLATE - INSTALLATION, STEERING
COLUMN COVER BACKING.............23-70
PLATE - REMOVAL, DOOR SILL TRIM....23-77
PLATE - REMOVAL, FLEX..............9-131
PLATE - REMOVAL, LIFTGATE SILL.......23-79
PLATE - REMOVAL, SLIDING DOOR SILL . . 23-82
PLATE - REMOVAL, STEERING COLUMN
COVER BACKING.....................23-70
PLATE BATTERY CHARGING -
STANDARD PROCEDURE, SPIRAL........8F-10
PLATE MISALIGNMENT - DIAGNOSIS
AND TESTING, DRIVE...................6-6
PLATES - ADHESIVE ATTACHED -
INSTALLATION, EXTERIOR NAME........23-51
PLATES - ADHESIVE ATTACHED -
REMOVAL, EXTERIOR NAME............23-51
PLATES - TAPE ATTACHED -
INSTALLATION, EXTERIOR NAME
........23-51
PLATES - TAPE ATTACHED - REMOVAL,
EXTERIOR NAME
.....................23-51
PLATINUM PLUGS - DESCRIPTION
........8I-9
PLAY - ADJUSTMENT, DIFFERENTIAL
SIDE GEAR END
.....................21-70
PLAY - STANDARD PROCEDURE,
CRANKSHAFT END
................9-36,9s-6PLAY - STANDARD PROCEDURE,
MEASURING CAMSHAFT END............9-29
PLAY - STANDARD PROCEDURE,
MEASURING CRANKSHAFT END.........9-125
PLAYER - DESCRIPTION, DVD...........8A-8
PLAYER - INSTALLATION, DVD...........8A-8
PLAYER - OPERATION, DVD.............8A-8
PLAYER - REMOVAL, DVD..............8A-8
PLUG CABLE - DESCRIPTION, SPARK.....8I-10
PLUG CABLE RESISTANCE,
SPECIFICATIONS - SPARK...............8I-2
PLUG, SPECIFICATIONS - SPARK.........8I-2
PLUGS - DESCRIPTION, PLATINUM........8I-9
PLUGS - STANDARD PROCEDURE,
ENGINE CORE AND OIL GALLERY....9-10,9-86
POINTS - DESCRIPTION, LUBRICATION.....0-7
POLISHING - DESCRIPTION, FINESSE
SANDING/BUFFING...................23-85
PORT REPAIR - STANDARD
PROCEDURE, INTAKE MANIFOLD
VACUUM...........................9-145
PORT VALVE CORE - DESCRIPTION,
SERVICE...........................24-94
PORT VALVE CORE - INSTALLATION,
SERVICE...........................24-94
PORT VALVE CORE - REMOVAL,
SERVICE...........................24-94
POSITION SENSOR - DESCRIPTION,
CAMSHAFT...........................8I-4
POSITION SENSOR - DESCRIPTION,
CRANKSHAFT.......................14-25
POSITION SENSOR - DESCRIPTION,
THROTTLE..........................14-36
POSITION SENSOR - OPERATION,
CAMSHAFT...........................8I-4
POSITION SENSOR - OPERATION,
CRANKSHAFT.......................14-25
POSITION SENSOR - OPERATION,
THROTTLE..........................14-36
POSITION SENSOR - REMOVAL,
CRANKSHAFT.......................14-25
POTENTIAL - STANDARD PROCEDURE,
TESTING OF VOLTAGE..............8W-01-9
POWER - INSTALLATION, WINDOW
REGULATOR........................23-22
POWER - REMOVAL, WINDOW
REGULATOR........................23-22
POWER ADJUSTER - INSTALLATION,
FRONT SEAT TRACK..................23-95
POWER ADJUSTER - REMOVAL, FRONT
SEAT TRACK........................23-95
POWER BRAKE BOOSTER -
DESCRIPTION...................5-40,5s-43
POWER BRAKE BOOSTER - DIAGNOSIS
AND TESTING...................5-41,5s-44
POWER BRAKE BOOSTER - OPERATION . . . 5-41,
5s-44
POWER DISTRIBUTION SYSTEM -
DESCRIPTION.....................8W-97-1
POWER DISTRIBUTION SYSTEM -
OPERATION.......................8W-97-1
POWER DISTRIBUTION SYSTEMS,
SPECIAL TOOLS...................8W-97-1
POWER DOOR LEARN CYCLE -
STANDARD PROCEDURE..............8N-28
POWER FOLDAWAY MIRROR SWITCH -
EXPORT - DESCRIPTION...............8N-48
POWER FOLDAWAY MIRROR SWITCH -
EXPORT - INSTALLATION..............8N-49
POWER FOLDAWAY MIRROR SWITCH -
EXPORT - OPERATION................8N-48
POWER FOLDAWAY MIRROR SWITCH -
EXPORT - REMOVAL..................8N-48
POWER LIFTGATE CONTROL MODULE -
DESCRIPTION.......................8E-10
POWER LIFTGATE CONTROL MODULE -
INSTALLATION.......................8E-11
POWER LIFTGATE CONTROL MODULE -
OPERATION.........................8E-11
POWER LIFTGATE CONTROL MODULE -
REMOVAL
..........................8E-11
POWER LIFTGATE LEARN CYCLE -
STANDARD PROCEDURE
...............8N-9
POWER LIFTGATE SYSTEM -
DESCRIPTION
........................8N-2
POWER LIFTGATE SYSTEM - DIAGNOSIS
AND TESTING
........................8N-4
POWER LIFTGATE SYSTEM - OPERATION
. . 8N-3POWER LOCKS - DESCRIPTION.....8N-1,8N-38
POWER LOCKS - OPERATION......8N-2,8N-39
POWER MIRRORS - DESCRIPTION......8N-45
POWER MIRRORS - DIAGNOSIS AND
TESTING...........................8N-46
POWER MIRRORS - OPERATION........8N-45
POWER MODULE - BLOWER MOTOR -
DESCRIPTION.......................24-31
POWER MODULE - BLOWER MOTOR -
INSTALLATION.......................24-32
POWER MODULE - BLOWER MOTOR -
OPERATION.........................24-31
POWER MODULE - BLOWER MOTOR -
REMOVAL..........................24-31
POWER MODULE - DESCRIPTION,
INTEGRATED......................8W-97-2
POWER MODULE - INSTALLATION,
INTEGRATED......................8W-97-3
POWER MODULE - OPERATION,
INTEGRATED......................8W-97-2
POWER MODULE - REAR BLOWER
MOTOR - DESCRIPTION...............24-41
POWER MODULE - REAR BLOWER
MOTOR - INSTALLATION...............24-42
POWER MODULE - REAR BLOWER
MOTOR - OPERATION.................24-41
POWER MODULE - REAR BLOWER
MOTOR - REMOVAL..................24-41
POWER MODULE - REMOVAL,
INTEGRATED......................8W-97-2
POWER OUTLET - DESCRIPTION......8W-97-4
POWER OUTLET - DIAGNOSIS &
TESTING.........................8W-97-4
POWER OUTLET - OPERATION........8W-97-4
POWER SEAT SYSTEM - DIAGNOSIS
AND TESTING...................8N-52,8N-9
POWER SEAT SYSTEM - OPERATION....8N-52,
8N-9
POWER SEAT TRACK - DESCRIPTION,
DRIVER.......................8N-15,8N-58
POWER SEAT TRACK - DESCRIPTION,
PASSENGER...................8N-16,8N-59
POWER SEAT TRACK - DIAGNOSIS AND
TESTING......................8N-17,8N-60
POWER SEAT TRACK - DIAGNOSIS AND
TESTING, DRIVER...............8N-15,8N-58
POWER SEAT TRACK - INSTALLATION,
DRIVER.......................8N-16,8N-59
POWER SEAT TRACK - INSTALLATION,
PASSENGER...................8N-18,8N-61
POWER SEAT TRACK - OPERATION,
DRIVER.......................8N-15,8N-58
POWER SEAT TRACK - OPERATION,
PASSENGER...................8N-17,8N-60
POWER SEAT TRACK - REMOVAL,
DRIVER.......................8N-16,8N-59
POWER SEAT TRACK - REMOVAL,
PASSENGER...................8N-18,8N-61
POWER SLIDING DOOR SYSTEM -
DESCRIPTION.......................8N-19
POWER SLIDING DOOR SYSTEM -
DIAGNOSIS AND TESTING.............8N-22
POWER SLIDING DOOR SYSTEM -
OPERATION.........................8N-21
POWER STEERING BELT TENSION -
STANDARD PROCEDURE, CHECKING.......7-8
POWER STEERING FASTENER TORQUE,
SPECIFICATIONS......................19-9
POWER STEERING FLUID LEVEL
CHECKING - STANDARD PROCEDURE....19-44
POWER STEERING GEAR, SPECIAL
TOOLS.............................19-34
POWER STEERING PUMP INITIAL
OPERATION - STANDARD PROCEDURE . . . 19-37
POWER STEERING PUMP, SPECIAL
TOOLS.............................19-43
POWER STEERING, SPECIAL TOOLS......19-9
POWER STEERING SYSTEM -
DESCRIPTION........................19-1
POWER STEERING SYSTEM -
OPERATION
..........................19-1
POWER STEERING SYSTEM FLOW AND
PRESSURE TEST - DIAGNOSIS AND
TESTING
............................19-1
POWER TRANSFER UNIT - DESCRIPTION
. . 21-1
POWER TRANSFER UNIT - OPERATION
....21-3
POWER TRANSFER UNIT FLUID -
DESCRIPTION, AWD
....................0-6
RSINDEX25
Description Group-Page Description Group-Page Description Group-Page
QUAD CHILD SEAT - REMOVAL.........23-89
QUARTER GLASS INTEGRAL ANTENNA -
EXPORT - DESCRIPTION................8A-9
QUARTER GLASS INTEGRAL ANTENNA -
EXPORT - DIAGNOSIS AND TESTING......8A-9
QUARTER GLASS INTEGRAL ANTENNA -
EXPORT - OPERATION.................8A-9
QUARTER PANEL/FENDER AIR
EXHAUSTER - DESCRIPTION, REAR......23-57
QUARTER PANEL/FENDER AIR
EXHAUSTER - INSTALLATION, REAR.....23-58
QUARTER PANEL/FENDER AIR
EXHAUSTER - REMOVAL, REAR.........23-57
QUARTER TRIM BOLSTER -
INSTALLATION.......................23-79
QUARTER TRIM BOLSTER - REMOVAL....23-79
QUARTER TRIM PANEL - INSTALLATION,
LEFT..............................23-80
QUARTER TRIM PANEL - INSTALLATION,
RIGHT.............................23-79
QUARTER TRIM PANEL - REMOVAL,
LEFT..............................23-80
QUARTER TRIM PANEL - REMOVAL,
RIGHT.............................23-79
QUARTER WINDOW - INSTALLATION....23-111
QUARTER WINDOW - REMOVAL........23-111
QUICK LEARN PROCEDURE - STANDARD
PROCEDURE...................8E-16,8E-23
QUICK-CONNECT FITTINGS - STANDARD
PROCEDURE........................14-14
RACK - DESCRIPTION, LOWER DRIVE
UNIT TRACK........................8N-34
RACK - INSTALLATION, LOWER DRIVE
UNIT TRACK........................8N-34
RACK - OPERATION, LOWER DRIVE UNIT
TRACK.............................8N-34
RACK - REMOVAL, LOWER DRIVE UNIT
TRACK.............................8N-34
RACK CROSSBAR - INSTALLATION,
LUGGAGE..........................23-57
RACK CROSSBAR - REMOVAL, LUGGAGE . 23-56
RACK RISER - INSTALLATION, LUGGAGE . . 23-56
RACK RISER - REMOVAL, LUGGAGE.....23-55
RADIAL-PLY TIRES - DESCRIPTION . 22-14,22s-6
RADIATOR - INSTALLATION.............7-25
RADIATOR - REMOVAL.................7-25
RADIATOR CAP TO FILLER NECK SEAL -
DIAGNOSIS AND TESTING..............7-27
RADIATOR DRAINCOCK - INSTALLATION . . . 7-26
RADIATOR DRAINCOCK - REMOVAL.......7-26
RADIATOR FAN - DESCRIPTION..........7-28
RADIATOR FAN - INSTALLATION..........7-30
RADIATOR FAN - OPERATION............7-29
RADIATOR FAN - REMOVAL.............7-30
RADIATOR FAN MOTOR - DIAGNOSIS
AND TESTING........................7-29
RADIATOR FAN RELAY - DESCRIPTION....7-30
RADIATOR FAN RELAY - INSTALLATION....7-30
RADIATOR FAN RELAY - OPERATION......7-30
RADIATOR FAN RELAY - REMOVAL.......7-30
RADIATOR PRESSURE CAP -
DESCRIPTION........................7-26
RADIATOR PRESSURE CAP - OPERATION . . 7-27
RADIO - DESCRIPTION................8A-10
RADIO - DIAGNOSIS AND TESTING......8A-10
RADIO - INSTALLATION...............8A-11
RADIO - OPERATION..................8A-10
RADIO - REMOVAL...................8A-11
RADIO NOISE SUPPRESSION
COMPONENTS - DESCRIPTION..........8A-11
RADIO NOISE SUPPRESSION
COMPONENTS - OPERATION...........8A-12
RANGE - SPECIFICATIONS,
TRANSMITTER.......................8N-5
RANGE SENSOR - DESCRIPTION,
TRANSMISSION..............21-248,21s-150
RANGE SENSOR - INSTALLATION,
TRANSMISSION..............21-249,21s-152
RANGE SENSOR - OPERATION,
TRANSMISSION..............21-248,21s-151
RANGE SENSOR - REMOVAL,
TRANSMISSION
..............21-249,21s-151
RANGE, SPECIFICATIONS
..............8N-43
READING LAMP - INSTALLATION
........8L-23
READING LAMP - REMOVAL
............8L-23
READING/COURTESY LAMP
REPLACEMENT - STANDARD
PROCEDURE
.........................8M-3REAR - DESCRIPTION, HALF SHAFT.......3-13
REAR - DESCRIPTION, MODE DOOR
ACTUATOR..........................24-39
REAR - INSTALLATION, CRANKSHAFT
OIL SEAL.......................9-129,9-42
REAR - INSTALLATION, HALF SHAFT......3-14
REAR - INSTALLATION, MODE DOOR
ACTUATOR..........................24-40
REAR - INSTALLATION, SPRING
MOUNTS............................2-45
REAR - INSTALLATION, WHEEL
MOUNTING STUDS...................22-22
REAR - OPERATION, MODE DOOR
ACTUATOR..........................24-40
REAR - REMOVAL, CRANKSHAFT OIL
SEAL..........................9-128,9-41
REAR - REMOVAL, HALF SHAFT..........3-13
REAR - REMOVAL, MODE DOOR
ACTUATOR..........................24-40
REAR - REMOVAL, SPRING MOUNTS......2-44
REAR - REMOVAL, WHEEL MOUNTING
STUDS.............................22-21
REAR A/C EVAPORATOR - INSTALLATION . 24-99
REAR A/C EVAPORATOR - REMOVAL.....24-97
REAR A/C EVAPORATOR LINE
EXTENSION - INSTALLATION...........24-99
REAR BLOWER MOTOR - DESCRIPTION,
POWER MODULE....................24-41
REAR BLOWER MOTOR - DIAGNOSIS
AND TESTING.......................24-58
REAR BLOWER MOTOR - INSTALLATION,
POWER MODULE......................24-42
REAR BLOWER MOTOR - OPERATION,
POWER MODULE....................24-41
REAR BLOWER MOTOR - REMOVAL,
POWER MODULE....................24-41
REAR BLOWER MOTOR RESISTOR
BLOCK - DIAGNOSIS AND TESTING......24-38
REAR BUMPER REINFORCEMENT -
INSTALLATION........................13-3
REAR BUMPER REINFORCEMENT -
REMOVAL...........................13-3
REAR COVER - INSTALLATION, FRONT
SEAT TRACK........................23-96
REAR COVER - REMOVAL, FRONT SEAT
TRACK.............................23-96
REAR COVER O-RING - INSTALLATION . . . 21-20
REAR COVER O-RING - REMOVAL.......21-19
REAR DISC BRAKE CALIPER -
INSTALLATION...................5-30,5s-29
REAR DISC BRAKE CALIPER - REMOVAL . . 5-27,
5s-26
REAR DISC BRAKE SHOES -
INSTALLATION...................5-19,5s-18
REAR DISC BRAKE SHOES - REMOVAL....5-17,
5s-16
REAR DOOR GLASS - INSTALLATION....23-111
REAR DOOR GLASS - REMOVAL.......23-111
REAR DRIVELINE MODULE -
DESCRIPTION........................3-23
REAR DRIVELINE MODULE - OPERATION . . 3-23
REAR DRIVELINE MODULE -
SPECIFICATIONS......................3-34
REAR DRIVELINE MODULE FLUIDS -
DESCRIPTION, AWD....................0-6
REAR DRIVELINE MODULE NOISE -
DIAGNOSIS AND TESTING..............3-24
REAR DRIVELINE MODULE OPERATION -
DIAGNOSIS AND TESTING..............3-26
REAR DRUM BRAKE SHOE LINING -
INSPECTION....................5-22,5s-21
REAR DRUM BRAKE SHOES -
ADJUSTMENT...................5-23,5s-22
REAR DRUM BRAKE SHOES -
INSTALLATION...................5-22,5s-21
REAR DRUM BRAKE SHOES - REMOVAL . . 5-19,
5s-18
REAR EVAP CANISTER - INSTALLATION . . . 25-20
REAR EVAP CANISTER - REMOVAL......25-19
REAR FASCIA - INSTALLATION...........13-2
REAR FASCIA - REMOVAL...............13-2
REAR FASCIA - SCUFF PAD -
INSTALLATION
........................13-4
REAR FASCIA - SCUFF PAD - REMOVAL
....13-3
REAR FLOOR HEAT DUCT -
INSTALLATION
.......................24-63
REAR FLOOR HEAT DUCT - REMOVAL
....24-62
REAR HEADER TRIM - INSTALLATION
....23-80REAR HEADER TRIM - REMOVAL........23-80
REAR HEATER CORE FILLING -
STANDARD PROCEDURE..............24-101
REAR HEATER LINES - INSTALLATION . . . 24-111
REAR HVAC - LWB - INSTALLATION,
SEAT BELT & RETRACTOR - SECOND
ROW - RIGHT OUTBOARD WITH........8O-16
REAR HVAC - LWB - REMOVAL, SEAT
BELT & RETRACTOR - SECOND ROW -
RIGHT OUTBOARD WITH..............8O-16
REAR HVAC LOUVER - INSTALLATION....23-81
REAR HVAC LOUVER - REMOVAL........23-81
REAR LATCH STRIKER - INSTALLATION . . . 23-29
REAR LATCH STRIKER - REMOVAL......23-29
REAR MOUNT - INSTALLATION.....9-134,9-50
REAR MOUNT - REMOVAL.........9-133,9-50
REAR OIL SEAL RETAINER -
INSTALLATION, CRANKSHAFT...........9-129
REAR OIL SEAL RETAINER - REMOVAL,
CRANKSHAFT.......................9-129
REAR QUARTER PANEL/FENDER AIR
EXHAUSTER - DESCRIPTION...........23-57
REAR QUARTER PANEL/FENDER AIR
EXHAUSTER - INSTALLATION...........23-58
REAR QUARTER PANEL/FENDER AIR
EXHAUSTER - REMOVAL...............23-57
REAR SUSPENSION - DESCRIPTION......2-27
REAR SUSPENSION - OPERATION........2-28
REAR SUSPENSION FASTENER TORQUE,
SPECIFICATIONS......................2-28
REAR SUSPENSION, SPECIAL TOOLS.......2-28
REAR VIEW MIRROR - INSTALLATION....23-81
REAR VIEW MIRROR - REMOVAL........23-81
REAR WASHER PUMP MOTOR -
INSTALLATION......................8R-10
REAR WASHER PUMP MOTOR -
REMOVAL..........................8R-10
REAR WHEEL SPEED SENSOR - AWD -
INSTALLATION........................5-80
REAR WHEEL SPEED SENSOR - AWD -
REMOVAL...........................5-80
REAR WHEEL SPEED SENSOR - FWD -
INSTALLATION........................5-81
REAR WHEEL SPEED SENSOR - FWD -
REMOVAL...........................5-81
REAR WINDOW DEFOGGER RELAY -
DESCRIPTION........................8G-3
REAR WINDOW DEFOGGER RELAY -
INSTALLATION.......................8G-3
REAR WINDOW DEFOGGER RELAY -
OPERATION..........................8G-3
REAR WINDOW DEFOGGER RELAY -
REMOVAL...........................8G-3
REAR WINDOW DEFOGGER SWITCH -
DESCRIPTION........................8G-4
REAR WINDOW DEFOGGER SWITCH -
OPERATION..........................8G-4
REAR WINDOW DEFOGGER SYSTEM -
DIAGNOSIS AND TESTING..............8G-2
REAR WIPER ARM - INSTALLATION......8R-10
REAR WIPER ARM - REMOVAL.........8R-10
REAR WIPER MOTOR - INSTALLATION . . . 8R-11
REAR WIPER MOTOR - REMOVAL.......8R-11
REAR WIPER SYSTEM - DIAGNOSIS
AND TESTING........................8R-4
REAR WIPER/WASHER SWITCH -
DESCRIPTION.......................8R-11
REAR WIPER/WASHER SWITCH -
OPERATION
.........................8R-11
RECEIVE - PCM INPUT - OPERATION,
DATA BUS COMMUNICATION
...........8E-15
RECEIVER / DRIER - DESCRIPTION
......24-91
RECEIVER / DRIER - INSTALLATION
......24-92
RECEIVER / DRIER - OPERATION
........24-91
RECEIVER / DRIER - REMOVAL
.........24-91
RECIRCULATION DOOR ACTUATOR -
DESCRIPTION
.......................24-32
RECIRCULATION DOOR ACTUATOR -
INSTALLATION
.......................24-33
RECIRCULATION DOOR ACTUATOR -
OPERATION
.........................24-32
RECIRCULATION DOOR ACTUATOR -
REMOVAL
..........................24-33
RECLINER HANDLE - INSTALLATION
.....23-90
RECLINER HANDLE - REMOVAL
.........23-90
RECOVERY - STANDARD PROCEDURE,
REFRIGERANT
.......................24-71
RSINDEX27
Description Group-Page Description Group-Page Description Group-Page
RECOVERY CONTAINER - DESCRIPTION,
COOLANT............................7-19
RECOVERY CONTAINER - INSTALLATION,
COOLANT............................7-20
RECOVERY CONTAINER - OPERATION,
COOLANT............................7-19
RECOVERY CONTAINER - REMOVAL,
COOLANT............................7-20
RECOVERY SYSTEM - DIAGNOSIS AND
TESTING, COOLANT...................7-20
REFACING VALVES AND VALVE SEATS -
STANDARD PROCEDURE..........9-104,9s-21
REFERENCES - DESCRIPTION, TORQUE . . Intro.-8
REFRIGERANT - DESCRIPTION..........24-92
REFRIGERANT - OPERATION............24-92
REFRIGERANT LINE - DESCRIPTION......24-65
REFRIGERANT LINES - INSTALLATION,
UNDERBODY.......................24-111
REFRIGERANT LINES - OPERATION......24-65
REFRIGERANT LINES - REMOVAL,
UNDERBODY.......................24-110
REFRIGERANT OIL - DESCRIPTION......24-92
REFRIGERANT OIL - OPERATION........24-92
REFRIGERANT OIL LEVEL - STANDARD
PROCEDURE........................24-93
REFRIGERANT RECOVERY - STANDARD
PROCEDURE........................24-71
REFRIGERANT SYSTEM CHARGE -
STANDARD PROCEDURE...............24-72
REFRIGERANT SYSTEM EVACUATE -
STANDARD PROCEDURE...............24-72
REFRIGERANT SYSTEM LEAKS -
DIAGNOSIS AND TESTING.............24-66
REFRIGERANT SYSTEM SERVICE
EQUIPMENT - STANDARD PROCEDURE . . . 24-70
REGULATOR - DESCRIPTION, VOLTAGE . . . 8F-27,
8F-29
REGULATOR - INSTALLATION, FUEL
PRESSURE..........................14-7
REGULATOR - MANUAL - INSTALLATION,
WINDOW...........................23-23
REGULATOR - MANUAL - REMOVAL,
WINDOW...........................23-22
REGULATOR - OPERATION, FUEL
PRESSURE..........................14-7
REGULATOR - OPERATION, VOLTAGE....8F-27,
8F-29
REGULATOR - POWER - INSTALLATION,
WINDOW...........................23-22
REGULATOR - POWER - REMOVAL,
WINDOW...........................23-22
REGULATOR - REMOVAL, FUEL
PRESSURE..........................14-7
REINFORCEMENT - INSTALLATION,
FRONT BUMPER......................13-2
REINFORCEMENT - INSTALLATION,
GRILLE OPENING....................23-54
REINFORCEMENT - INSTALLATION, REAR
BUMPER............................13-3
REINFORCEMENT - REMOVAL, FRONT
BUMPER............................13-2
REINFORCEMENT - REMOVAL, GRILLE
OPENING...........................23-54
REINFORCEMENT - REMOVAL, REAR
BUMPER............................13-3
RELAY - DESCRIPTION, A/C
COMPRESSOR CLUTCH
...............24-19
RELAY - DESCRIPTION, AUTO SHUT
DOWN
..............................8I-3
RELAY - DESCRIPTION, BLOWER
MOTOR
.......................24-24,24-37
RELAY - DESCRIPTION, FUEL PUMP
.....14-28
RELAY - DESCRIPTION, RADIATOR FAN
....7-30
RELAY - DESCRIPTION, REAR WINDOW
DEFOGGER
..........................8G-3
RELAY - DESCRIPTION, TRANSMISSION
CONTROL
...................21-247,21s-150
RELAY - INSTALLATION, A/C
COMPRESSOR CLUTCH
...............24-20
RELAY - INSTALLATION, BLOWER
MOTOR
.......................24-25,24-38
RELAY - INSTALLATION, RADIATOR FAN
. . . 7-30
RELAY - INSTALLATION, REAR WINDOW
DEFOGGER
..........................8G-3
RELAY - OPERATION, A/C COMPRESSOR
CLUTCH
............................24-19
RELAY - OPERATION, AUTO SHUT DOWN
. . . 8I-3RELAY - OPERATION, BLOWER MOTOR . . 24-24,
24-37
RELAY - OPERATION, FUEL PUMP.......14-28
RELAY - OPERATION, RADIATOR FAN......7-30
RELAY - OPERATION, REAR WINDOW
DEFOGGER..........................8G-3
RELAY - OPERATION, TRANSMISSION
CONTROL...................21-248,21s-150
RELAY - REMOVAL, A/C COMPRESSOR
CLUTCH............................24-20
RELAY - REMOVAL, BLOWER MOTOR....24-25,
24-38
RELAY - REMOVAL, RADIATOR FAN.......7-30
RELAY - REMOVAL, REAR WINDOW
DEFOGGER..........................8G-3
RELEASE - STANDARD PROCEDURE,
PARKING BRAKE AUTOMATIC
ADJUSTER TENSION..............5-58,5s-61
RELEASE CABLE - INSTALLATION, LATCH . 23-62
RELEASE CABLE - REMOVAL, LATCH.....23-61
RELEASE LEVER AND BEARING -
INSTALLATION, CLUTCH.................6-7
RELEASE LEVER AND BEARING -
REMOVAL, CLUTCH.....................6-6
RELEASE PROCEDURE - STANDARD
PROCEDURE, FUEL SYSTEM
PRESSURE..........................14-2
RELIEF VALVE - DESCRIPTION, HIGH
PRESSURE.........................24-73
RELIEF VALVE - INSTALLATION, OIL
PRESSURE.........................9-141
RELIEF VALVE - OPERATION, HIGH
PRESSURE...........................24-73
RELIEF VALVE - REMOVAL, OIL
PRESSURE.........................9-141
REMOTE ENTRY MODULE -
DESCRIPTION, SENTRY KEY.............8Q-3
REMOTE ENTRY MODULE - DIAGNOSIS
AND TESTING, SENTRY KEY.............8Q-5
REMOTE ENTRY MODULE -
INSTALLATION, SENTRY KEY............8Q-6
REMOTE ENTRY MODULE - OPERATION,
SENTRY KEY.........................8Q-4
REMOTE ENTRY MODULE - REMOVAL,
SENTRY KEY.........................8Q-5
REMOTE ENTRY SYSTEM - DIAGNOSIS
AND TESTING, SENTRY KEY.............8Q-3
REMOTE KEYLESS ENTRY MODULE -
DESCRIPTION.......................8N-43
REMOTE KEYLESS ENTRY MODULE -
DIAGNOSIS AND TESTING.............8N-43
REMOTE KEYLESS ENTRY MODULE -
INSTALLATION......................8N-44
REMOTE KEYLESS ENTRY MODULE -
OPERATION.........................8N-43
REMOTE KEYLESS ENTRY MODULE -
REMOVAL..........................8N-44
REMOTE KEYLESS ENTRY
TRANSMITTER PROGRAMMING -
STANDARD PROCEDURE...............8N-5
REMOTE SWITCH - DIAGNOSIS AND
TESTING...........................8N-49
REMOTE SWITCH - INSTALLATION......8N-49
REMOTE SWITCH - REMOVAL..........8N-49
REMOTE SWITCHES - DESCRIPTION.....8A-12
REMOTE SWITCHES - DIAGNOSIS AND
TESTING...........................8A-12
REMOTE SWITCHES - INSTALLATION.....8A-14
REMOTE SWITCHES - OPERATION.......8A-12
REMOTE SWITCHES - REMOVAL........8A-13
REPAIR - DESCRIPTION, FRONT CRADLE
CROSSMEMBER THREAD...............13-9
REPAIR - DESCRIPTION, THREADED
HOLE.............................Intro.-5
REPAIR - STANDARD PROCEDURE, GRID
LINE AND TERMINAL..................8G-4
REPAIR - STANDARD PROCEDURE,
INTAKE MANIFOLD VACUUM PORT......9-145
REPAIR - STANDARD PROCEDURE,
MANIFOLD STRIPPED THREAD
..........9-145
REPAIR - STANDARD PROCEDURE,
PLASTIC BODY PANEL
.................23-3
REPAIR OF DAMAGED OR WORN
THREADS - STANDARD PROCEDURE
. . 9-10,9-86
REPAIRING - STANDARD PROCEDURE,
TIRE LEAK
.....................22-17,22s-9
REQUIREMENTS - DESCRIPTION,
ENGINE COOLING SYSTEM
..............24-1REQUIREMENTS - DESCRIPTION, FUEL.....0-4
REQUIREMENTS - DIESEL ENGINE -
DESCRIPTION, FUEL....................0-6
RESERVOIR - DESCRIPTION, VACUUM....8P-6
RESERVOIR - INSTALLATION, VACUUM....8P-6
RESERVOIR - INSTALLATION, WASHER . . . 8R-13
RESERVOIR - OPERATION, VACUUM......8P-6
RESERVOIR - REMOVAL, VACUUM........8P-6
RESERVOIR - REMOVAL, WASHER......8R-13
RESET - STANDARD PROCEDURE,
PARKING BRAKE AUTOMATIC
ADJUSTER TENSION..............5-59,5s-61
RESISTANCE, SPECIFICATIONS - SPARK
PLUG CABLE.........................8I-2
RESISTANCE TEST - DIAGNOSIS AND
TESTING, FEED CIRCUIT..........8F-32,8F-34
RESISTOR - DESCRIPTION, BLOWER
MOTOR............................24-38
RESISTOR - INSTALLATION, BLOWER
MOTOR............................24-39
RESISTOR - OPERATION, BLOWER
MOTOR............................24-38
RESISTOR - REMOVAL, BLOWER
MOTOR............................24-39
RESISTOR BLOCK - DESCRIPTION,
BLOWER MOTOR....................24-26
RESISTOR BLOCK - DIAGNOSIS AND
TESTING, BLOWER MOTOR............24-26
RESISTOR BLOCK - DIAGNOSIS AND
TESTING, REAR BLOWER MOTOR.......24-38
RESISTOR BLOCK - INSTALLATION,
BLOWER MOTOR......................24-27
RESISTOR BLOCK - OPERATION,
BLOWER MOTOR....................24-26
RESISTOR BLOCK - REMOVAL, BLOWER
MOTOR............................24-26
RESONATOR - INSTALLATION............11-9
RESONATOR - REMOVAL...............11-9
RESTRAINT ANCHOR - DESCRIPTION,
CHILD..............................8O-4
RESTRAINT ANCHOR - OPERATION,
CHILD..............................8O-4
RESTRAINT CONTROLLER -
DESCRIPTION, OCCUPANT..............8O-8
RESTRAINT CONTROLLER -
INSTALLATION, OCCUPANT.............8O-8
RESTRAINT CONTROLLER - OPERATION,
OCCUPANT..........................8O-8
RESTRAINT CONTROLLER - REMOVAL,
OCCUPANT..........................8O-8
RESTRAINTS - DESCRIPTION............8O-2
RESTRAINTS - OPERATION.............8O-2
RESTRAINTS - WARNING...............8O-2
RESTRICTION CHECK - DIAGNOSIS AND
TESTING, EXHAUST SYSTEM............11-2
RETAINER - INSTALLATION,
CRANKSHAFT REAR OIL SEAL..........9-129
RETAINER - INSTALLATION, PLASTIC
GROCERY BAG
.....................23-105
RETAINER - REMOVAL, CRANKSHAFT
REAR OIL SEAL
......................9-129
RETAINER - REMOVAL, PLASTIC
GROCERY BAG
.....................23-104
RETRACTOR - FIRST ROW - OUTBOARD
- INSTALLATION, SEAT BELT
...........8O-14
RETRACTOR - FIRST ROW - OUTBOARD
- REMOVAL, SEAT BELT
...............8O-14
RETRACTOR - OUTBOARD - FRONT -
INSTALLATION, SEAT BELT
.............8O-14
RETRACTOR - OUTBOARD - FRONT -
REMOVAL, SEAT BELT
................8O-14
RETRACTOR - SECOND ROW - LEFT
OUTBOARD - INSTALLATION, SEAT
BELT
..............................8O-17
RETRACTOR - SECOND ROW - LEFT
OUTBOARD - REMOVAL, SEAT BELT
.....8O-17
RETRACTOR - SECOND ROW - RIGHT
OUTBOARD - INSTALLATION, SEAT
BELT
..............................8O-15
RETRACTOR - SECOND ROW - RIGHT
OUTBOARD - REMOVAL, SEAT BELT
.....8O-15
RETRACTOR - SECOND ROW - RIGHT
OUTBOARD WITH REAR HVAC - LWB -
INSTALLATION, SEAT BELT
.............8O-16
RETRACTOR - SECOND ROW - RIGHT
OUTBOARD WITH REAR HVAC - LWB -
REMOVAL, SEAT BELT
................8O-16
28 INDEXRS
Description Group-Page Description Group-Page Description Group-Page