2004 CHRYSLER VOYAGER heater

[x] Cancel search: heater

Page 2508 of 2585

CHRYSLER VOYAGER 2004  Service Manual point. The cabin heater can take up to three minutes
to completely shut down when either the heater tem-
perature is set below the lower set point or the vehi-
cle ignition is shut down.
NOTE: Do not

Page 2509 of 2585

CHRYSLER VOYAGER 2004  Service Manual (5) Remove the two retaining screws and remove
pipe assembly (Fig. 2).
INSTALLATION
(1) Install the air intake pipe assembly and install
the two retaining screws. Tighten the screws to 7
N´m (62 in.

Page 2510 of 2585

CHRYSLER VOYAGER 2004  Service Manual INSTALLATION
(1) Install the flexible exhaust pipe to the cabin
heater. Tighten the mounting clamp securely.
(2) Position the steel exhaust pipe to the flexible
exhaust. Tighten the mounting clamp sec

Page 2511 of 2585

CHRYSLER VOYAGER 2004  Service Manual NOTE: Utilize an approved fuel storage container to
catch any residual fuel.
(3) Disconnect the wiring harness connector to the
fuel pump by depressing the integral spring and pull-
ing the connector

Page 2512 of 2585

CHRYSLER VOYAGER 2004  Service Manual FUEL LINE
STANDARD PROCEDURE - CLEANING
(1) Remove the cabin heater fuel line (Refer to 24 -
HEATING & AIR CONDITIONING/CABIN HEAT-
ER/FUEL LINE - REMOVAL).
(2) With the cabin heater fuel line removed

Page 2513 of 2585

CHRYSLER VOYAGER 2004  Service Manual INSTALLATION
WARNING: DO NOT OPERATE THE DIESEL SUP-
PLEMENTAL CABIN HEATER IN AN ENCLOSED
AREA SUCH AS A GARAGE THAT DOES NOT HAVE
EXHAUST VENTILATION FACILITIES. ALWAYS VENT
THE CABIN HEATER EXHAUST

Page 2514 of 2585

CHRYSLER VOYAGER 2004  Service Manual (9) Loosen the two fasteners at the rail. Take care
to notice that the exhaust tube bracket tab is on top
of the heater bracket and that there are two spacer
washers installed between the rubber gromm

Page 2517 of 2585

CHRYSLER VOYAGER 2004  Service Manual The following is a list of the monitored compo-
nents:
²Comprehensive Components
²Oxygen Sensor Monitor
²Oxygen Sensor Heater Monitor
²Catalyst Monitor
COMPREHENSIVE COMPONENTS
Along with the majo