2004 CHRYSLER VOYAGER wheel torque

[x] Cancel search: wheel torque

Page 2190 of 2585

CHRYSLER VOYAGER 2004  Service Manual LIFTGATE SILL PLATE
REMOVAL
(1) Disengage hidden clips holding sill plate to lift-
gate door opening sill (Fig. 10).
(2) Remove sill plate from vehicle.
INSTALLATION
(1) Place sill plate in position o

Page 2191 of 2585

CHRYSLER VOYAGER 2004  Service Manual (16) Install first row seat.
(17) Connect the battery negative cable.
LEFT QUARTER TRIM PANEL
REMOVAL
CAUTION: Disconnect the negative cable clamp
from battery post. Damage to accessory feed circuit
c

Page 2192 of 2585

CHRYSLER VOYAGER 2004  Service Manual REAR HVAC LOUVER
REMOVAL
(1) Using a trim stick (C-4755), pry edge of louver
from bezel.
(2) Remove HVAC louver from bezel.
(3) Using a trim stick, pry lower edge of HVAC
bezel away from headlining (F

Page 2193 of 2585

CHRYSLER VOYAGER 2004  Service Manual INSTALLATION
(1) Position D-pillar trim on vehicle.
(2) Pass second row seat belt, if equipped, through
slot in trim panel on short wheel base vehicle.
(3) Connect speaker wire connector to speaker, i

Page 2532 of 2585

CHRYSLER VOYAGER 2004  Service Manual DIAGNOSIS AND TESTING - PCV SYSTEM
WARNING: APPLY PARKING BRAKE AND/OR
BLOCK WHEELS BEFORE PERFORMING ANY TEST
OR ADJUSTMENT WITH THE ENGINE OPERATING.
(1) With engine idling, remove the hose from the

Page 2544 of 2585

CHRYSLER VOYAGER 2004  Service Manual INDEX
ABS FASTENER TORQUE,
SPECIFICATIONS......................5-79
ABSORBER - DESCRIPTION, SHOCK.......2-37
ABSORBER - INSTALLATION, SHOCK......2-38
ABSORBER - OPERATION, SHOCK........2-37
ABSORBER -

Page 2545 of 2585

CHRYSLER VOYAGER 2004  Service Manual ALIGNMENT - STANDARD PROCEDURE,
FRONT WIPER ARM...................8R-8
ALIGNMENT - STANDARD PROCEDURE,
HEADLAMP UNIT.....................8L-13
ALIGNMENT - STANDARD PROCEDURE,
WHEEL....................

Page 2553 of 2585

CHRYSLER VOYAGER 2004  Service Manual CV BOOT - INNER/OUTER -
INSTALLATION........................3-17
CV BOOT - INNER/OUTER - REMOVAL.....3-15
CV BOOT - OUTER - INSTALLATION.......3-10
CV BOOT - OUTER - REMOVAL...........3-10
CYCLE - STA