2003 SSANGYONG MUSSO oil

[x] Cancel search: oil

Page 159 of 1574

SSANGYONG MUSSO 2003  Service Manual M161 ENGINE MECHANICAL  1B2-7
SPECIAL TOOLS TABLE (Co n t’d)
103 589 01 63 00 Rivet Set
103 589 02 09 00 Oil Filter
Socket Wrench 102 589 12 15 00
Drift
615 589 01 33 00Caulking Bolt
102 589 00 15 0

Page 161 of 1574

SSANGYONG MUSSO 2003  Service Manual M161 ENGINE MECHANICAL  1B2-9
MAINTENANCE AND REPAIRON-VEHICLE SERVICE
ENGINE ASSEMBLY 
Tools Required 
000 589 10 99 01 Torque  Wrench 
000 589 40 37 00 Hose Clamp 
112 589 00 72 00 Oil Extractor

Page 164 of 1574

SSANGYONG MUSSO 2003  Service Manual 1B2-12  M161 ENGINE MECHANICAL 
12. Discharge the refrigerant from A/C system, and disconnectthe discharge pipe and suction pipe from the compressor.
14. Remove the fuel feed and return line. Notice B

Page 166 of 1574

SSANGYONG MUSSO 2003  Service Manual 1B2-14  M161 ENGINE MECHANICAL
20. Disconnect following sensors connector.�HFM sensor.
� Coolant temperature sensor.
� 2 knock sensors.
� Camshaft and crankshaft sensors.
21. After removing the igniti

Page 169 of 1574

SSANGYONG MUSSO 2003  Service Manual M161 ENGINE MECHANICAL  1B2-17
CRANKCASE VENTILATION SYSTEM Operation at Idling and Mid-Load
1 HFM Sensor 
2 Cylinder Head Cover 
3 Oil Spearation Chamber (Full-Load or OverMid-Load)
4 Intake Air Duct

Page 170 of 1574

SSANGYONG MUSSO 2003  Service Manual 1B2-18  M161 ENGINE MECHANICAL Operation at Idling and Mid-Load 
�The throttle valve(6) is closed or very partially opened, and the vacuum pressure in intake manifold is high. The blow-by gas and the

Page 171 of 1574

SSANGYONG MUSSO 2003  Service Manual M161 ENGINE MECHANICAL  1B2-19
Operation When Full-Load at Partial Load
1 HFM Sensor 
2 Cylinder Head Cover 
3 Oil Spearation Chamber (Full-Load or OverMid-Load)
4 Intake Air Duct (Cross Pipe)
5 Vent

Page 172 of 1574

SSANGYONG MUSSO 2003  Service Manual 1B2-20  M161 ENGINE MECHANICAL Operation When Full-Load at Partial Load 
�The throttle valve (6) is partially opened or fully opened. The air flows very rapidly through the vent line(5)s connection(D)