2003 DODGE RAM engine

[x] Cancel search: engine

Page 2814 of 2895

DODGE RAM 2003  Service Repair Manual (7) Evacuate the refrigerant system. (Refer to 24 -
HEATING & AIR CONDITIONING/PLUMBING -
STANDARD PROCEDURE - REFRIGERANT SYS-
TEM EVACUATE)
(8) Charge the refrigerant system. (Refer to 24 -
HEATING

Page 2815 of 2895

DODGE RAM 2003  Service Repair Manual (5) Disconnect the condenser cooling fan electric
connector.
(6) Remove the two nuts that secure the condenser
studs to the upper cross brace. (Fig. 5).
(7) Remove the condenser and fan assembly from

Page 2816 of 2895

DODGE RAM 2003  Service Repair Manual NOTE: Removal of the front bumper on the V-10 is
required, failure to do so could result in damage to
the condenser assembly and the bumper.
(3) Remove the front bumper assembly from the
vehicle(Refer

Page 2817 of 2895

DODGE RAM 2003  Service Repair Manual AIR CONDITIONING/PLUMBING - STANDARD
PROCEDURE - A/C LINE COUPLERS)
(4) Remove the tape or plugs from the refrigerant
line fittings on the condenser inlet and the discharge
line. Connect the discharge

Page 2818 of 2895

DODGE RAM 2003  Service Repair Manual NOTE: If the condenser is replaced, add 30 millili-
ters (1 fluid ounce) of refrigerant oil to the refriger-
ant system. Use only refrigerant oil of the type
recommended for the compressor in the vehi

Page 2819 of 2895

DODGE RAM 2003  Service Repair Manual (2) Recover the refrigerant from the refrigerant
system. (Refer to 24 - HEATING & AIR CONDI-
TIONING/PLUMBING - STANDARD PROCEDURE -
REFRIGERANT RECOVERY)
(3) Unplug the wire harness connector from th

Page 2820 of 2895

DODGE RAM 2003  Service Repair Manual STANDARD PROCEDURE - REFRIGERANT SYS-
TEM EVACUATE)
(7) Charge the refrigerant system. (Refer to 24 -
HEATING & AIR CONDITIONING/PLUMBING -
STANDARD PROCEDURE - REFRIGERANT SYS-
TEM CHARGE)
LIQUID LIN

Page 2821 of 2895

DODGE RAM 2003  Service Repair Manual STANDARD PROCEDURE - REFRIGERANT SYS-
TEM EVACUATE)
(8) Charge the refrigerant system. (Refer to 24 -
HEATING & AIR CONDITIONING/PLUMBING -
STANDARD PROCEDURE - REFRIGERANT SYS-
TEM CHARGE)
SUCTION LI