Page 803 of 1184

MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM 7B -- 21
DAEWOO M-150 BL2
D18B511B
Installation Procedure
1. Install the compressor with the mounting bolts.
Tighten
DTighten the compressor--to--bracket upper bolt to
20 NSm (15 lb-ft) (1).
DTighten the compressor--to--bracket lower bolts to
22 NSm (16 lb-ft) (2).
2. Connect the electrical connector.
D18B512A
3. Install the A/C high pressure pipe line to the compres-
sor with the bolt.
Tighten
Tighten the A/C high pressure pipe line bolt to 23 NSm
(17 lb-ft) (3).
4. Install the A/C low pressure pipe line to the compres-
sor with the bolt.
Tighten
Tighten the A/C low pressure pipe line bolt to 23 NSm
(17 lb-ft) (4).
5. Evacuate and charge the system. Refer to “Discharg-
ing, Adding Oil, Evacuating, and Charging Procedure
for A/C System” in this section.
6. Install the A/C belt. Refer toSection 6B, Power Steer-
ing Pump.
7. Install the receiver dryer. Refer to “Receiver Dryer
and Dual Cut Switch” in this section.
D18B513A
CONDENSER
1. Disconnect the negative battery cable.
2. Remove the front bumper fascia. Refer toSection
9O, Bumpers and Fascias.
3. Discharge and recover the refrigerant. Refer to “Dis-
charging, Adding Oil, Evacuating, and Charging Pro-
cedures for A/C system” in this section.
4. Remove the condenser.
DLoosen the condenser pipe--to--compressor pipe
fitting (1).
DLoosen the condenser pipe--to--receiver dryer pipe
fitting (2).
Page 804 of 1184

7B -- 22 MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM
DAEWOO M-150 BL2
D18B514A
DRemove the condenser mounting nuts (3).
DPush the top of the condenser (4).
DTake off the condenser from the lower bracket by
lifting the condenser (5).
DRemove the condenser (6).
D18B515B
Installation Procedure
Important:Discard the removed O--rings.
1. Install the condenser with the nuts.
Tighten
Tighten the condenser mounting nuts to 4 NSm(36lb-
in).
D18B516B
2. Tighten the fittings and the bolt.
Tighten
DTighten the condenser pipe--to--compressor pipe
fitting to 23 NSm (17 lb-ft) (1).
DTighten the condenser pipe--to--receiver dryer pipe
fitting to 14 NSm (10.5 lb-ft) (2).
3. Evacuate and recharge the system. Refer to “Dis-
charging, Adding Oil, Evacuating, and Charging Pro-
cedures for A/C System” in this section.
4. Install the front bumper fascia. Refer toSection 9O,
Bumpers and Fascias.
5. Connect the negative battery cable.
D108B517
A/C HIGH PRESSURE PIPE LINE
(Left -- Hand Drive Shown, Right -- Hand
Drive Similar)
Removal Procedure
1. Disconnect the negative battery cable.
2. Remove the front bumper fascia. Refer toSection
9O, Bumpers and Fascias.
3. Discharge and recover the refrigerant. Refer to “Dis-
charging, Adding Oil, Evacuating, and Charging Pro-
cedures for A/C System” in this section.
4. Remove the A/C high pressure pipe line between the
compressor and the condenser.
DRemove the bolt securing the high pressure pipe
line to the compressor (1).
Page 805 of 1184
MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM 7B -- 23
DAEWOO M-150 BL2
D18B518A
DLoosen the fitting securing the high pressure pipe
line to the condenser pipe line (2).
DRemove the clamp nut (3).
D18B519A
5. Remove the A/C high pressure pipe line between the
condenser and the receiver dryer.
DLoosen the fitting securing the receiver dryer to the
condenser (1).
D108B520
DRemove the receiver dryer flange nuts (2).
D18B521A
6. Remove the A/C high pressure pipe line between the
receiver dryer and the evaporator.
DRemove the purge control valve. Refer toSection
1F, Engine Controls.
DRemove the bracket nut (1).
DLoosen the fitting (2).
Page 806 of 1184

7B -- 24 MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM
DAEWOO M-150 BL2
D18B522A
D18B523B
D18B524A
Installation Procedure
Important:Discard the removed O--rings.
1. Install the high pressure pipe lines with the bolts, the
nuts, and the fittings.
Tighten
DTighten the bolt securing the high pressure pipe
line to the compressor to 23 NSm (17 lb-ft) (1).
DTighten the fitting securing the high pressure pipe
line to the condenser pipe line to 23 NSm (17 lb-ft)
(2).
DTighten the fitting securing the high pressure pipe
line to the receiver dryer to 14 NSm (10.5 lb-ft) (3).
DTighten the bracket nut to 5 NSm (44 lb-in) (4).
DTighten the receiver dryer flange nuts to 14 NSm
(10.5 lb-ft) (5).
DTighten the nut securing the high pressure pipe line
to the evaporator to 14 NSm (10.5 lb-ft) (6).
DTighten the bracket nut to 5 NSm (44 lb-in) (7).
2. Install the purge control valve. Refer toSection 1F,
Engine controls.
3. Evacuate and recharge the system. Refer to “Dis-
charging, Adding Oil, Evaculating, and Charging Pro-
cedures for A/C System” in this section.
4. Install the front bumper fascia. Refer toSection 9O,
Bumpers and Fascias.
5. Connect the negative battery cable.
D18B525B
Page 807 of 1184
MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM 7B -- 25
DAEWOO M-150 BL2
D108B526
A/C LOW PRESSURE PIPE LINE
(Left -- Hand Drive Shown, Right -- Hand
Drive Similar)
Removal Procedure
1. Disconnect the negative battery cable.
2. Discharge and recover the refrigerant. Refer to “Dis-
charging, Adding Oil, Evacuating, and Charging Pro-
cedures for A/C System” in this section.
3. Remove the A/C low pressure pipe line.
DRemove the bolt securing the A/C low pressure
pipe line at the compressor (1).
D18B527A
DRemove the bracket nut from shut bar (2).
D18B528A
DRemove the purge control valve. Refer toSection
1F, Engine Controls.
DLoosen the nut securing the A/C low pressure pipe
line at the evaporator (3).
D18B529B
Installation Procedure
Important:Discard the removed O--rings.
1. Install the A/C low pressure pipe line.
Tighten
DTighten the nut securing the A/C low pressure pipe
line at the evaporator to 14 NSm (10.5 lb-ft) (1).
Page 808 of 1184

7B -- 26 MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM
DAEWOO M-150 BL2
D18B530B
D18B531A
DTighten the bracket nut to 5 NSm (44 lb-in) (2).
DTighten the bolt securing the A/C low pressure pipe
line at the compressor to 23 NSm (17 lb-ft) (3).
2. Evacuate and recharge the system. Refer to “Dis-
charging, Adding Oil, Evacuating, and Charging Pro-
cedure for A/C System” in this section.
3. Connect the negative battery cable.
D108B532
D108B533
EVAPORATOR UNIT AND DRAIN
HOSE
(Left -- Hand Drive Shown, Right -- Hand
Drive Similar)
Removal Procedure
1. Disconnect the negative battery cable.
2. Discharge and recover the refrigerant. Refer to “Dis-
charging, Adding Oil, Evacuating, and Charging Pro-
cedures for A/C System” in this section.
3. Loosen the high pressure pipe line (receiver dry-
er→evaporator) nut and the low pressure pipe line
(evaporator→compressor) nut.
4. Remove the glove box. Refer toSection 9E, Instru-
mentation/Driver information.
5. Remove the evaporator unit.
DRemove the drain hose (1).
DDisconnect the thermistor connector (2).
DRemove the screws (3).
DRemove the evaporator backward slowly (4).
Page 809 of 1184
MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM 7B -- 27
DAEWOO M-150 BL2
D18B534A
Installation Procedure
1. Install the evaporator evaporator with the screws.
2. Connect the thermistor connector.
3. Install the drain hose.
4. Install the glove box. Refer toSection 9E, Instrumen-
tation / Driver Information.
5. Tighten the high pressure pipe line (receiver dry-
er→evaporator) nut and the low pressure pipe line
(evaporator→compressor) nut to 14 NSm (10.5 lb-ft).
6. Evacuate and recharge the system. Refer to “Dis-
charging, Adding Oil, Evacuating, and Charging Pro-
cedures for A/C System” in this section.
7. Connect the negative battery cable.
Page 810 of 1184

7B -- 28 MANUAL CONTROL HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM
DAEWOO M-150 BL2
UNIT REPAIR
D18B701A
EVAPORATOR CORE AND
EXPANSION VALVE
Disassembly Procedure
1. Remove the evaporator unit. Refer to “Evaporator
Unit and Drain Hose” in this section.
2. Remove the evaporator core and expansion valve.
DRemove the screw (1).
DRemove the clamp (2).
DRemove the screws securing the evaporator case
cover (3).
DRemove the upper evaporator case cover (4).
DRemove the lower evaporator case cover (5).
DRemove the thermistor (6).
DLoosen the fitting and remove the high pressure
pipe line (7).
DRemove the tape (8).
DRemove the evaporator plate seal (9).
DLoosen the fitting and remove the expansion valve
(10).
D18B702A
Assembly Procedure
1. Install the exponsion valve with the fitting.
Tighten
Tighten the high pressure pipe line coupling to 17 NSm
(13 lb-ft) (1).
2. Install the evaporator plate seal.
3. Install the tape.
4. Install the high pressure pipe line with the fitting.
Tighten
Tighten the expansion valve coupling to 22 NSm(16
lb-ft) (2).
5. Install the thermistor.
6. Install the screws securing the evaporator case cov-
er.
7. Install the clamp and the screw.
8. Install the evaporator unit. Refer to “Evaporator Unit
and Drain Hose” in this section.