2001 SUZUKI GRAND VITARA Power

[x] Cancel search: Power

Page 434 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual AUTOMATIC TRANSMISSION (4 A/T) 7B1-25
Table B-4 : “POWER” Light Circuit Check (“POWER” Light Comes ON 
Steadily)
WIRING DIAGRAM
Refer to “TABLE B-3” in this section.
TROUBLESHOOTING
[A] fo

Page 444 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual AUTOMATIC TRANSMISSION (4 A/T) 7B1-35
DTC CONFIRMATION PROCEDURE
1) Connect scan tool to DLC with ignition switch OFF, if available.
2) Clear DTC, pending DTC and freeze frame data in PCM memory by us

Page 446 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual AUTOMATIC TRANSMISSION (4 A/T) 7B1-37
DTC CONFIRMATION PROCEDURE
1) Connect scan tool to DLC with ignition switch OFF, if available.
2) Clear DTC, pending DTC and freeze frame data in PCM memory by us

Page 470 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual AUTOMATIC TRANSMISSION (4 A/T) 7B1-61
Special Tool
09925-37811-001 09931-76030 09931-76011
Oil pressure gauge 16/14 pin DLC cable for 
Tech 1AMass storage cartridge for 
Tech 1ATech 1A kit (SUZUKI sca

Page 477 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 7E-4 DIFFERENTIAL (FRONT)
Flow table
Step Action Yes No
1 Turn ON ignition switch (but engine at stop) and 
check malfunction indicator lamp.
Does lamp light up?Go  to  step  2. A trouble has occurred

Page 487 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 7F-2  DIFFERENTIAL (REAR)
General Description
The differential assembly using a hypoid bevel pinion and gear is installed to the rear axle. It is set in the conven-
tional type axle housing.
The diffe

Page 492 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual DIFFERENTIAL (REAR) 7F-7
b) Remove differential left case (2) from differential right case
(1).
c) Remove pinion shafts, differential gears, washers, differen-
tial pinions, spring washers, thrust was

Page 502 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual DIFFERENTIAL (REAR) 7F-17
9) While tightening flange nut gradually with special tool and
power wrench (4 - 10 magnification) (1), set preload of pinion
to specification.
Pinion bearing preload
: 0.9