2001 CHRYSLER VOYAGER instrument panel

[x] Cancel search: instrument panel

Page 3683 of 4284

CHRYSLER VOYAGER 2001  Service Manual (2) Remove the instrument panel from the vehicle.
(Refer to 23 - BODY/INSTRUMENT PANEL/IN-
STRUMENT PANEL ASSEMBLY - REMOVAL).
(3) Place the instrument panel face down on a
suitable work surface. Be c

Page 3701 of 4284

CHRYSLER VOYAGER 2001  Service Manual (6) Remove the tape or plugs from the condenser
inlet port and the discharge line fitting (Fig. 7).
(7) Lubricate a new rubber O-ring seal with clean
refrigerant oil and install it on the discharge li

Page 3706 of 4284

CHRYSLER VOYAGER 2001  Service Manual connector receptacle on the top of the expansion
valve.
(7) Remove the tape or plugs from the front liquid
line rear section and suction line fittings for the
expansion valve and both ports on the fro

Page 3707 of 4284

CHRYSLER VOYAGER 2001  Service Manual (5) Remove the three screws that secure the heater
core shield to the left end of the HVAC distribution
housing (Fig. 15).
(6) Pull the heater core shield rearward far enough
to disengage the two loca

Page 3709 of 4284

CHRYSLER VOYAGER 2001  Service Manual (16) Use absorbent toweling to mop up any engine
coolant spills from the preceding operation. Also, if
the heater core was leaking, use absorbent toweling
and reach into the heater core opening to mop

Page 3710 of 4284

CHRYSLER VOYAGER 2001  Service Manual INSTALLATION - HEATER CORE
WARNING: REFER TO THE APPLICABLE WARN-
INGS AND CAUTIONS FOR THIS SYSTEM BEFORE
PERFORMING THE FOLLOWING OPERATION.
(Refer to 24 - HEATING & AIR CONDITIONING/
PLUMBING FRONT

Page 3742 of 4284

CHRYSLER VOYAGER 2001  Service Manual REFRIGERANT
DIAGNOSIS AND TESTING - REFRIGERANT
SYSTEM CHARGE LEVEL 2.5L DIESEL
WARNING: REFER TO THE APPLICABLE WARN-
INGS AND CAUTIONS FOR THIS SYSTEM BEFORE
PERFORMING THE FOLLOWING OPERATION.
(Ref

Page 3779 of 4284

CHRYSLER VOYAGER 2001  Service Manual EXHAUST GAS RECIRCULATION
TABLE OF CONTENTS
page page
EXHAUST GAS RECIRCULATION
DESCRIPTION............................3
OPERATION.............................3
VA LV E
DESCRIPTION....................