2000 SUZUKI SWIFT cooling

[x] Cancel search: cooling

Page 421 of 557

SUZUKI SWIFT 2000 1.G SF310 Service Workshop Manual 6E1-30 ENGINE AND EMISSION CONTROL SYSTEM (TBI FOR G10)
1. Insulator
2. Lower gasket
3. Heater
1. Intake manifold
2. EFE heater
1. EFE heater relay
2. Relay box
1. Radiator fan motor
INSPECTION
Check

Page 443 of 557

SUZUKI SWIFT 2000 1.G SF310 Service Workshop Manual ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13) 6E2-15
CAUTION:
Do not disassemble IAC
valve. Disassembly spoils
its original performanceCAUTION:
Do not remove or adjust
throttle stop screw as it is

Page 445 of 557

SUZUKI SWIFT 2000 1.G SF310 Service Workshop Manual 21
ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13) 6E2-17
2) Connect engine coolant hoses (1).
3) Install throttle body (4) to intake manifold.
4) Connect coupler to TP sensor (2) and IAC valve (3) s

Page 462 of 557

SUZUKI SWIFT 2000 1.G SF310 Service Workshop Manual 6E2-34 ENGINE AND EMISSION CONTROL SYSTEM (SFI FOR G13)
FUEL CUT OPERATION
Inspection
NOTE:
Before inspection, check to make sure that gear shift lever is
in neutral position (with A / T model, select
Page:   < prev 1-10 ... 9-16 17-24 25-32 33-40 41-48