1) Release fuel pressure. See FUEL PRESSURE RELEASE.
Disconnect negative battery cable. Drain cooling system. Disconnect
accelerator, cruise control, and transmission kickdown cables.
Disconnect fuel lines at throttle body. See FUEL LINE DISCONNECT
FITTINGS.
2) Remove engine cover (Ram Van/Wagon), air cleaner and
generator. Disconnect necessary electrical wiring, coolant hoses and
vacuum hoses. Remove distributor cap and spark plug wires. Remove
valve covers (if necessary).
3) Remove bolts, intake manifold and gaskets. Separate
throttle body from intake manifold (if necessary). Turn intake
manifold upside-down and remove plenum pan (if necessary).
Fig. 4: Plenum Pan Bolt Tightening Sequence
Courtesy of Chrysler Corp.
Installation
1) Install plenum pan and install all bolts finger tight.
and camshaft. To install remaining components, reverse removal
procedure.
Fig. 8: Aligning Timing Marks
Courtesy of Chrysler Corp.
ROCKER ARMS
Removal
Disconnect spark plug wires, PCV and fuel evaporation hoses.
Remove valve covers. Remove bolts, pivots, and rocker arms. Wire
components together for installation reference. Mark each push rod for
location, and remove (if necessary).
CAUTION: To avoid piston-to-valve contact during rocker arm
installation, crankshaft must be placed in specified
position. Wait 5 minutes before starting engine to allow
valve lifters to bleed down after rocker arm installation.
Installation
1) On 3.9L engine, locate "V6" mark stamped on vibration
damper (147 degrees ATDC). Rotate engine by hand until "V6" mark lines\
up with TDC mark on timing chain cover.
2) On 5.2L and 5.9L engines, locate "V8" mark stamped on
vibration damper (147 degrees ATDC). Rotate engine by hand until "V8"
mark lines up with TDC mark on timing chain cover.
3) Install rocker arm and pivot assemblies and tighten bolt
to 21 ft. lbs. (28 N.m). Wait 5 minutes before starting engine to
allow valve lifters to bleed down after rocker arm installation. To
install remaining components, reverse removal procedure. Tighten valve
cover bolts to 95 INCH lbs. (11 N.m).
VALVE LIFTERS