1997 SUBARU LEGACY service

[x] Cancel search: service

Page 293 of 3342

SUBARU LEGACY 1997  Service Repair Manual D: ASSEMBLY
B2M1264B
Tightening torque: N⋅m (kg-m, ft-lb)
T: 5±1 (0.5±0.1, 3.6±0.7)
1) Install rocker adjust screw and nut to rocker arm, and
loosely tighten nut.
2) Arrange valve rocker arms, sp

Page 294 of 3342

SUBARU LEGACY 1997  Service Repair Manual E: INSTALLATION
B2M1206B
Tightening torque: N⋅m (kg-m, ft-lb)
T1: 5±1 (0.5±0.1, 3.6±0.7)
T2: 12±1 (1.2±0.1, 8.7±0.7)
B2M1207B
1) Installation of valve rocker assembly
(1) Temporarily tighten b

Page 295 of 3342

SUBARU LEGACY 1997  Service Repair Manual 5. Camshaft
A: REMOVAL
1. RELATED PARTS
1) Remove timing belt, camshaft sprockets and related
parts.
<Ref. to 2-3 [W3A0].>
2) Remove valve rocker assembly.
<Ref. to 2-3 [W4A0].>
2. CAMSHAFT LH
B2M0384

Page 296 of 3342

SUBARU LEGACY 1997  Service Repair Manual 3. CAMSHAFT RH
B2M0385A
1) Remove camshaft support RH.
2) Remove O-ring.
3) Remove camshaft.
4) Remove oil seal.
CAUTION:
Do not remove oil seal unless necessary.
Do not scratch journal surface when

Page 297 of 3342

SUBARU LEGACY 1997  Service Repair Manual Unit: mm (in)
ItemRight-hand camshaft Front Center Rear
Left-hand camshaft Rear Center Front
Clearance at journalStandard 0.055—0.090 (0.0022—0.0035)
Limit 0.10 (0.0039 )
Camshaft journal O.D.31.9

Page 298 of 3342

SUBARU LEGACY 1997  Service Repair Manual C: INSTALLATION
1. CAMSHAFT LH
B2M0384B
Tightening torque: N⋅m (kg-m, ft-lb)
T1: 10 (1.0, 7)
T2: 16 (1.6, 12)
1) Apply a coat of engine oil to camshaft journals and
install camshaft LH.
2) Apply a c

Page 299 of 3342

SUBARU LEGACY 1997  Service Repair Manual 2. CAMSHAFT RH
B2M0385B
Tightening torque: N⋅m (kg-m, ft-lb)
T: 16 (1.6, 12)
1) Apply a coat of engine oil to camshaft journals and
install camshaft RH.
2) Apply a coat of engine oil or grease to O-

Page 300 of 3342

SUBARU LEGACY 1997  Service Repair Manual 3. RELATED PARTS
1) Install valve rocker assembly.
<Ref. to 2-3 [W4E0].>
B2M0418B
Tightening torque: N⋅m (kg-m, ft-lb)
T1: 5±1 (0.5±0.1, 3.6±0.7)
T2: 12±1 (1.2±0.1, 8.7±0.7)
2) Install timing