1995 JEEP CHEROKEE torque

[x] Cancel search: torque

Page 1106 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (4) Install the through bolt and the retaining nut
(Fig. 6). Tighten the through bolt nut to 65 Nzm (48
ft. lbs.) torque.
(5) Remove the engine support.
(6) Lower the vehicle.
(7) Connect negative cab

Page 1107 of 2198

JEEP CHEROKEE 1995  Service Repair Manual INSTALLATIONÐYJ VEHICLES
(1) If the engine support bracket was removed, po-
sition the bracket onto the block and install the at-
taching bolts (Fig. 9). Tighten the bolts to 62 Nzm (46
ft. lbs.) tor

Page 1108 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (5) Remove the transmission support.
(6) Lower the vehicle.
(7) Connect negative cable to battery.
REMOVALÐYJ VEHICLES
(1) Disconnect negative cable from battery.
(2) Raise the vehicle and support th

Page 1109 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (2) Install the upper inner retainer and bushing on
the top of the damper.
(3) Position the upper damper bracket over the
damper and install the stud nut and bolts.
(4) Tighten the stud nut to 23 Nzm

Page 1111 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (a) Align the transmission torque converter hous-
ing with the engine.
(b) Loosely install the converter housing lower
bolts and install the next higher bolt and nut on
each side.
(c) Tighten all 4 bo

Page 1112 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (7) Disconnect the wires at the starter motor sole-
noid and injection wire harness connector.
(8) Disconnect the quick-connect fuel lines at the
fuel rail and return line by squeezing the two retain-

Page 1113 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (14) Install the remaining flywheel housing bolts.
Tighten the bolts to 38 Nzm (28 ft. lbs.) torque.
(15) Install the starter motor and connect the ca-
ble. Tighten the bolts to 45 Nzm (33 ft. lbs.) t

Page 1114 of 2198

JEEP CHEROKEE 1995  Service Repair Manual (3) Connect the CCV hoses (Fig. 1).
(4) Connect negative cable to battery.
VALVE COMPONENT REPLACEÐCYLINDER HEAD
NOT REMOVED
ROCKER ARMS AND PUSH RODS
This procedure can be done with the engine in or