Page 92 of 1216

2-44FRONT SUSPENSION -Centermember and Crossmember
CENTERMEMBER AND CROSSMEMBER
REMOVAL AND INSTALLATION
Pre-removal Operation
l Disconnection of the Front Exhaust Pipewhen removing the Crossmember (Re-
fer to GROUP 1 l-Exhaust Pipe and
Main Muffler.)
@Raise and Suspend the Engine to the
Extent Force is not applied to the EnginePost-installation Operation
*Lower the Enginel coupling of the Front Exhaust Pipe (Re-fer to GROUP ll-Exhaust Pipe and
Main Muffler.)
@Air bleeding of the Power-steering Fluid
(Refer to GROUP 19-Service Adjust-
ment Procedures.)*Adjustment of the Front Wheel Align-
ment
(Refer to GROUP
2-Service AdjustmentProcedures.)
40-50 Nm
29-36 ft.lbs.
! *J
I”---
7
9
80-100 Nm
58-72 ft.lbs.
\80-100 Nm
58-72 ft.lbs.
70-86 Nm
51-58 ft.lbs.llA0283
Removal steps
1. Front roll stopper bracket mounting bolt
2. Centermember installation bolts (front)3. Stopper
4. Bushing
5. Bushing
6. Collar7. Centermember installation bolts (rear)
8. Centermember
9. StayNOTEReverse the removal procedures to reinstall.
4
Page 97 of 1216
FRONT SUSPENSION - Centermember and Crossmember2-49
CENTERMEMBER AND CROSSMEMBER
- REMOVAL AND INSTALLATIONNOZYA-B
40-50 Nm
29-36 ft.lbs.
50-65 Nm
36-47 ft.lbs.
\
80-I:0 Nm
58-72 ft.lbs.3'
/I-Y--
7t
/70-80Nm80-100 Nm151-58ft.lbs.58-72 ft.lbs.OlA0619
80-100 Nm70-80Nm58-72 ftlbs.51-58ftlbs.
-30 ll.l”S.,
e ~
70-80 Nm51-58
ft.lbs.7n-~0 NmI” .s- .w...51-58 ft.lbs.Removal steps
1. Cover installation screw
2.Left member3.Right member
4. Front roll stopper installation bolt
5.No. 1 crossmember
installation
nut
6.Lower plate7.No. 1 crossmember
8.
9.Bushing (B)10.GussetPost-installation Operation
l Air bleeding of the Power-steering Fluid(Refer to GROUP 19-Service
*Adjustment
P.2-8.)
NOTE
(I)(2) q : Non-reusable parts
Page 424 of 1216

11-2INTAKE AND EXHAUST - Specifications
SPECIFICATIONS
GENERAL SPECIFICATIONS.prtNIICA-Items
Air cleaner
ElementExhaust system
Front exhaust pipe
Front exhaust pipe
Muffler
CouplingSuspension system
Turbocharger
TypeIdentification No.
4iT>Supercharging pressure control
Intercooler
TypeSpecifications
Unwoven cloth type
Dual type
Single type
Expansion resonance type
Flat coupling
Rubber hangers and O-rings
Exhaust gas turbine type
TD05H-14B-6
TD04-13G-5Waste gate actuator and valve
Air cooled type
SERVICE SPECIFICATIONSNllCB- spr*
ItemsStandardIntake and exhaust manifolds
Distorsion of cylinder head contacting surfacemm (in.) Less than 0.15
(.0059)Supercharging pressure solenoid valve terminal resistance36-44
[at
20°C (68”F)lQ
TurbochargerSupercharging pressure
kPa (psi)
41-75 (6.0- 10.8)
37-68 (5.4-9.9)Waste gate valve opening pressure
kPa (psi)
Approx. 76.7 (11 .l)
Approx. 72.0 (10.4)Limit
0.3
l.0121
TORQUE SPECIFICATIONSNllCC-
ItemsAir cleaner
Air cleaner to body
ResonatorAir cleaner bracket
Intercooler
Intercooler to body
Air by-pass valve
Air pipe
B
Nmftlbs.
8-106-7
10-137-9
12-15
9-11
12-15
9-11
15-22
11-16
12-15
9-11
Page 619 of 1216
REAR SUSPENSION - ‘Shock Absorber Asset&y“fg$
DISASSEMBLY AND REASSEMBLYNI’IOM-A
Disassembly steps
+e ~~ ?. Piston rod tightening nut
2. Washer
3. Upper bushing (A)
e+ 4. Bracket assembly
5. Upper spring pad
6. Upper bushing
(B)7. Collarl + 8. Cup assembly
l + 9. Dust cover
10. Bump rubber
l 4 11. Coil spring12. Shock absorber
NOTE(1) Reverse the disassembly procedures to reassemble.(2) +I) : Refer to “Service Points of Disassembly”.(3)~~ : Refer to “Service Points of Reassembly”.(4)q : Non-reusable parts
\@3----612AO328
12Y626
SERVICE POINTS OF DISASSEMBLYNI’IGNAAI
1. REMOVAL OF PISTON ROD TIGHTENING NUT(1) Before removing the piston rod tightening nut,
compress the coil spring using the special tools.
CautionDo not use an air tool to tighten the bolt of the
special tool.(2) While holding the piston rod, remove the piston rod
tightening nut.
INSPECTION
Nl?GOAAll Check the rubber parts for damage.
lCheck the coil springs for crack, damage or deterioration.
Page 630 of 1216

17-20REAR SUSPENSION -Service Adjustment Procedures
12R0556-- Upper arm
(L.H.)
12A0081
SERVICE ADJUSTMENT PROCEDURES
REAR WHEEL ALIGNMENT INSPECTIONN17FDAB is.Measure the wheel alignment with the vehicle parked on level
--’
ground.The rear suspension and wheels should be inspected for
wear’or damage and repaired prior to measurement of wheel,
alignment.
TOE-IN
(1) Measure the toe-in with a toe-in gauge.
Standard value:
3.6f3 mm (.14+ .I18 in.)
(2) If the toe-in is not within the standard value, adjust it by
moving the mounting bolts located on the crossmember
side of the trailing arm.
NOTEMake the adjustment by moving the left and the right bolts
r;hr
equally.Movement of one division on the scale will cause toe-in
variation of about 2 mm
(.08 in.).
CAMBER
(1) Measure the camber with a camber/caster/kingpin gauge.
Standard value:
-1”33’f30’(2) If the camber is not within the standard value, adjust it by
moving the mounting bolt located on the crossmember
side of the upper arm.
NOTEMovement of one division on the scale will cause camber
variation of about 15’.
Caution
1. As toe-in will vary 0.9 mm
(.035 in.) for every
camber scale adjustment, adjust the toe after
adjusting camber.
2. The difference between the left and the right
camber shall be less than 15’.
Page 643 of 1216
REAR SUSPENSION - Shock Absorber Assemblv
DISASSEMBLY AND REASSEMBLY
Nl’IGM-Bnut Piston rod tightening
Washer
Upper bushing
(A)Bracket assembly
Spring pad
Upper bushing
(8)CollarCup assembly
Dust cover
Bump rubber
Coil spring
Shock absorber
20-25 Nm1210360
SERVICE POINTS OF DISASSEMBLYN17GNAA22. REMOVAL OF PISTON ROD TIGHTENING NUT
(1) Before removing the piston rod tightening nut com-
press the coil spring using the special tools.
Caution
Do not use an air tool to tighten the bolt of the
special tool.
(2) While holding the piston rod, remove the piston rod
tightening nut.
INSPECTIONN17GOAA2l Check the rubber parts for damage.
l
Check the coil springs for crack, damage or deterioration.