ENGINE - Winder Head Gasket11-23
CYLINDER HEAD GASKETREMOVAL AND INSTALLATION
MllJA-6
Pre-removal and Post-installation Operation
Draining and Supplying
l Engine Coolant(Refer to GROUP 00 -Maintenance Service.)Removal-and Installationl Air Intake Manifold(Refer to GROUP 15 -Air intake Manifold.)l Turbocharger
10 Nm3Nm
2.2 klbs.P
~~(Refer to GROUP 13 - Engrne Control.)
10 Nm7 ft.lbs.
7 ft.lbs.\
120-nng
‘3, ;
%
;;
Water01 LO21
7
i2o-IjONmY rt.lDS.
87
- 94 ft.lbs.
76 - 83 ft.lbs.d
I. Pipe assembly
2. Blow-by hose
90
Nm3. Center cover (Front bank)
4. Spark plug cable
HI 5. Rocker cover4* l a
I
6. Intake camshaft sprocket7. Timing belt rear cover (Cent
7.----A//OlFOO218. Ignition coil9. Connection of heater hose10. Connection of water hoses
Rocker coverIOmm
410mm(.4 in.)1.4 in.)
OlA004;
Sealant: 3M ATD Part
No. 8660 or equivalent
.er)
tl-urbo>11. Connection of radiator hose
12. Thermostat housing
13. Connection of water inlet pipe** l + 14. Cylinder head assembly** 15. Cylinder head gasket
(Front bank)TSB Revision
FUEL
SYSTEM
CONTENTSM13AA- _
CRUISE CONTROL SYSTEM. . . . . . . . . . . . . . . . . . . . . . . . . . . .158SPECIFICATIONS. . . . . . . .._._....................................................155
CRUISE CONTROL SYSTEM*................................................185
SERVICE ADJUSTMENT PROCEDURES............................178
Cruise Control Cables Inspection and Adjustment........178Cruise Control SystemInspection....................................179individual Parts Inspection....................................................181
SPECIAL TOOLS........................................................................159
SPECIFICATIONS....................................................................158
General Specifications........................................................158Service Specifications........................................................158
TROUBLESHOOTING............................................................159
Check Chart............................................................................163Harness and Components Layout....................................176Preliminary Inspection........................................................159Self-diagnosis Checking........................................................172Troubleshooting Quick Reference Chart............................159
ENGINE CONTROL............................................155
ENGINE CONTROL................................................................157
SERVICE ADJUSTMENT PROCEDURES............................156
Accelerator Cable Inspection and Adjustment................156Accelerator Switch Inspection and Adjustment................156
Service Specifications........................................................
155
TROUBLESHOOTING............................................................
155
Accelerator Cable and Accelerator Pedal........................155
FUEL SYSTEM....................................................3
DETONATION SENSOR........................................................154
FUEL FILTER............................................................................
153
FUEL LINE AND VAPOR LINE................................................151
FUEL PUMP AND FUEL GAUGE UNIT ASSEMBLYAND OVERFILL LIMITER (TWO-WAY VALVE)................149
FUEL TANK.................................................................................146
GENERAL INFORMATION
....................................................
3
MPI System Diagram............................................................3
INJECTOR................................................................................141
ON-VEHICLE INSPECTION OF MPI COMPONENTS........36
Active Exhaust Control Unit
SUPPLEMENTAL RESTRAINT SYSTEM (SRS)
(1)A Supplemental Restraint System (SRS), which uses a driver-side air bag, has been installed in the 3000GT.(2)The SRS includes the following components: impact sensors, SRS diagnosis unit: SRS warning light, air bagmodule, clock spring, interconnecting wiring. Other SRS-related components (that may have to be
removed/installed in connection with SRS service or maintenance) are indicated in the table of contents byan asterisk (*).
WARNING!(I)Improper service or maintenance of any component of the SRS, or any SRS-related component, can lead to
personal injury or death to service personnel (from inadvertent firing of the air bag) or to the driver (from
rendering the SRS inoperative).
(2) Service or maintenance of any SRS component or SRS-related component must be performed only at anauthorized MITSUBISHI dealer.
(3) MITSUBISHI dealer personnel must thoroughly review this manual, and especially its GROUP
528 -Supplemental Restraint System (SRS), before beginning any service or maintenance of any component of theSRS or any SRS-related component.
FUEL SYSTEM - Injector13-141
INJECTOR
LREMOVAL AND INSTALLATION
!
MlBSA-A
/
LPre-removal Operation
l Draining of the Coolant
(Refer to GROUP 00
- Maintenance Service.)
l Removal of Air Intake Plenum
(Refer to GROUP
15-Air Intake Plenum,)
l Release of Residual Pressure from High
Pressure Hose.
(Refer to P.13-137.)
5Nm
4
WbsPost-installation Operation
l Supplying of Coolant
(Refer to GROUP 00- Maintenance Service.)
l Installation of Air intake Plenum
(Refer to GROUP 15 -Air Intake Plenum.)
l Checking for Fuel Leakage
03FOO17
Removal steps
l * l *1. Connection of high pressure fuel hose
2. Connection of fuel return hose
3. Connection of vacuum hose
l *4. Fuel pressure regulator
5. Connection of control harness
6. Fuel pipe
7. Delivery pipe8. Insulator
9. Injector support*+ IO. Injector11. Insulator12. O-ring13. Grommet
:m
*:”
-aI : %~’.1X.-10p$
y&,*,,A200A0005
0-hng4O-ring
03N001203FOO18
TSB Revision
FUEL SYSTEM - Throttle Body13-143Pre-removal and Post-installation Operation
l Draining and Supplying of Engine Coolant
(Refer to GROUP 00 -Maintenance Service.)
3
THROTTLE BODY
I
idREMOVAL AND INSTALLATION
MIOSA-0
3\
OlFOOO4
NOTEThe layout of vacuum hoses (No. 3) of the constris for the DOHC (Non Turbo) - Federal.
OlFOO53
I drawing
Removal sl
+*1.Connection of accelerator cable2.Connection of air intake hose3. Connection of vacuum hose
4. Connection of TPS connector
5. Connection of
ISC motor connec6. Connedion of water hose
7. Vacuum pipe assembly
8.ThrottlebodyI)*9.Gasket
:eps
:tor
PrelectionThrottle bodySERVICE POINTS OF INSTALLATIONMlBSDAW9. INSTALLATION OF GASKET
Install the gasket so that the projection is where shown in
the illustration.
CautionPoor idling etc. may result if the gasket is installed
incorrectly.
1. ACCELERATOR CABLE ADJUSTMENTFor information concerning adjustment of the accelerator
cable, refer to
P.13-156.
TSB Revision
COOLING - Service Adiustment Procedures.14-7
SERVICE ADJUSTMENT PROCEDURES
ENGINE COOLANT LEAK CHECKMl4FAAF
1. Loosen cap.
2.Confirm that the engine coolant level is up to the filler neck.
3.Install an adapter to the water outlet fitting and apply 160
kPa (23 psi) pressure. Hold pressure for two minutes, while
checking for leakage from the radiator, hose or connec-
tions.
CautionBe sure to completely clean away any moisture from
the places checked.
When the tester is removed, be careful not to spill anyengine coolant from it.
Be careful, when installing and removing the tester andwhen testing, not to deform the water outlet fitting.
4. If there is leakage, repair or replace the appropriate part.
CAP PRESSURE TESTM14FBAH1. Use a special tool to attach the cap to the tester.
2.Increase the pressure until the indicator of the gauge stops
moving.
Limit: 65
kPa (9.2 psi)
Standard value: 75
- 105 kPa (11 - 15 psi)
3:Replace the cap if the reading does not remain at or above
the limit.
NOTEBe sure that the cap is clean before testing, since rust or
other foreign material on the cap seal will cause an
improper indication.
ENGINE COOLANT REPLACEMENTM14FCAGRefer to GROUP 00
- Maintenance Service.
ENGINE COOLANT CONCENTRATION TEST
M14FDALRefer to GROUP 00
- Selection of Coolant.
1 TSB Revision
COOLING - Thermostat14-11
THERMOSTATMlbGB- -
iREMOVAL AND INSTALLATION
L
Pre-removal and Post-installation
l Draining and Supplying of the
(Refer to GROUP 00
- Maintenance
Removal steps
1. Air hose A
3. Air intake hose
4. Connection of radiator lower hose
5. Water inlet fitting
6. Gasketl a 7. Thermostat
OlFOO37
7cooo43l
Fullyclosed j
04N0004
INSPECTIONM14GDALl Check that valve closes tightly at room temperature.
l Check for defects or damage.
l Check for rust or encrustation on valve. Remove if any.
l Immerse thermostat in container of water. Stir to raise
water temperature and check that thermostat opening
valve temperature and the temperature with valve fully
open [valve lift-over
10 mm (39 in.)] are at the standard
value.
Standard value:
Opening valve temperature
Full-open temperature
NOTE76.5%
(‘170°F)
90°C ( 194°F)Measure valve height when fully closed. Calculate lift by
measuring the height when fully open.
-
TSB Revision
COOLING - Water Pump, Water Pipe and Water Hose
WATER PUMP, WATER PIPE AND WATER HOSE
14-13
M14MB-B
/REMOVAL AND INSTALLATION
Pre-removal and Post-installation
Operation
l Draining and Supplying of the Engine Coolant
(Refer to GROUP 00 - Maintenance Service.)l Removal and Installation of Power Transistor
Unit and Ignition Coil
(Refer to GROUP 16 - Engine Electrical)l Removal and lnstallatlon of Timing Belt
(Refer to GROUP 11 -Timing Belt)17-20 Nm17-20 Nm
12-14ft.lbs.
1
12-15Nm9-11 ft.1bs.q
Removal steps
1. Water pump
2. Gasket
3. Air hose A
4. Air intake hose A
5. Air intake hose B
6. Air intake hose C
7. Air intake hose
8. Connection of radiator upper hose
9. Connection of water hose
IO. Water outlet fitting11. Gasket
12. Connection of harness
13. Connection of heater hose
14. Connection of water hose A
15. Connection of water hose
16. Connection of water hose
17. Connection of radiator lower hose
18. Connection of water hose
19. Thermostat housing
20. Gasket21.
Her water pipe22. O-ringOlFOO51
Installation steps
2. Gasket** 1. Water pumpI)+ 22. O-ring
l * 21. Inlet water pipe
20. Gasket
19. Thermostat housing18. Connection of water hose
15. Connection of water hose
14. Connection of water hose A
13. Connection of heater h&e
12. Connection of harness11. Gasket10. Water outlet fitting
9. Connection of water hose
8. Connection of radiator upper hose7. Air intake hose
3. Air hose A
TSB Revision
COOLINGEngine Coolant Temperature Gauge Unit, Engine Coolant- Temperature Sensor and Engine Coolant Temperature Switch14-15
ENGINE COOLANT TEMPERATURE GAUGE UNIT, ENGINE COOLANT
TEMPERATURE SENSOR AND ENGINE COOLANT TEMPERATURE
L,SWITCH
REMOVAL AND INSTALLATIONM140B. -Pre-removal and Post-installation
Operation
l Draining and Supplying of theEngine Coolant(Refer to GROUP 00 - MaintenanceService.)
30 NmOlFOO38
Removal steps
1. Air hose A
4. Connection of radiator upper hose
5. Engine coolant temperature gauge unit
6. Engine coolant temperature sensor
(Engine control)7. Engine coolant temperature switch(Air conditioner)
INSPECTIONM140DAM
ENGINE COOLANT TEMPERATURE GAUGE UNITRefer to GROUP 54
- Meters and Gauges.
ENGINE COOLANT TEMPERATURE SENSOR (Engine con-
trol)Refer to GROUP 13
- MPI System Inspection.
TSB Revision