1967 CHEVROLET CAMARO engine

[x] Cancel search: engine

Page 79 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-56

BLACK & RED

IGNITION—-y^****

SWITCH -"A

/<J 7

BLOWER LEAD—^^^

RESISTOR—-" \^<

ASM.
 f

i 
fu^^^^A^^^^^r"G^OUH£>
 WIRE

^^ 
k4

^EVAPORATOR HARNESS

Page 85 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-62

2.
 Insert the evaporator assembly into the outlet case

half and mount the evaporator, thermostatic switch,

and cable to the case.

3.
 Install the face plate to

Page 86 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-63

Under Dash

7. Remove ash tray and retainer, and glove box.

8. Remove blower case to air inlet adapter bracket

retaining screw.

9. Remove screw attaching air dis

Page 87 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-64

Fig.
 90—Evaporator Wiring (Corvette)

AIR INLET VALVE

Four-Season System

Chevrolet

Figure 88 illustrates the vacuum valve which controls

the air inlet operat

Page 90 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-67

Fig.
 94—Camaro Four-Season Ducts

Heater and Air Distributor Assembly

Removal

rfooo

1.
 Disconnect battery ground cable.

2.
 Drain radiator (do not purge ref

Page 91 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-68

Fig.
 95—Corvette Four-Season Ducts

5. Connect the various Comfortron harness connectors

to the dash wiring and connect the vacuum hose to

the kick pad valve d

Page 92 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-69

Fig.
 96—Refrigerant and Vacuum Hoses (Corvette)

2.
 Mount the sensor to the dash and connect the wires

to the Comfortron harness.

3.
 Replace glove box assemb

Page 96 of 659

CHEVROLET CAMARO 1967 1.G Chassis Workshop Manual 
HEATER AND AIR CONDITIONING 1A-73

Fig.
 105—Comfortron Control Head

10.
 Introduce R-12 vapor at cylinder (room) temperature

and pressure.

11.
 Leak test all fittings and connections and give p