2022 TOYOTA TUNDRA maintenance schedule

[x] Cancel search: maintenance schedule

Page 197 of 616

TOYOTA TUNDRA 2022  Owners Manual 1974-1. Before driving
4
Driving
■Break-in schedule
If  your  vehicle  is  new  or  equipped  with  any  new  power  train  com ponents
(such  as  an  engine,  transmission,  differential  or  wheel

Page 335 of 616

TOYOTA TUNDRA 2022  Owners Manual 3354-6. Driving tips
4
Driving
NOTICE
■To prevent the water damage
Take  all  necessary  safety  measures  to  ensure  that  water  damage  to  the
engine or other components does not occur.
● Wat

Page 409 of 616

TOYOTA TUNDRA 2022  Owners Manual 4096-2. Maintenance
6
Maintenance and care
Maintenance requirements
General maintenance should be performed on a daily basis. This can
be done by yourself or by a Toyota dealer.
Scheduled  maintenance

Page 410 of 616

TOYOTA TUNDRA 2022  Owners Manual 4106-2. Maintenance
■Resetting the message indicating maintenance is required (U.S.A. only)
After  the  required  maintenance  is  performed  according  to  the  ma intenance
schedule, please reset

Page 413 of 616

TOYOTA TUNDRA 2022  Owners Manual 4136-2. Maintenance
6
Maintenance and care
Vehicle exterior
ItemsCheck points
Doors• Do the doors operate smoothly?
Engine hood• Does the engine hood lock system work prop-erly?
Fluid leaks• The

Page 449 of 616

TOYOTA TUNDRA 2022  Owners Manual 4496-3. Do-it-yourself maintenance
6
Maintenance and care
Remove the filter cover.
Pull the filter out of the filter out-
let.
Remove  the  air  conditioning  filter
and replace it  with a new one.
Wh

Page 498 of 616

TOYOTA TUNDRA 2022  Owners Manual 4987-2. Steps to take in an emergency
(U.S.A. only)
Indicates  that  all  maintenance  according  to  the
driven  distance  on  the  maintenance  schedule
*
should be performed soon.
Comes  on  approx

Page 503 of 616

TOYOTA TUNDRA 2022  Owners Manual 5037-2. Steps to take in an emergency
7
When trouble arises
*1: The  buzzer  sounds  when  Multi-terrain  Select  or  active  traction  control  is
equipped.
*2: Refer to the separate “Scheduled Mai