2013 SSANGYONG KORANDO check engine

[x] Cancel search: check engine

Page 397 of 1336

SSANGYONG KORANDO 2013  Service Manual d. Bypass control for EGR cooler
1. Cooler temperature
2. Exhaust gas temperature
Otherwise, PM could be increased due to too low exhaust gas temperature.
e.  Control elements for EGR system
Accelerat

Page 411 of 1336

SSANGYONG KORANDO 2013  Service Manual Meter 
clusterImmobilizer 
antenna
Immobilizer key
Start motor
BCM
ECU
D20DTF
(10) Immobilizer control
a. Overview
The Immobilizer System provides an additional theft deterrent to the vehicle in which

Page 412 of 1336

SSANGYONG KORANDO 2013  Service Manual 0000-00
Key approval process
When turning the ignition switch to ON position, the power is supplied to BCM and ECU. ECU 
communicate with the immobilizer key to check if it is valid crypto code. If it

Page 414 of 1336

SSANGYONG KORANDO 2013  Service Manual 0000-00
Key approval process in Smart key system equipped vehicle
The key approval consists of two processes; immobilizer key approval and Smart key 
approval.
Immobilizer key approval: When inserting

Page 426 of 1336

SSANGYONG KORANDO 2013  Service Manual 0000-00
3) General Instructions
Before lifting up the vehicle with a lift, correctly support the lifting points.
When using a jack, park the vehicle on a level ground and place the wheel chocks under

Page 427 of 1336

SSANGYONG KORANDO 2013  Service Manual 4) Basic Inspection
(1) Horn operation
Listen for the horn sound when pressing the horn pad on the steering wheel. -
(2) Brake operation
Check if there is any abnormal noise, unusually long braking di

Page 428 of 1336

SSANGYONG KORANDO 2013  Service Manual 0000-00
5) Guidelines on Engine Service
(1) Cautions before service works
Make sure to disconnect the negative (-) cable from the battery to prevent any damage to electric 
systems.
Make sure to clean

Page 440 of 1336

SSANGYONG KORANDO 2013  Service Manual 1116-01
Engine and accessories
Engine has a lot of precise components. The specified tightening torque and correct procedures should 
be kept during service works. And, the working area is always clea