2012 CITROEN RELAY display

[x] Cancel search: display

Page 20 of 182

CITROEN RELAY 2012  Handbook (in English) 18
ECO-DRIVING
  Eco-driving is a range of everyday practices that allow the motorist to optimise their fuel consumption and CO2 emissions. 
 
 
Optimise the use of your gearbox
 
 
With a manual gear

Page 30 of 182

CITROEN RELAY 2012  Handbook (in English) 28
   
 
Instruments and controls  
 
 
INSTRUMENT PANEL
 
 
 
1. 
  Distance recorder in miles/kilometres. 
   
2. 
 Screen. 
   
3. 
  Dials and gauges. 
   
4. 
 Rev counter.  
 
INSTRUMENTS AND CO

Page 37 of 182

CITROEN RELAY 2012  Handbook (in English) 35
2
READY TO G
O
Instruments and controls
   
Screen    
displays    
indicates    
Solution - action  
  Temperature / 
Ice   the ice warning, 
the temperature 
flashing 
accompanied by 
a message o

Page 39 of 182

CITROEN RELAY 2012  Handbook (in English) 37
2
READY TO G
O
Instruments and controls
SERVICE INDICATOR
  For a few seconds after the ignition is switched 
on, the spanner symbolising the service 
indicator comes on: the screen informs you 
wh

Page 48 of 182

CITROEN RELAY 2012  Handbook (in English) 46
Steering mounted controls
  CRUISE CONTROL
 
 "This is the speed at which the driver wishes to 
travel". 
  This aid to driving in free-fl owing traffi c conditions 
enables the vehicle to mainta

Page 55 of 182

CITROEN RELAY 2012  Handbook (in English) 53
3
EASE OF USE
and
 COMFOR
T
Ventilation
MONO-ZONE DIGITAL AIRCONDITIONING
  If your vehicle is fitted with this system, the 
controls are located in the middle of the 
dashboard. The system can be

Page 59 of 182

CITROEN RELAY 2012  Handbook (in English) 3
EASE OF USE
and
 COMFOR
T
Ventilation
PROGRAMMABLE ADDITIONAL HEATING
  If your vehicle is fitted with separate 
programmable heating: it gradually brings 
the engine up to a good temperature to 
fa

Page 60 of 182

CITROEN RELAY 2012  Handbook (in English) 58
   
 Ventilation 
 
 
Setting the time of the internal clock 
 
Set the clock on the control panel before 
programming the deferred switching on of 
the heating. 
Immediate switching on of the heat
Page:   1-8 9-16 17-24 25-32 32 next >