Wipers and Washer System (01.16)
Body System (01.00)
Issue 4, November, 2008 Workshop Manual 1-11-5
11. Connect the two clips that attach the battery harness to the bottom of the reservoir.
12. PPut the wheelarch liner back into position.
13. Turn the steering to the centre position.
14. Install the self-tapping screw that attaches the rear of the wheelarch liner into the wheelarch.
15. Install the five or six M6 Torx-head screws that attach
the rear of the wheelarch liner.
16. Install the front right roadwheel.
17. On Roadster vehicles, in stall the centre undertray.
18. Lower the vehicle.
19. Fill the washer reservoir.
Headlamp Wash Motor and Pump
Assembly - Renew
Removal
1. Raise the vehicle and make it safe.
2. On Roadster vehicles, re move the centre undertray.
3. Remove the front right roadwheel.
4. Remove the five or six M6 Torx-head screws that attach the rear of the wheelarch liner.
5. Remove the self-tapping screw that attaches the rear of the wheelarch liner into the wheelarch.
6. Turn the steering fully to the right.
7. Move the rear of the wheela rch liner away to get access
to the windscreen reservoir.
8. Disconnect the windscreen washer pipe and drain the reservoir into an applicable container.
9. Disconnect the two clipsthat attach the battery harness to the bottom of the reservoir. Move the harness away.
10. Disconnect the clip that attaches the harness for the
level sensor to the reservoir.
11. Remove the rear-lower reservoir fixing.
12. Lower the vehicle on the lift.
13. Disconnect the electrical connector for the windscreen
washer motor.
14. Release the headlamp washer pipe and turn the motor to disconnect the pipe (quickfit) and the electrical
connector.
15. Release the windscreen washer pipe from the reservoir.
16. Remove the two reservoir attachment screws.
17. Let the reservoir fall, then release the filler tube from the clip.
18. Move the reservoir down and forward to give access.
19. Disconnect the electrical co nnector for the level sensor.
20. Remove the headlamp washer motor, seal and support clip from reservoir.
Installation
1. Install the headlamp washer motor, seal and support clip into the reservoir.
2. Connect the electrical connector for the level sensor.
3. Move the reservoir into position.
4. Connect the filler pipe and install the clip.
5. Install the three attachment screws.
6. Clip the windscreen washer pipe into reservoir and connect it to the motor.
7. Install the headlamp washer pipe in position. Connect
the pipe (quickfit) and the electrical connector.
8. Connect the electrical connector for the windscreen washer motor.
9. Raise ramp.
10. Connect the clip that attaches the level sensor harness to the reservoir.
11. Connect the two clips that attach the battery harness to the bottom of the reservoir.
12. Put the wheelarch liner back into position.
13. Turn the steering to the centre position.
14. Install the self-tapping screw that attaches the rear of the wheelarch liner into the wheelarch.
15. Install the five or six M6 Torx-head screws that attach the rear of the wheelarch liner.
16. Install the front right roadwheel.
17. On Roadster vehicles, install the centre undertray.
18. lower the vehicle.
19. Fill washer reservoir.
Headlamp Wash Tube Assembly - Renew
Removal
1. Remove LH headlamp (see Workshop Manual procedure 17.01.AB Headlamp Assembly - LH -
Renew).
2. Remove RH headlamp (see Workshop Manual procedure 17.01.BB Headlamp Assembly - RH -
Renew).
3. Place container to catch fluid.
Repair Operation Time (ROT)
Repair Operation Time (ROT)
Wipers and Washer System (01.16)
Body System (01.00)1-11-6 Workshop Manual Issue 4,November, 2008
4. Remove tube from motor (quickfit) and reservoir (see Figure 1).
5. Remove tube from body (c lips x2) (see Figure 2).
6. Lower ramp.
7. Open hood.
8. Remove slam panel. 9. Remove tube from clips (x9) and remove tube from
vehicle (see Figure 3).
Installation
1. Install tube to vehicle and clips.
2. Install slam panel.
3. Close hood.
4. Raise ramp.
5. Install tube to body (clips x2).
6. Install tube to motor (quickfit) and reservoir.
7. Install LH headlamp (see Workshop Manual procedure 17.01.AB Headlamp As sembly - LH - Renew).
8. Install RH headlamp (see Workshop Manual procedure
17.01.BB Headlamp Assembly - RH - Renew).
9. Remove container and refill reservoir.
10. Adjust jets spray.
Washer Fluid Reservoir - Renew
Removal
1. Remove RH wheel arch liner (see Workshop Manual procedure 01.02.GB Wheel Arch Liner - Front - RH -
Renew).
2. Disconnect Windscreen wash er pipe to drain reservoir
into suitable container.
3. Disconnect clips (x2) securing battery harness to bottom of reservoir (move aside).
4. Disconnect clip (x1) securi ng level sensor harness to
reservoir.
5. Remove rear lower reservoir fixing.
6. Lower ramp.
7. Disconnect windscreen washer motor multiplug.
8. Unclip Headlamp washer pipe and turn motor to disconnect pipe (quickfit) and multiplug.
9. Unclip windscreen washer pipe from reservoir.
Figure 1
Figure 2
A0116179
A0116189
Figure 3
Repair Operation Time (ROT)
ItemCode
Washer Fluid Reservoir-Renew 01.16.FB
A0116190
Wipers and Washer System (01.16)
Body System (01.00)
Issue 4, November, 2008 Workshop Manual 1-11-7
10. Remove reservoir retaining screws (x2).
11. Allow reservoir to drop, then disconnect filler tube (clip
x1).
12. Manoeuvre reservoir down and forward to access, disconnect level sensor multiplug.
13. Remove level sensor an d seal from reservoir.
14. Remove windscreen washer motor and seal from reservoir.
15. Remove headlamp washer motor and seal and support clip from reservoir.
Installation
1. Install headlamp Washer motor and seal and support clip to reservoir.
2. Install windscreen washer motor and seal to reservoir.
3. Install level sensor and seal to reservoir.
4. Connect level sensor multip lug and manoeuvre reservoir
into position.
5. Connect filler pipe (clip x1).
6. Install fixing screws (x3).
7. Clip windscreen washer pipe into reservoir and install to motor.
8. Clip headlamp washer pipe, connect pipe (quickfit) and
multiplug.
9. Connect windscreen washer motor multiplug.
10. Raise ramp.
11. Connect clip (x1) securi ng level sensor harness to
reservoir.
12. Connect clips (x2) securing battery harness to bottom of reservoir.
13. Remove RH wheel arch liner (see Workshop Manual procedure 01.02.GB Wheel Arch Liner - Front - RH -
Renew).
14. Fill washer reservoir.
Convertible Roof (01.17)
Body System (01.00)1-12-2 Workshop Manual May 2007
Maintenance
Hood Assembly-Renew
Removal
1. Remove Tonneau well liner (see Workshop Manual procedure 01.17.DB Tonneau Well Liner - Renew).
2. Remove Panel assembly body side LH (see Workshop
Manual procedure 01.05.DY Panel Assembly - Bodyside
Trim - Rear - LH - Renew).
3. Remove Panel assembly body side RH (see Workshop Manual procedure 01.05.DX Panel Assembly - Bodyside
Trim - Rear - RH - Renew).
4. Remove Tonneau cover (see Workshop Manual procedure 01.17.CA Cover - Tonneau - Renew).
5. Disconnect vehicle battery. 6. Release both tonneau cylinders lower retaining clips and
disconnect cylinders from body (see Figure 1).
7. Remove tonneau cylinder pivot bracket from body (bolts x3) (see Figure 2).
WAR NI NG
MANY OF THE FOLLOWING PROCEDURES ADVISE
OPERATING THE ROOF TO THE HALFWAY POSITION.
WHEN THE OPERATION OF THE ROOF IS STOPPED
MID-CYCLE, WITH THE TO NNEAU UP, ANY LOSS OF
POWER (I.E. REMOVING THE VEHICLE KEY OR AFTER
10 MINUTES OF IDLE) WILL RESULT IN THE
HYDRAULIC PRESSURE DROPPING AND MAY CAUSE
A CLASH SCENARIO.
WHEN ADVISED TO OPEN THE ROOF TO THE
HALFWAY POSITION, ALWA YS SECURE THE ROOF
WITH STRAPS AND PROPS (AS ADVISED). SHOULD
THE ROOF CLASH AND THEN POWER BE RETURNED
TO THE VEHICLE SEVERE DAMAGE TO THE ROOF
WILL RESULT.
TO RECTIFY THE ‘CLASH’ SCENARIO FOLLOW THE
PROCEDURE BELOW:
1. ENSURE IGNITION IS OFF AND REMOVE KEY.
2. MANUALLY RAISE TONNEAU LID.
3. WHILST TONNEAU IS RAISED, FULLY RETRACT
ROOF ALLOWING IT TO SETTLE BACK INTO
TONNEAU WELL.
4. ENSURE LID CLEARS TONNEAU STRIKERS DURING
MOVEMENT.
5. CLOSE TONNEAU LID (ALLOW TO DROP UNDER
OWN WEIGHT).
6. ONCE TONNEAU IS CLOSED TURN ON IGNITION
AND FULLY RETRACT ROOF INTO TONNEAU WELL
AND LATCH TONNEAU.
7. ONCE MOVEMENT IS COMPLETED AND HOOD IS
STOWED FULL FUNCTIONALITY IS RESTORED.
Repair Operation Time (ROT)
Figure 1
Figure 2
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-5
19. Release harness/pipe retaining clips (x3) RH side (see Figure 11).
20. Release velcro from bracket and feed harness/pipes under bracket into tonneau area.
21. Tie harness/pipes and tonneau cylinders to roof to ease removal.
22. Mark roof fitted position to body, support weight of roof and remove securing bolts (x6).
23. Lift roof approximately 10mm then using assistance
supporting pump unit, manoeuvre roof towards luggage
compartment past B-posts.
24. When roof is clear of B-post s, lift roof to clear luggage
compartment lid and remove roof from vehicle.
Installation
1. Manoeuvre roof to fitted position on body and install securing bolts (torque)
2. Remove lifting equipment.
3. Untie harness/pipes and tonneau cylinders from roof and layout in approximately fitted position.
4. Feed harness/pipes under bracket into luggage compartment and secure bracket.
5. Secure harness/pipe retaining clips (x3) RH side.
6. Secure harness/pipe retaining clips (x7) behind ROPS units.
7. Secure harness/pipe retaining clips (x2).
8. Feed multiplugs through from tonneau area and connect.
9. Secure harness/pipe retaining clips (x3).
10. Disconnect multiplug.
11. Feed multiplug through from tonneau area, connect and secure to body.
12. Install cylinders to B-post.
13. Install valve to support bracket, reposition bracket.
14. Install cable tie securing valve to bracket. Ensure no pipes or wiring will foul roof mechanism. 15. Install motor and casing under tonneau onto location
posts.
16. Install cylinder pivot bracket to body.
17. Install tonneau cylinders to body.
18. Connect vehicle battery.
19. Install Tonneau cover (see Workshop Manual procedure 01.17.CA Cover - Tonneau - Renew).
20. Operate roof from fully open to fully closed. Check operation of roof for correct latching, seal fit, fouling of
pipes and harnesses and oil leakage. Carry out
adjustments as necessary.
21. Install Panel assembly bo dy side LH (see Workshop
Manual procedure 01.05.DY Panel Assembly - Bodyside
Trim - Rear - LH - Renew).
22. Install Panel assembly body side RH (see Workshop Manual procedure 01.05.DX Pa nel Assembly - Bodyside
Trim - Rear - RH - Renew).
23. Install Tonneau well line r (see Workshop Manual
procedure 01.17.DB Tonneau Well Liner - Renew).
24. Perform water leakage test on roof (see Workshop Manual procedure 01.17.XX Water Test).
Canopy Cover - Renew
Removal
1. Remove headlining (see Workshop Manual procedure
01.05.BA Headlining - Renew).
2. Position hood to gain access to rivets (x6) securing B- post seal to hood.
3. Drill out rivets (x6) secu ring B-post seal to hood
mechanism and release seal (see Figure 1).
Figure 11
Repair Operation Time (ROT)
Convertible Roof (01.17)
Body System (01.00)1-12-30 Workshop Manual May 2007
suitable straps and support tonneau cover with suitable
prop (see Figure 1).
2. Remove panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter
Trim Lower - RH - Renew).
3. Disconnect battery.
4. Cut cable ties securing pipes and wires to cylinder (see Figure 2).
5. Release clips securing pipes to cylinder and disconnect pipes. 6. Release fir tree clip and cable
tie securing both pipes to
roof frame (remove pipes as pair).
7. Attach string to cylinder end of both pipes to aid
installation.
8. Feed pipes through to tonneau area by carefully guiding through roof mechanism and release string (see Figure
3).
9. Remove harness/pipe reta ining clips (x2) (LH) (see
Figure 4).
WAR NI NG
APPROXIMATELY 20 SECONDS AFTER THE OPEN/
CLOSE OPERATION HAS BEEN INTERRUPTED THE
ROOF MAY SUDDENLY DROP DUE TO LOSS OF
HYDRAULIC PRESSURE. IF THIS HAPPENS ENSURE NO
BODY PARTS ARE CLOSE TO THE ROOF MECHANISM.
IF THE ROOF REQUIRES MAINTENANCE, SUPPORT PROPERLY USING SUITABLE PROPS AND STRAPS.
Figure 1
Figure 2
Figure 3
Figure 4
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-33
small quantity of oil replace plug and re-check level (see
Figure 1).
2. Install pipe to approximate route on vehicle and install cable ties.
3. Clean pipe and install pipe to pump then slide retaining plate into place and tighten screws (pipes and locations
are numbered).
4. Install pump casing and secure velcro.
5. Install pump and casing under tonneau onto location posts.
6. Install cylinder pivot bracket and connect cylinder to bracket.
7. Move tonneau well liner ar ound lower cylinder fixing
and pump casing and secure velcro.
8. Install trim clip and position tonneau lining stiffening rod.
9. Install harness/pipe retaining clips (x9) behind ROPS units.
10. Install harness/pipe re taining clips LH (x2).
11. Install harness/pipe re taining clips RH (x3).
12. Attach pipes to guide stri ng, feed pipes through roof
frame and remove string.
13. Position pipes to cylinder and secure with clips.
14. Secure pipes and wires to cylinder with cable tie.
15. Install new clips securi ng pipes to roof frame.
16. Connect battery.
17. Install Panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter Trim
Lower - RH - Renew).
18. Restore roof and tonneau to original position.LH Rear Main Hydraulic Cylinder Pipe -
Renew
Removal
1. Operate roof to halfway position with tonneau open and support roof when hydraulic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1).
2. Remove panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter
Trim Lower - RH - Renew).
3. Disconnect battery.
Figure 1
Repair Operation Time (ROT)
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-37
7. Move tonneau well liner ar ound lower cylinder fixing
and pump casing and secure velcro.
8. Install trim clip and position tonneau lining stiffening rod.
9. Install harness/pipe retaining clips (x9) behind ROPS units.
10. Install harness/pipe re taining clips LH (x2).
11. Install harness/pipe re taining clips RH (x3).
12. Attach pipes to guide stri ng, feed pipes through roof
frame and remove string.
13. Position pipes to cylinder and secure with clips.
14. Secure pipes and wires to cylinder with cable tie.
15. Install new clips securi ng pipes to roof frame.
16. Connect battery.
17. Install Panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter Trim
Lower - RH - Renew).
18. Restore roof and tonneau to original position
RH Front Main Hydraulic Cylinder Pipe -
Renew
Removal
1. Operate roof to halfway position with tonneau open and support roof when hydraulic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1). 2. Remove panel quarter trim lower (see Workshop
Manual procedure 01.05.CR Panel Assembly - Quarter
Trim Lower - RH - Renew).
3. Disconnect battery.
4. Cut cable ties securing pipes and wires to cylinder (see Figure 2).
5. Release clips securing pipes to cylinder and disconnect pipes.
6. Release fir tree clip and cable tie securing both pipes to roof frame (remove pipes as pair).
7. Attach string to cylinder end of both pipes to aid
installation.
Repair Operation Time (ROT)
Figure 1
Figure 2