Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-9
20. Secure canopy straps to third cross bar using screws.
21. Position hood to gain access to B-post seal fixings.
22. Remove self tapping screws and secure B-post seal to hood mechanism using rivets starting with the lowest
hole first.
23. Restore roof to original position, raise door glass and
check alignment of front seals.
24. Install headlining (see Workshop Manual procedure
01.05.BA Headlining - Renew).
25. Check operation and fit of hood.
Header Latch Motor - Renew
Removal
1. Remove left-hand header latch flex shaft (see Workshop Manual procedure 01.17.EF Flex Shaft - LH - Renew).
2. Remove right-hand header latch flex shaft (see Workshop Manual procedure 01.17.EG Flex Shaft - RH
- Renew).
3. Cut 2 cable ties securing wiring harness to motor mounting bracket (see Figure 1).
4. Disconnect 2 motor multiplugs.
5. Remove 4 nuts securing motor mounting bracket to roof.
6. Remove motor from studs.
Installation
1. Ensure header motor and latch are in fully open position prior to installation.
2. Install motor and tighten nuts to 8 Nm.
3. Connect motor multiplugs.
4. Secure wiring harness to motor mounting bracket with cable ties. 5. Install right-hand header la
tch flex shaft (see Workshop
Manual procedure 01.17.EG Flex Shaft - RH - Renew).
6. Install left-hand header latc h flex shaft (see Workshop
Manual procedure 01.17.EF Flex Shaft - LH - Renew).
Hydraulic Main Actuator Cylinder -
Renew
Removal
1. Remove panel quarter trim lower (see Workshop
Manual procedure 01.05.CR/01.05.CS Panel Assembly -
Quarter trim Lower - RH - Renew).
2. Release cylinder lower retaining clip and disconnect cylinder from B-post (see Figure 1).
Repair Operation Time (ROT)
Repair Operation Time (ROT)
Convertible Roof (01.17)
Body System (01.00)1-12-10 Workshop Manual May 2007
3. Release cylinder lower retaining clip and disconnect cylinder from roof mechanism (see Figure 2).
4. Lower cylinder to access pipes and switches.
5. Cut cable ties securing pipes and wires to cylinder (see Figure 3).
6. Release clips securing pipes to cylinder and disconnect pipes.
7. Release clips securing hall effect sensors to cylinder,
disconnect sensors and remove cylinder.
Installation
1. Position sensors to cylind er and secure with clips.
2. Position pipes to cylinder and secure with clips.
3. Secure pipes and wires to cylinder with cable tie.
4. Move cylinder into position and install cylinder to roof
mechanism.
5. Install cylinder to B-post. 6. Install panel quarter trim lower (see Workshop Manual
procedure 01.05.CR/01.05.CS Panel Assembly -
Quarter Trim Lower - RH - Renew).
Hydraulic Tensrod Cylinder - Renew
Removal
1. Operate roof to halfway position with tonneau open and support roof when hydraulic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1).
Figure 2
Figure 3
Repair Operation Time (ROT)
ItemCode
Hydraulic Tensrod Cylinder-Renew LH01.17.AJ
Hydraulic Tensrod Cylinder-Renew RH01.17.AK
WAR NI NG
APPROXIMATELY 20 SECONDS AFTER THE OPEN/
CLOSE OPERATION HAS BEEN INTERRUPTED THE
ROOF MAY SUDDENLY DROP DUE TO LOSS OF
HYDRAULIC PRESSURE. IF THIS HAPPENS ENSURE NO
BODY PARTS ARE CLOSE TO THE ROOF MECHANISM.
IF THE ROOF REQUIRES MAINTENANCE, SUPPORT
PROPERLY USING SUITABLE PROPS AND STRAPS.
Figure 1
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-21
9. Release water pocket from seal, remove rear seal assembly (see Figure 5).
Installation
1. Insert long straight leg of seal carrier into B-post seal
towards joint with tension bo w (ensure seal anchors are
wrapped around carrier - both sides).
2. Slide carrier to end of seal (ensure carrier is tightly fitted
against seal, including corners - both sides).
3. Press seal over full length of carrier (ensure seal inner
top anchor and seal lower anchors are fully engaged
with carrier - both sides).
4. Check ends of seal are flush with ends of carrier (both sides).
5. Fully roll seal top anchor lip onto carrier (ensure any gaps between seal and carrier are at open end of seal -
both sides).
6. Affix (super glue) whole length of seal top anchor lip to carrier (both sides).
7. At each end of the tension bow seal, measure 135mm from the end of the Velcro and mark with black pen.
8. Insert each end of seal retainer into seal at black pen marks.
9. Align seal evenly along retainer, fully push fit home centre of seal onto retainer.
10. Working outwards from cent re position, fully push fit
home seal onto retainer.
11. Working inwards from ends, fully push fit home seal onto retainer.
12. Position seal assembly across tonneau and rear quarters.
13. Insert water pockets to seal, place a drop of super glue at each end of water pockets.
14. Crimp seal to secure water pocket in place.
15. Secure seal assembly to B-posts with pop-rivets, starting with lower rivet.
16. Align and install B-post trims, secure with bolts. 17. Install LH cant rail tr
ims (see Workshop Manual
procedure 01.17.BT Cover - Trim - Cantrail - Renew).
18. Install RH cant rail trims (see Workshop Manual procedure 01.17.BT Cover - Trim - Cantrail - Renew).
19. Align and install seal asse mbly to tension bow, ensure
brackets and spring clips are correctly positioned, secure
with screws.
LH Fully Automatic Latching Kit - Renew
Removal
1. Remove left-hand header latch flex shaft (see Workshop Manual procedure 01.17.EF Flex Shaft - LH - Renew).
2. Mark mounting position of latching kit (see Figure 1).
3. Remove 3 nuts and 1 screw securing latching kit to roof.
Figure 5
Repair Operation Time (ROT)
Convertible Roof (01.17)
Body System (01.00)1-12-30 Workshop Manual May 2007
suitable straps and support tonneau cover with suitable
prop (see Figure 1).
2. Remove panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter
Trim Lower - RH - Renew).
3. Disconnect battery.
4. Cut cable ties securing pipes and wires to cylinder (see Figure 2).
5. Release clips securing pipes to cylinder and disconnect pipes. 6. Release fir tree clip and cable
tie securing both pipes to
roof frame (remove pipes as pair).
7. Attach string to cylinder end of both pipes to aid
installation.
8. Feed pipes through to tonneau area by carefully guiding through roof mechanism and release string (see Figure
3).
9. Remove harness/pipe reta ining clips (x2) (LH) (see
Figure 4).
WAR NI NG
APPROXIMATELY 20 SECONDS AFTER THE OPEN/
CLOSE OPERATION HAS BEEN INTERRUPTED THE
ROOF MAY SUDDENLY DROP DUE TO LOSS OF
HYDRAULIC PRESSURE. IF THIS HAPPENS ENSURE NO
BODY PARTS ARE CLOSE TO THE ROOF MECHANISM.
IF THE ROOF REQUIRES MAINTENANCE, SUPPORT PROPERLY USING SUITABLE PROPS AND STRAPS.
Figure 1
Figure 2
Figure 3
Figure 4
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-33
small quantity of oil replace plug and re-check level (see
Figure 1).
2. Install pipe to approximate route on vehicle and install cable ties.
3. Clean pipe and install pipe to pump then slide retaining plate into place and tighten screws (pipes and locations
are numbered).
4. Install pump casing and secure velcro.
5. Install pump and casing under tonneau onto location posts.
6. Install cylinder pivot bracket and connect cylinder to bracket.
7. Move tonneau well liner ar ound lower cylinder fixing
and pump casing and secure velcro.
8. Install trim clip and position tonneau lining stiffening rod.
9. Install harness/pipe retaining clips (x9) behind ROPS units.
10. Install harness/pipe re taining clips LH (x2).
11. Install harness/pipe re taining clips RH (x3).
12. Attach pipes to guide stri ng, feed pipes through roof
frame and remove string.
13. Position pipes to cylinder and secure with clips.
14. Secure pipes and wires to cylinder with cable tie.
15. Install new clips securi ng pipes to roof frame.
16. Connect battery.
17. Install Panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter Trim
Lower - RH - Renew).
18. Restore roof and tonneau to original position.LH Rear Main Hydraulic Cylinder Pipe -
Renew
Removal
1. Operate roof to halfway position with tonneau open and support roof when hydraulic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1).
2. Remove panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter
Trim Lower - RH - Renew).
3. Disconnect battery.
Figure 1
Repair Operation Time (ROT)
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-37
7. Move tonneau well liner ar ound lower cylinder fixing
and pump casing and secure velcro.
8. Install trim clip and position tonneau lining stiffening rod.
9. Install harness/pipe retaining clips (x9) behind ROPS units.
10. Install harness/pipe re taining clips LH (x2).
11. Install harness/pipe re taining clips RH (x3).
12. Attach pipes to guide stri ng, feed pipes through roof
frame and remove string.
13. Position pipes to cylinder and secure with clips.
14. Secure pipes and wires to cylinder with cable tie.
15. Install new clips securi ng pipes to roof frame.
16. Connect battery.
17. Install Panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter Trim
Lower - RH - Renew).
18. Restore roof and tonneau to original position
RH Front Main Hydraulic Cylinder Pipe -
Renew
Removal
1. Operate roof to halfway position with tonneau open and support roof when hydraulic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1). 2. Remove panel quarter trim lower (see Workshop
Manual procedure 01.05.CR Panel Assembly - Quarter
Trim Lower - RH - Renew).
3. Disconnect battery.
4. Cut cable ties securing pipes and wires to cylinder (see Figure 2).
5. Release clips securing pipes to cylinder and disconnect pipes.
6. Release fir tree clip and cable tie securing both pipes to roof frame (remove pipes as pair).
7. Attach string to cylinder end of both pipes to aid
installation.
Repair Operation Time (ROT)
Figure 1
Figure 2
Convertible Roof (01.17)
Body System (01.00)1-12-40 Workshop Manual May 2007
7. Move tonneau well liner arou nd lower cylinder fixing
and pump casing and secure velcro
8. Install trim clip and positi on tonneau lining stiffening
rod.
9. Attach pipes to guide stri ng, feed pipes through roof
frame and remove string.
10. Position pipes to cylinder and secure with clips.
11. Secure pipes and wires to cylinder with cable tie.
12. Install new clips securing pipes to roof frame.
13. Connect battery.
14. Install panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter Trim
Lower - RH - Renew).
15. Restore roof and tonneau to original positionRH Rear Main Hydraulic Cylinder Pipe -
Renew
Removal
1. Operate roof to halfway position with tonneau open then support roof when hydraulic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1).
2. Remove Panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter
Trim Lower - RH - Renew).
3. Disconnect battery.
Repair Operation Time (ROT)
ItemCode
Rear Main Hydrauli c Cylinder Pipe-
Renew RH
01.17.CM
WAR NI NG
APPROXIMATELY 20 SECONDS AFTER THE OPEN/
CLOSE OPERATION HAS BEEN INTERRUPTED THE ROOF MAY SUDDENLY DROP DUE TO LOSS OF
HYDRAULIC PRESSURE. IF THIS HAPPENS ENSURE NO
BODY PARTS ARE CLOSE TO THE ROOF MECHANISM. IF THE ROOF REQUIRES MAINTENANCE, SUPPORT
PROPERLY USING SUITABLE PROPS AND STRAPS.
Figure 1
Convertible Roof (01.17)
Body System (01.00)
May 2007 Workshop Manual 1-12-43
small quantity of oil replace plug and re-check level (see
Figure 1).
2. Install pipe to approximate route on vehicle and install cable ties.
3. Clean pipe and install pipe to pump. Slide retaining plate into place and tighten screws (pipes and locations
are numbered).
4. Install pump casing and secure velcro.
5. Install pump and casing under tonneau onto location posts.
6. Install cylinder pivot bracket and connect cylinder to bracket.
7. Move tonneau well liner ar ound lower cylinder fixing
and pump casing and secure velcro.
8. Install trim clip and position tonneau lining stiffening rod.
9. Attach pipes to guide stri ng, feed pipes through roof
frame and remove string.
10. Position pipes to cylinder and secure with clips.
11. Secure pipes and wires to cylinder with cable tie.
12. Install new clips securi ng pipes to roof frame.
13. Connect battery.
14. Install Panel quarter trim lower (see Workshop Manual procedure 01.05.CR Panel Assembly - Quarter Trim
Lower - RH - Renew).
15. Restore roof and tonneau to original position.
LH Front Hydraulic Cylinder Pipe -
Renew
Removal
1. Operate roof to halfway position with tonneau open then support roof when hydr aulic pressure drops with
suitable straps and support tonneau cover with suitable
prop (see Figure 1).
2. Remove wind deflector (see Workshop Manual
procedure 01.17.DA Wind Deflector - Renew).
3. Disconnect battery.
4. Remove lower cover (screw x1) (see Figure 2).
Figure 1
Repair Operation Time (ROT)
WA R N I N G
APPROXIMATELY 20 SECO NDS AFTER THE OPEN/
CLOSE OPERATION HAS BEEN INTERRUPTED THE ROOF MAY SUDDENLY DROP DUE TO LOSS OF
HYDRAULIC PRESSURE. IF THIS HAPPENS ENSURE NO
BODY PARTS ARE CLOSE TO THE ROOF MECHANISM. IF THE ROOF REQUIRES MAINTENANCE, SUPPORT PROPERLY USING SUITABLE PROPS AND STRAPS.
Figure 1
Figure 2