CHARGING SYSTEM
SC-27
C
D
E
F
G
H
I
J
L
MA
B
SC
Revision: 2006 November2007 350Z
9. Remove oil pressure switch harness clip (C) from alternator stay
(1).
10. Disconnect oil pressure switch connector (D) and oil tempera-
ture sensor connector (E).
11. Remove alternator mounting bolt (B) and alternator stay mount-
ing bolt (F) using power tools, then remove alternator stay.
12. Remove alternator mounting bolt (A), using power tools.
13. Remove alternator assembly downward from the vehicle.
ALTERNATOR PULLEY INSPECTION
Perform the following.
Make sure that alternator pulley does not rattle.
Make sure that alternator pulley nut is tight.
INSTALLATION
Installation is the reverse order of removal.
Install alternator, and check tension of belt. Refer to EM-12, "Checking Drive Belts" .
CAUTION:
Be sure to tighten “B” terminal nut carefully.
PKID1145E
Alternator pulley nut:
: 118 N·m (12.0 kg-m, 87 ft-lb)