2007 NISSAN 350Z ECM wiring diagram

[x] Cancel search: ECM wiring diagram

Page 470 of 720

NISSAN 350Z 2007 Z33 Engine Control Workshop Manual EC-470
DTC P0453 EVAP CONTROL SYSTEM PRESSURE SENSOR
Revision: 2006 November2007 350Z
2. CHECK CONNECTOR
1. Disconnect EVAP control system pressure sensor harness connector.
2. Check sensor harness co

Page 471 of 720

NISSAN 350Z 2007 Z33 Engine Control Workshop Manual DTC P0453 EVAP CONTROL SYSTEM PRESSURE SENSOR
EC-471
C
D
E
F
G
H
I
J
K
L
MA
EC
Revision: 2006 November2007 350Z
6.  CHECK EVAP CONTROL SYSTEM PRESSURE SENSOR POWER SUPPLY CIRCUIT-III
Check harness for

Page 472 of 720

NISSAN 350Z 2007 Z33 Engine Control Workshop Manual EC-472
DTC P0453 EVAP CONTROL SYSTEM PRESSURE SENSOR
Revision: 2006 November2007 350Z
10. CHECK EVAP CONTROL SYSTEM PRESSURE SENSOR GROUND CIRCUIT FOR OPEN AND 
SHORT
1. Turn ignition switch OFF.
2. D

Page 506 of 720

NISSAN 350Z 2007 Z33 Engine Control Workshop Manual EC-506
DTC P0550 PSP SENSOR
Revision: 2006 November2007 350Z
2. CHECK PSP SENSOR POWER SUPPLY CIRCUIT
1. Disconnect power steering pressure (PNP) sensor (1) harness
connector.
2. Turn ignition switch

Page 509 of 720

NISSAN 350Z 2007 Z33 Engine Control Workshop Manual DTC P0603 ECM POWER SUPPLY
EC-509
C
D
E
F
G
H
I
J
K
L
MA
EC
Revision: 2006 November2007 350Z
Wiring DiagramNBS000BH
TBWT1652E

Page 518 of 720

NISSAN 350Z 2007 Z33 Engine Control Workshop Manual EC-518
DTC P0643 SENSOR POWER SUPPLY
Revision: 2006 November2007 350Z
2. CHECK ACCELERATOR PEDAL POSITION SENSOR 1 POWER SUPPLY CIRCUIT-I
1. Disconnect accelerator pedal position (APP) sensor harness

Page 525 of 720

NISSAN 350Z 2007 Z33 Engine Control Workshop Manual DTC P0850 PNP SWITCH
EC-525
C
D
E
F
G
H
I
J
K
L
MA
EC
Revision: 2006 November2007 350Z
Specification data are reference values and are measured between each terminal and ground.
CAUTION:
Do not use EC

Page 526 of 720

NISSAN 350Z 2007 Z33 Engine Control Workshop Manual EC-526
DTC P0850 PNP SWITCH
Revision: 2006 November2007 350Z
5. CHECK PNP SWITCH INPUT SIGNAL CIRCUIT FOR OPEN AND SHORT-II
1. Check harness continuity between A/T assembly terminal 9 and TCM terminal