Page 920 of 6020

ENGINE MECHANICAL 6A – 115
RTW 46ASH002201
4JA1T(L):
4. Tighten the injection pump bolts to the specified torque.
5. Install the injection pump bracket (4) and the bracket bolts (5) and (6) to the cylinder body. Temporarily tighten
the bracket bolts.
6. Tighten the bracket bolts (5) to the specified torque.
7. Tighten the bracket bolts (6) to the specified torque.
Injection pump Bracket Bolt Torque (6) N·m(kg·m/lbft)
19 (1.9/14)
Injection pump Bracket Bolt Torque (5) N·m(kg·m/lbft)
40 (4.1/30)
030RY00007
24. Water Pump
1. Apply the recommended liquid gasket or its equivalent to the water pump at the position shown in the
illustration.
Do not apply an excessive amount of liquid gasket.
2. Tighten the water pump bolts to the specified torque.
W ater Pump Bolt Torque N·m(kg·m/lbft)
20 (2.0/14)
25.Timing Gear Case Cover
1.
Align the gear case with the timing gear case knock pin
and then install the timing gear case cover.
2. Tighten the gear case cover bolts to the specified torque.
Gear Case Cover Bolt Torque N·m(kg·m/lbft)
M8 19 (1.9/14)
M12 76 (7.7/56)
26. Crankshaft Damper Pulley
Tighten the crankshaft damper pulley bolt to the specified
torque.
Note:
Hold the flywheel ring gear stationary to prevent the
crankshaft from turning when tightening the damper
pulley bolt.
Crankshaft Damper Pulley Bolt Torque N·m(kg·m/lbft)
206 (21/152)
Take care not to damage the crankshaft damper pulley
boss.
014R100014
020R300004
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 921 of 6020

6A – 116 ENGINE MECHANICAL
27. Cylinder Head Gasket
The cylinder head gasket "TOP" mark must be facing up.
NOTE:
Before the gasket installation, measure the piston
head projection and select the appropriate head
gasket.
Refer to "INSPECTION AND REPAIR", "Cylinder Head
Gasket Selection".
28. Cylinder Head
1. Align the cylinder body dowels and the cylinder head dowel holes.
Carefully place the cylinder head on the cylinder head
gasket.
2. Apply a coat of engine oil to the cylinder head bolt threads and setting faces.
3. Tighten the cylinder head bolts in three steps of anglar
tightening methed.
Follow the numerical sequence shown in the
illustration.
Cylinder Head Bolt Torque N·m(kg·m/lbft)
1st step 49 (5.0/36)
2nd step
60° - 75 °
3rd step
60° - 75 °
30. Rocker Arm Shaft and Rocker Arm
Tighten the rocker arm shaft bracket bolts in the numerical
order shown in the illustration.
Rocker Arm Shaft Braket Bolt Torque N·m(kg·m/lbft)
54 (5.5/40)
31. Thermostat Housing
1. Install the thermostat housing.
2. Tighten the thermostat housing bolts to the specified torque.
Thermostat Housing Bolt Torque N·m(kg·m/lbft)
19 (1.9/14)
014LX083
011LX073
031R300002
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 922 of 6020

ENGINE MECHANICAL 6A – 117
RTW 46ASH001201
33. Injection Nozzle Holder
1. Install the injection nozzle gasket and the O-ring to the injection nozzle holder.
Be sure that the O-ring fits snugly in the injection
nozzle groove.
2. Install the nozzle holder toghther with the nozzle holder bracket to the cylinder head.
3. Tighten the nozzle holder bracket bolt to the specified
torque.
Injection Nozzle Holder Bracket Bolt
Torque N·m(kg·m/lbft)
37 (3.8/28)
Note on Valve Clearance Adjustment
Valve clearances must be adjusted before the cylinder
head cover is reinstalled.Refer to "Valve Clearance
Adjustment" in the "Servicing" Section of this manual.
Valve Clearance (At Cold) mm(in)
0.4 (0.0157)
RTW 46ASH001101
34. Cylinder Head Cover
1. Apply engine oil to the rocker arm and the valve spring.
2. Install the cylinder head cover gasket to the head cover. Check to see that the head cover gasket has no
loose areas.
3. Tighten the cylinder head cover nuts in the numerical order shown in the illustration.
Cylinder Head Cover Bolt Torque N·m(kg·m/lbft)
13 (1.3/9.4)
4. Connect the positive crankcase ventilation (PCV) hose to the cylinder head cover.
014RY00015
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 923 of 6020
6A – 118 ENGINE MECHANICAL
INSTALLATION
EXTERNAL PARTS
RTW 36AMF000701
Installation Steps
1.
Exhaust Manifold 18. Engine Mounting Bracket and
2.
Oil Cooler with Oil Filter Foot
3. Generator Bracket 19. Intake Manifold
4. W ater Inlet Pipe 20. Power Steering Oil Pump
5.
Generator and Adjusting Plate Bracket
6.
Vacuum Pump Oil Return Hose 21. Fuel Injection Pipe with Clip
7.
Compressor Bracket 22. Fuel Filter Bracket (Except
EURO III)
8. Turbocharger 23. Fuel Filter Assembly (Except
EURO III)
9. Catalytic Converter 24. Oil Level Gauge
10. Heat Protector 25. EGR Valve
11. Cooling Fan Pulley 26-1. EGR Pipe
12. Oil Cooler W ater Pipe 26-2. EGR Cooler (EURO III model
only)
13. Fuel Leak Off Pipe 27. Intake Pipe and Throttle Body
(4JA1TC/4JH1TC only)
14. Oil Pressure W arning Switch 28. Clutch Assembly or Flex Plate
15. Starter Motor
16. Injection Pump
17. Injection Pump Cover
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 924 of 6020
ENGINE MECHANICAL 6A – 119
Installation
1. Exhaust Manifold
1) Install the exhaust manifold to the cylinder head with the manifold gasket.
2) Tighten the exhaust manifold bolts and nuts to the specified torque a little at a time.
Exhaust Manifold Bolt and Nuts
Torque N·m(kg·m/Ib ft)
24 (2.4/17)
3) Install the exhaust manifold bracket to the manifold
and the cylinder body.
Manifold Bracket Bolt Torque N·m(kg·m/Ib ft)
19 (1.9/14)
RTW 46ASH001301
2. Oil Cooler with Oil Filter
1) Install the O-ring to the oil filter body flange groove.
2) Install the oil filter body to cylinder block and tighten to the specified torque.
Oil Filter Body Bolt and Nut
Torque N·m(kg·m/Ib ft)
BOLT 19 (1.9/14)
NUT 24 (2.4/17)
3. Generator Bracket
Install the generator bracket to the cylinder body and
tighten the bracket bolts to the specified torque.
Bracket Bolt Torque N·m(kg·m/Ib ft)
40 (4.1/30)
027R100003
027R100004
066RY00001
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 925 of 6020
6A – 120 ENGINE MECHANICAL
4. Water Inlet Pipe
1) Tighten the water inlet pipe bolts to the specified torque.
Suction Pipe Bolt Torque N·m(kg·m/Ib ft)
19 (1.9/14)
5. Generator and Adjusting Plate
1) Install the generator to the bracket (1).
2) Temporarily tighten the generator bolt (2) and adjusting plate bolts (3).
The bolts will be finally tightened after installation of
the cooling fan drive belt.
3) Connect the vacuum pump rubber hose (4) to the
vacuum pump (5), and the oil pan (6).
6. Vacuum Pump Oil Return Hose Connect the vacuum oil pipe (7) to the vacuum pump, and
the cylinder body
052R300001
7. Compressor Bracket 1) Install the compressor bracket to the cylinder head.
2) Tighten the bracket bolts to the specified torque.
Bracket Bolt Torque N·m(kg·m/Ib ft)
M8×1.25
19 (1.9/14)
M10×1.25
40 (4.1/30)
066RY00002
032R300001
042RY00003
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 926 of 6020

ENGINE MECHANICAL 6A – 121
8. Turbocharger
1) Install the turbocharger and the gasket.
2) Temporarily tighten the turbocharger nuts at this time. They will be fully tightened after the installation of the
turbocharger oil pipe.
Always install new nuts and new gasket.
3) Install the oil return pipe with gasket to the
turbocharger.
4) Tighten the turbocharger oil return pipe to the specified torque.
Bracket Bolt Torque N·m(kg·m/Ib ft)
8 (0.8/6)
5) Before installing the oil feed pipe, supply 10 - 20 cc of clean engine oil to the turbocharger center housing
through the oil feed opening.
6) Turn the rotating assembly with your hand to thoroughly lubricate the internal parts.
7) Tighten the oil feed pipe to the specified torque.
Turbocharger Oil Feed Pipe Joint
Bolt Torque N·m(kg·m/Ib ft)
M10×1.5
22 (2.25/16)
M14×1.5
54 (5.5/40)
RTW 46ASH001501
8) Tighten the turbocharger nut to the specified torque.
Turbocharger Nut Torque N·m(kg·m/Ib ft)
27 (2.7/20)
036R100001
027R100005 027R100002
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 927 of 6020

6A – 122 ENGINE MECHANICAL
RTW 46ASH001601
9) Install the water feed adapter (1) with the gaskets to
turbocharger and tighten to the specified torque.
Adapter Torque N·m(kg·m/Ib ft)
39 (4.0/29)
10) Install the water feed pipe with the gaskets and tighten to the specified torque.
W ater Return Pipe Torque N·m(kg·m/Ib ft)
39 (4.0/29)
11) Install the water return pipe with the gaskets and tighten to the specified torque.
W ater Return Torque N·m(kg·m/Ib ft)
39 (4.0/29)
12) Clamp the water feed pipe to the oil return pipe of the turbocharger.
Fixing Bolt (3) Torque N·m(kg·m/Ib ft)
8 (0.8/6)
13) Install the hoses for the water feed and return.
9. Catalytic Converter
Install the catalytic converter with gasket and tighten the
nut to the specified torque.
Catalytic converter Nut Torque N·m(kg·m/Ib ft)
27 (2.7/20)
Do not install the catalytic converter, if drop down it.
10. Heat Protector Install the heat protector and tighten the bolt to the
specified torque.
Heat Protector Bolt Torque N·m(kg·m/Ib ft)
9 (0.9/6.5 Ib in)
033R300002
11. Cooling Fan Pulley
1) Install the cooling fan pulley to the water pump.
2) Tighten the cooling fan pulley nuts to the specified torque.
Pulley Nut Torque N·m(kg·m/Ib ft)
8 (0.8/6)
12. Oil Cooler Water Pipe
13. Fuel Leak Off Pipe
14. Oil Pressure Warning Switch
027R100007
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007