Page 4201 of 6020
7A4–66 UNIT REPAIR (AW30–40LE)
Before assembling new discs, soak them in ATF
for at least fifteen minutes.
248RY00045
4. Check piston return spring. Using calipers, measure the free length of the return
spring.
Standard length: 19.47 mm (0.7665 in)
247RY00034
Reassembly
1. Coat the assembled thrust bearing and race with petroleum jelly and install it onto the forward clutch
drum, with the race side facing downward.
Bearing and race (Reference)
248RY00044
2. Coat the three oil rings with ATF. Contract the oil seal rings as shown, and install
three oil seal rings onto the forward clutch drum.
NOTE: Do not spread the ring ends more than
necessary.
248RY00046
Inside diameter 33.7 mm (1.327 in)
Outside diameter 47.8 mm (1.882 in)
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 4207 of 6020
7A4–72 UNIT REPAIR (AW30–40LE)
Planetary Sun Gear and No.1 One-Way Clutch
Disassembled View
RTW77ASF000301
EndOFCallout
Legend(1) Snap ring
(2) Planetary sun gear (3) Sun gear input drum
(4) Snap ring
(5) Oil seal ring
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 4208 of 6020
UNIT REPAIR (AW30–40LE) 7A4–73
Disassembly
1. Check operation of No.1 one-way clutchHold the planetary sun gear and turn the second
brake hub.
The second brake hub should turn freely clockwise
and should lock counterclockwise.
RUW37ASH004601
E ndOFCallout
2. Remove the one-way clutch and second brake hub.
3. Remove the trust washer (plastic).
4. Remove two oil seal rings (metal).
248RY00052
5. Remove the snap ring with snap ring pliers.
248RY00053
6. Remove the sun gear input drum.
7. Remove the snap ring from planetary sun gear.
Inspection and Repair
1. Check planetary sun gear bushing Using a dial indicator, measure the inside diameter
of the planetary sun gear bushing.
Maximum inside diameter: 27.08 mm (1.066 in) If the inside diameter is greater than the maximum,
replace the planetary sun gear.
248RY00054
Legend
(1) Free
(2) Lock
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 4209 of 6020
7A4–74 UNIT REPAIR (AW30–40LE)
Reassembly
1. Install snap ring to planetary sun gear.
248RY00055
2. Place a wooden block, etc. as a work stand andplace the planetary sun gear onto it.
Install the sun gear input drum onto the planetary
sun gear.
248RY00056
3. Install snap ring with snap ring pliers.
248RY00053
4. Coat the two oil seal rings (metal) with ATF. Install the two oil seal rings onto the planetary sun
gear.
NOTE: Do not spread the ring ends too much.
248RY00052
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 4216 of 6020
UNIT REPAIR (AW30–40LE) 7A4–81
Disassembly
1. Remove second brake assembly from output shaft.
246RY00014
2. Remove oil seal ring from output shaft.
247RY00028
3. Remove the seven discs, seven plates and flange(B–3). 4. Remove rear planetary gear from rear planetary ring
gear.
247RY00029
5. Check operation of No.2 one-way clutch.Hold the planetary gear and turn the one-way clutch
inner race.
The one-way clutch inner race should turn freely
counterclockwise and should lock clockwise.
RUW37ASH004701
En dOFCallout
Legend
(1) Lock
(2) Free
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 4220 of 6020
UNIT REPAIR (AW30–40LE) 7A4–85
Install six clutch discs and six brake plates
alternately, starting with clutch disc, onto the rear
planetary gear assembly.
247RY00047
11. Coat the oil seal ring with ATF and install it to the output shaft.
NOTE: Do not spread the ring ends too much.
247RY00028
12. Install output shaft into rear planetary gear assembly.
247RY00042
13. Install second brake assembly to output shaft.
246RY00014
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 4226 of 6020
UNIT REPAIR (AW30–40LE) 7A4–91
Transmission Case
Disassembled View
249RY00001
EndOFCallout
Disassembly
1. Using a chisel, cut off the spacer and remove it fromthe shaft.
249RY00002
Legend
(1) Spacer
(2) Pin
(3) Manual valve lever shaft (4) Manual valve lever
(5) Oil seal
(6) Oil seal
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007
Page 4227 of 6020
7A4–92 UNIT REPAIR (AW30–40LE)
2. Using a punch, drive out the pin.
249RY00003
3. Pull the manual valve lever shaft out through thecase by the threads.
4. Take out the manual valve lever.
5. Using a screwdriver, remove the oil seals.
249RY00004
Reassembly
1. Coat a new oil seal lip with multi purpose grease. Using special tool, drive in the oil seal.
Oil seal installer : 5-8840-2169-0
240RY00021
2. Assemble a new spacer to the manual valve lever.
3. Install the manual valve lever shaft to the transmission case through the manual valve lever by
the threads.
249RY00005
BACK TO CHAPTER INDEX
TO MODEL INDEX
ISUZU KB P190 2007