2006 MITSUBISHI LANCER group 51

[x] Cancel search: group 51

Page 27 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
TROUBLESHOOTING
ENGINE COOLING14-13
STEP 18. Check the cooling fan motor drive 
control unit connector A-18.
AC100293
A-18
321
Connector: A-18
AD
Q:Is t h e con n ec tor   in goo d  c ondit i o n ?
Y

Page 29 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
TROUBLESHOOTING
ENGINE COOLING14-15
STEP 22. Check the cooling fan motor drive 
control unit.
AC303555AB
Connector: C-123 <M/T>, C-122 <A/T>C-123 <M/T>
or
C-122 <A/T>
C-123 <M/T>
Engine-ECU <M/T> or

Page 33 of 800

MITSUBISHI LANCER 2006  Workshop Manual TROUBLESHOOTING
ENGINE COOLING14-19
(8) Reconnect the connector with connector terminal 
pin still installed.
Q: Does the cooling fan rotate?  And when the 
connector terminal pin is connected to the

Page 34 of 800

MITSUBISHI LANCER 2006  Workshop Manual TROUBLESHOOTING
ENGINE COOLING14-20
INSPECTION PROCEDURE 4: Cooling Fan (R.H.) <4G1> or A/C Condenser Fan <4G6> does not 
Operate {When Cooling Fan (L.H.) Operate} <Vehicles with A/C>
COOLING FAN (L.H

Page 38 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
THERMOSTAT
ENGINE COOLING14-24
COOLING FAN MOTOR CHECK
M1141007100220
1
2
AC303501AB
Cooling fan motor drive control unit
Cooling fan motor
(L.H.) connector
1
2
AC303502AB
Cooling fan motor 
drive co

Page 41 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
WATE R  P U M P
ENGINE COOLING14-27
WAT E R  P U M P
REMOVAL AND INSTALLATION <4G1>M1141002700421
Pre-removal and Post-installation Operation
•Engine Coolant Draining and Refilling (Refer to P.14-2

Page 42 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
WATE R  P U M P
ENGINE COOLING14-28
REMOVAL AND INSTALLATION <4G6>
M1141002700432
Pre-removal and Post-installation Operation
•Engine Coolant Draining and Refilling (Refer to P.14-21).
•Valve Tim

Page 43 of 800

MITSUBISHI LANCER 2006  Workshop Manual 
WATER HOSE AND WATER PIPE
ENGINE COOLING14-29
WATER HOSE AND WATER PIPE
REMOVAL AND INSTALLATION <4G1>M1141003300415
Pre-removal and Post-installation Operation
•Under Cover Removal and Installatio
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 ... 128 next >