FUEL INJECTOR AND FUEL TUBE
EM-49
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Tighten mounting bolts in two steps in numerical order as
shown in the figure.
6. Connect injector sub-harness.
7. Install intake manifold collectors (upper and lower). Refer to EM-19, "
INTAKE MANIFOLD COLLECTOR" .
8. Install fuel sub-tube on rear end of intake manifold collector (lower).
9. Connect fuel feed hose (with damper).
Handling procedure of O-ring is the same as that of fuel damper and fuel sub-tube.
Insert fuel damper straight into fuel sub-tube.
Tighten mounting bolts evenly in turn.
After tightening mounting bolts, make sure that there is no gap between flange and fuel sub-tube.
10. Connect quick connector between fuel feed hose (with damper) and centralized under-floor piping con-
nection as follows:
a. Make sure no foreign substances are deposited in and around centralized under-floor piping and quick
connector, and no damage on them.
b. Thinly apply new engine oil around centralized under-floor piping from tip end to spool end.
c. Align center to insert quick connector straightly into centralized under-floor piping.
Insert quick connector to centralized under-floor piping until
top spool is completely inside quick connector, and 2nd level
spool exposes right below quick connector.
CAUTION:
Hold “A” position as shown in the figure when inserting
centralized under-floor piping into quick connector.
Carefully align center to avoid inclined insertion to pre-
vent damage to O-ring inside quick connector.
Insert until you hear a “click” sound and actually feel the
engagement.
To avoid misidentification of engagement with a similar
sound, be sure to perform the next step.
d. Pull quick connector by hand holding “A” position. Make sure it is completely engaged (connected) so that
it does not come out from centralized under-floor piping.
e. Install quick connector cap to quick connector connection.
Install quick connector cap with arrow on surface facing in
direction of quick connector (fuel feed hose side).
CAUTION:
If quick connector cap cannot be installed smoothly, quick
connector may have not been installed correctly. Check the
connection again.
11. Install in the reverse order of removal after this step. 1st step
: 10.1 Nꞏm (1.0 kg-m, 7 ft-lb)
2nd step
: 23.6 Nꞏm (2.4 kg-m, 17 ft-lb)
KBIA1296E
PBIC2471E
KBIA1298E
EM-50
[VQ35DE]
FUEL INJECTOR AND FUEL TUBE
Revision: 2006 January2006 M35/M45
INSPECTION AFTER INSTALLATION
Check on Fuel Leakage
1. Turn ignition switch “ON” (with the engine stopped). With fuel pressure applied to fuel piping, make sure
there are no fuel leaks at connection points.
NOTE:
Use mirrors for checking at points out of clear sight.
2. Start the engine. With engine speed increased, make sure again that there are no fuel leaks at connection
points.
CAUTION:
Do not touch the engine immediately after stopped, as the engine becomes extremely hot.
ROCKER COVER
EM-51
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
ROCKER COVERPFP:13264
ComponentsNBS004NG
Removal and InstallationNBS004NH
REMOVAL
1. Release the fuel pressure. Refer to EC-98, "FUEL PRESSURE RELEASE" .
2. Remove intake manifold collectors (upper and lower). Refer to EM-19, "
INTAKE MANIFOLD COLLEC-
TOR" .
3. Separate engine harness removing their brackets from rocker covers.
4. Remove ignition coil. Refer to EM-42, "
IGNITION COIL" .
5. Remove PCV hoses from rocker covers.
6. Remove PCV valve and O-ring from rocker cover (right bank), if necessary.
7. Remove oil filler cap and oil catcher from rocker cover (left bank), if necessary.
1. PCV hose 2. Oil filler cap 3. Oil catcher
4. Rocker cover (right bank) 5. PCV control valve 6. O-ring
7. Rocker cover gasket 8. Rocker cover (left bank)
PBIC2303E
EM-54
[VQ35DE]
FRONT TIMING CHAIN CASE
Revision: 2006 January2006 M35/M45
FRONT TIMING CHAIN CASEPFP:13599
Removal and InstallationNBS004NI
NOTE:
This section describes removal/installation procedure of front timing chain case and timing chain related
parts without removing oil pan (upper) on the vehicle.
When oil pan (upper) needs to be removed or installed, or when rear timing chain case is removed or
installed, remove oil pans (upper and lower) first. Then remove front timing chain case, timing chain
related parts, and rear timing chain case in this order, and install in reverse order of removal. Refer to EM-
64, "TIMING CHAIN" .
Refer to EM-64, "TIMING CHAIN" for component parts location.
REMOVAL
1. Remove engine room cover (RH and LH). Refer to EM-14, "ENGINE ROOM COVER" .
2. Disconnect the battery cable from the negative terminal. Refer to SC-4, "
BATTERY" .
3. Remove engine cover with power tool. Refer to EM-19, "
INTAKE MANIFOLD COLLECTOR" .
4. Remove air duct (inlet) and air cleaner case assembly. Refer to EM-17, "
AIR CLEANER AND AIR DUCT"
.
5. Remove front and rear engine undercover with power tool.
6. Release the fuel pressure. Refer to EC-98, "
FUEL PRESSURE RELEASE" .
7. Drain engine oil. Refer to LU-9, "
Changing Engine Oil" .
CAUTION:
Perform this step when the engine is cold.
Do not spill engine oil on drive belts.
8. Drain engine coolant from radiator. Refer to CO-11, "
Changing Engine Coolant" .
CAUTION:
Perform this step when the engine is cold.
Do not spill engine coolant on drive belts.
9. Remove radiator hose (upper and lower) and A/T fluid cooler hose. Refer to CO-14, "
RADIATOR" .
10. Separate engine harnesses removing their brackets from front timing chain case.
11. Remove drive belts. Refer to EM-15, "
DRIVE BELTS" .
12. Remove intake manifold collectors (upper and lower). Refer to EM-19, "
INTAKE MANIFOLD COLLEC-
TOR" .
13. Remove power steering oil pump from bracket with piping connected, and temporarily secure it aside.
Refer to PS-29, "
POWER STEERING OIL PUMP" .
14. Remove power steering oil pump bracket. Refer to PS-29, "
POWER STEERING OIL PUMP" .
15. Remove alternator. Refer to SC-23, "
CHARGING SYSTEM" .
16. Remove water bypass hose, water hose clamp and idler pulley bracket from front timing chain case.
17. Remove intake valve timing control covers.
Loosen mounting bolts in reverse order as shown in the fig-
ure.
U s e t h e s e a l c u t t e r [ S S T: K V 1 0 1111 0 0 ( J 3 7 2 2 8 ) ] t o c u t l i q u i d
gasket for removal.
CAUTION:
Shaft is internally jointed with camshaft sprocket (INT) cen-
ter hole. When removing, keep it horizontal until it is com-
pletely disconnected.
SEM728G
FRONT TIMING CHAIN CASE
EM-63
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
10. Rotate crankshaft pulley in normal direction (clockwise when viewed from front) to confirm it turns
smoothly.
11. For the following operations, perform steps in the reverse order of removal.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-12, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside chain tensioner drops after removal/installation, slack in guide may generate a
pounding noise during and just after the engine start. However, this does not indicate an unusualness.
Noise will stop after hydraulic pressure rises.
Warm up engine thoroughly to make sure there is no leakage of fuel, or any oil/fluids including engine oil
and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.
Summary of the inspection items:
* Transmission/transaxle/CVT fluid, power steering fluid, brake fluid, etc. Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage
TIMING CHAIN
EM-65
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Removal and InstallationNBS004NK
NOTE:
This section describes procedures for removing/installing front timing chain case and timing chain related
parts, and rear timing chain case, when oil pan (upper) needs to be removed/installed for engine overhaul,
etc.
To remove/install front timing chain case, timing chain, and its related parts without removing oil pan
(upper), refer to EM-54, "
FRONT TIMING CHAIN CASE" .
REMOVAL
1. Remove engine room cover (RH and LH) Refer to EM-14, "ENGINE ROOM COVER" .
2. Remove front tire.
3. Disconnect the battery cable from the negative terminal.
4. Remove engine cover with power tool. Refer to EM-19, "
INTAKE MANIFOLD COLLECTOR" .
5. Remove air duct (inlet) and air cleaner case assembly. Refer to EM-17, "
AIR CLEANER AND AIR DUCT"
.
6. Remove front and rear engine undercover with power tool.
7. Release the fuel pressure. Refer to EC-98, "
FUEL PRESSURE RELEASE" .
8. Drain engine coolant from radiator. Refer to CO-11, "
Changing Engine Coolant" .
CAUTION:
Perform this step when the engine is cold.
Do not spill engine coolant on drive belts.
9. Remove radiator hose (upper and lower) and A/T fluid cooler hose. Refer to CO-14, "
RADIATOR" .
10. Drain engine oil. Refer to LU-9, "
Changing Engine Oil" .
CAUTION:
Perform this step when the engine is cold.
Do not spill engine oil on drive belts.
11. Separate engine harnesses removing their brackets from front timing chain case.
12. Remove intake manifold collectors (upper and lower). Refer to EM-19, "
INTAKE MANIFOLD COLLEC-
TOR" .
13. Remove radiator cooling fan assembly. Refer to CO-22, "
COOLING FAN" .
14. Remove drive belts. Refer to EM-15, "
DRIVE BELTS" .
15. Remove A/C compressor from bracket with piping connected, and temporarily secure it aside. Refer to
ATC-155, "
Removal and Installation of Compressor" .
16. Remove power steering oil pump from bracket with piping connected, and temporarily secure it aside.
Refer to PS-29, "
POWER STEERING OIL PUMP" .
17. Remove power steering oil pump bracket. Refer to PS-29, "
POWER STEERING OIL PUMP" .
18. Remove alternator. Refer to SC-23, "
CHARGING SYSTEM" .
19. Remove water bypass hose, water hose clamp and idler pulley bracket from front timing chain case.
20. Remove intake valve timing control covers.
1. Timing chain tensioner (secondary) 2. Internal chain guide 3. Timing chain tensioner (secondary)
4. Camshaft sprocket (EXH) 5. Timing chain (secondary) 6. Timing chain (primary)
7. Camshaft sprocket (INT) 8. Camshaft sprocket (EXH) 9. Timing chain (secondary)
10. Camshaft sprocket (INT) 11. Slack guide 12. Crankshaft sprocket
13. Timing chain tensioner (primary) 14. Intake valve timing control cover 15. Collared O-ring
16. O-ring 17. Chain tensioner cover 18. Intake valve timing control cover
19. Water hose clamp 20. Idler pulley bracket 21. Idler pulley
22. Crankshaft pulley 23. Front oil seal 24. Idler pulley
25. A/C compressor bracket 26. Water pump cover 27. Bracket
28. Front timing chain case 29. Bracket 30. Rear timing chain case
31. O-ring 32. Tension guide 33. Water drain plug (front side)
EM-82
[VQ35DE]
TIMING CHAIN
Revision: 2006 January2006 M35/M45
c. Tighten crankshaft pulley bolt.
d. Place a matching mark (A) on crank pulley (1) aligning with the
matching (B) of crank pulley mounting bolt (2). Tighten the bolts
90 degrees (one marks).
NOTE:
The figure shows crankshaft pulley bolt with four marks.
Use an angle wrench (SST) for a crankshaft pulley bolt with
six–marks.
e. Rotate crankshaft pulley in normal direction (clockwise when viewed from front) to confirm it turns
smoothly.
19. For the following operations, perform steps in the reverse order of removal.
INSPECTION AFTER INSTALLATION
Inspection for Leaks
The following are procedures for checking fluids leak, lubricates leak.
Before starting engine, check oil/fluid levels including engine coolant and engine oil. If less than required
quantity, fill to the specified level. Refer to MA-12, "
RECOMMENDED FLUIDS AND LUBRICANTS" .
Use procedure below to check for fuel leakage.
–Turn ignition switch “ON” (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
NOTE:
If hydraulic pressure inside chain tensioner drops after removal/installation, slack in guide may generate a
pounding noise during and just after the engine start. However, this does not indicate an unusualness.
Noise will stop after hydraulic pressure rises.
Warm up engine thoroughly to make sure there is no leakage of fuel, or any oil/fluids including engine oil
and engine coolant.
Bleed air from lines and hoses of applicable lines, such as in cooling system.
After cooling down engine, again check oil/fluid levels including engine oil and engine coolant. Refill to the
specified level, if necessary.: 44.1 Nꞏm (4.5 kg-m, 33 ft-lb)
PBIC4627J
PBIC3821E
TIMING CHAIN
EM-83
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2006 January2006 M35/M45
Summary of the inspection items:
* Transmission/transaxle/CVT fluid, power steering fluid, brake fluid, etc. Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Other oils and fluid* Level Leakage Level
Fuel Leakage Leakage Leakage