Page 211 of 462
![Citroen C4 2005 2.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 205
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RFJ
Tools.
[1] Camshaft setting peg: (-).0194.B
[2] Crankshaft setting peg: (-).0189.R Citroen C4 2005 2.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 205
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RFJ
Tools.
[1] Camshaft setting peg: (-).0194.B
[2] Crankshaft setting peg: (-).0189.R](/manual-img/9/4138/w960_4138-210.png)
Downloaded from www.Manualslib.com manuals search engine 205
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RFJ
Tools.
[1] Camshaft setting peg: (-).0194.B
[2] Crankshaft setting peg: (-).0189.R
[3]Timing belt retaining pin: (-) 0189.K
[4]Adaptor for angular tightening: 4069-T
[5]Hub immobilising tool: (-).0189.S
[5a] : (-).0189.S1
[5b] : (-).0189.S2
Pliers for removing plastic pins: 7504-T
IMPERATIVE: Respect the safety and cleanliness requirements.
Checking and setting the timing.
Removing.
Disconnect the negative terminal of the battery
(see corresponding operation).
Raise and support the vehicle, front wheels hanging.
Remove the auxiliaries drive belt
(see corresponding operation).
Unclip and move aside the fuel supply hose from the timing cover.
Suspend the engine by means of a workshop hoist.
Remove the RH engine support and the timing cover (1).
Turn the engine by means of the screw (3)of the crankshaft pinion (2)to bring it to the pegging
position.
B1BP310C
C4
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 205
Page 218 of 462
Downloaded from www.Manualslib.com manuals search engine 212
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RFN
Tools.
[1] Camshaft setting peg: (-).0189.A
[2] Crankshaft setting peg: (-).0189.R
[3]Timing belt retaining pin: (-) 0189.K
[4] Adaptor for angular tightening: 4069-T
[5]Hub immobilising tool: (-).0189.S
[5a] : (-).0189.S1
[5b] : (-).0189.S2
Pliers for removing plastic pins: 7504-T
IMPERATIVE: Respect the safety and cleanliness requirements.
Checking and setting the timing.
Removing.
Disconnect the negative terminal of the battery
(see corresponding operation).
Raise and support the vehicle, front wheels hanging.
Remove the auxiliaries drive belt
(see corresponding operation).Unclip and move aside the fuel supply hose from the timing cover.
Remove the timing cover (1).
Turn the engine by means of the screw (3)of the crankshaft pinion (2)to bring it to the pegging
position.
B1BP2V4C
C4
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 212
Page 232 of 462
![Citroen C4 2005 2.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 226
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RFK
Tools.
[1]Camshaft setting peg: (-).0189.A
[2]Crankshaft setting peg: (-).0189.R
[3 Citroen C4 2005 2.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 226
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RFK
Tools.
[1]Camshaft setting peg: (-).0189.A
[2]Crankshaft setting peg: (-).0189.R
[3](/manual-img/9/4138/w960_4138-231.png)
Downloaded from www.Manualslib.com manuals search engine 226
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RFK
Tools.
[1]Camshaft setting peg: (-).0189.A
[2]Crankshaft setting peg: (-).0189.R
[3] Timing belt retaining pin: (-) 0189.K
[4]Adaptor for angular tightening: 4069-T
[5]Hub immobilising tool: (-).0189.S
[5a] : (-).0189.S1
[5b] : (-).0189.S2
Pliers for removing plastic pins: 7504-T
IMPERATIVE: Respect the safety and cleanliness requirements.
Checking and setting the timing.
Removing.
Disconnect the negative terminal of the battery
(see corresponding operation).
Raise and support the vehicle, front wheels hanging.
Remove the auxiliaries drive belt
(see corresponding operation).
Unclip and move aside the fuel supply hose from the timing cover.
Remove the screw (1).
Move aside the power steering pipes.
Turn the engine by means of the screw (4)of the crankshaft pinion (3)to bring it to the pegging position.
B3EP15YC
B1BP36YC
C4
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 226
Page 238 of 462
![Citroen C4 2005 2.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 232
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1BP2LXC
Tools.
[1] Pliers for removing plastic pegs: 7504-T
[2]Lever for de Citroen C4 2005 2.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 232
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1BP2LXC
Tools.
[1] Pliers for removing plastic pegs: 7504-T
[2]Lever for de](/manual-img/9/4138/w960_4138-237.png)
Downloaded from www.Manualslib.com manuals search engine 232
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1BP2LXC
Tools.
[1] Pliers for removing plastic pegs: 7504-T
[2]Lever for detensioning the dynamic tensioner roller: (-).0194.E
[3]Engine flywheel setting peg: (-).0194.C
[4] Camshaft setting peg: (-).0194.B
[5]Crankshaft and high pressure pump setting peg: (-).0194.A
Preliminary operations.
Remove:
- The front RH wheel.
- The front RH splash-shield, using tool [1].
- The clips of the electrical harness on the upper timing cover.
- The accessories belt, using tool [2]
(see corresponding operation).
Checking the setting.
Disconnect the battery negative cable.
Remove the upper timing cover (1).
Rotate the engine using the screw (2)of the crankshaft pulley.
NOTE:The locking hole is located under the crankshaft bearing cap cover.
Undo the screw (2).
Detension the auxiliary drive belt dynamic tensioner roller, using tool [2].
XSARA
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 232
Page 279 of 462
Downloaded from www.Manualslib.com manuals search engine 273
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Tools.
[1]Kit of plugs: (-).0188.T
[2]Double flywheel setting peg: (-).0188.X
[3]Camshaft setting peg: (-).0188.M
[4]Belt clamp: (-).0188.AD
[5]Pinion centrer: (-).0188.AH
[6]Flywheel lock: (-).0188.F
[7]Pulley(-).0188.P
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel injection (HDi) engine versions.
Removing.
Slacken the front RH wheel bolts.
Raise and support the front RH side of the vehicle.
Disconnect the negative terminal of the battery.
Remove:
- The under-engine sound-deadening.
- The front RH wheel.
- The front RH splash-shield.
- The engine cover.
Remove the auxiliaries drive belt
(see corresponding operation).
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 273
Page 280 of 462
Downloaded from www.Manualslib.com manuals search engine 274
ENGINE
274
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Uncouple, plug and move aside, using tool [7],
the fuel delivery pipe (1)and the fuel return pipe (2).
Suspend the engine, using a workshop hoist.
Remove the bracket (3)and the RH engine
support (4).
Move aside the electrical harness (5).
Remove:
- The upper timing cover screws.
- The upper timing cover (6).
Rotate the engine by means of the auxiliaries drive
pulley.
Orient the camshaft pinion in the pegging position,
use a mirror if necessary.
Peg the camshaft, using tool [3].
Peg the engine flywheel, using tool [2].
Lock the flywheel, using tool [6].
B1BP351C
B1EP1FAC
B1EP1FBC
B1BP31EC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 274
Page 281 of 462
Downloaded from www.Manualslib.com manuals search engine 275
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Remove:
- The screw (8).
- The auxiliaries drive pulley (7).
- The crankshaft position sensor (11).
- The lower timing cover (9).
- The target of the crankshaft position sensor (10), using tool [7].
- The lower torque reaction rod.
- The tool [6].
Slacken the screw (12)of the tensioner roller (17).
Remove the timing belt (13).
Checks.
IMPERATIVE: Just before refitting, carry out the checks below.
Check:
- That the rollers (14)and (17)turn freely
(without play and without
any tight spot).
- That the coolant pump pulley (16)turns freely (without play and
without any tight spot).
- That there are no traces of oil leaks from the crankshaft and
camshaftseals, etc.
- That the crankshaft pinion travels freely on the keyway (15).
Replace defective components if necessary.
B1EP1FCC
B1EP1FDC
B1EP1FEC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 275
Page 282 of 462
Downloaded from www.Manualslib.com manuals search engine 276
ENGINECHECKING AND SETTING THE VALVE TIMING
Engine: RHR
Refitting.
Centre the crankshaft pinion (15), using tool [5].
Reposition the timimg belt on the pulley (18).
Put the tool [4]in place
(tighten moderately).
Reposition the timimg belt, strip «a»well tensioned
in the following order:
- Guide roller (14).
- Crankshaft pinion (15).
- Coolant pump pinion (16).
- Tensioner roller (17).
Remove tools [4]and [5].
Bring the index «d»outside the plate at «c», by
turning the tensioner roller in the direction of the
arrow «b», using a hexagonal spanner at «e».
Tighten screw (12)of the tensioner roller (17)to
2,1 ± 0,2 m.daN.
Lock the flywheel, by means of tool [6].
Refit the auxiliaries drive pulley (7).
Tighten the screw (8)to 7 ± 0,7 m.daN.
Remove tools [6], [2]and [3].
B1EP1FFC
B1EP1FGC
B1EP1FHC
B1EP1FJC
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 276