Page 238 of 462
![Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 232
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1BP2LXC
Tools.
[1] Pliers for removing plastic pegs: 7504-T
[2]Lever for de Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 232
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1BP2LXC
Tools.
[1] Pliers for removing plastic pegs: 7504-T
[2]Lever for de](/manual-img/9/4138/w960_4138-237.png)
Downloaded from www.Manualslib.com manuals search engine 232
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1BP2LXC
Tools.
[1] Pliers for removing plastic pegs: 7504-T
[2]Lever for detensioning the dynamic tensioner roller: (-).0194.E
[3]Engine flywheel setting peg: (-).0194.C
[4] Camshaft setting peg: (-).0194.B
[5]Crankshaft and high pressure pump setting peg: (-).0194.A
Preliminary operations.
Remove:
- The front RH wheel.
- The front RH splash-shield, using tool [1].
- The clips of the electrical harness on the upper timing cover.
- The accessories belt, using tool [2]
(see corresponding operation).
Checking the setting.
Disconnect the battery negative cable.
Remove the upper timing cover (1).
Rotate the engine using the screw (2)of the crankshaft pulley.
NOTE:The locking hole is located under the crankshaft bearing cap cover.
Undo the screw (2).
Detension the auxiliary drive belt dynamic tensioner roller, using tool [2].
XSARA
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 232
Page 239 of 462

Downloaded from www.Manualslib.com manuals search engine 233
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1EP18EC
Checking the setting (continued).
Remove:
- The accessories drive belt.
- The accessories drive pulley.
- The lower timing cover (3).
IMPERATIVE: The magnetic track should show no signs of damage
and should not be approached by any other source of magnetism.
Reposition the screw (2).
Remove tool [3].
Rotate the engine by means of the crankshaft pinion screw (2)
(clockwise), to bring it to the pegging position.
Position the tool [4].
Peg the crankshaft pinion (1), using tool [5].
Peg the high pressure pump pinion, using tool [5].
NOTE: Index «a»of the roller tensioner must be centred within
the area «b».
Check the correct positioning of index «a».
Remove tools [4]and [5].
Rotate the engine ten times.
Fit the tools [4]and [5].
If pegging is not possible, carry out the operation to remove/refit the
timing belt
(see corresponding operation).
B1JP03SCB1EP18DCB1EP18FC
XSARA
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 233
Page 245 of 462
Downloaded from www.Manualslib.com manuals search engine 239
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 8HX - 8HZ
B1EP18LCB1BP2LZC
Setting the timing (continued).
Refit:
- The intermediate RH engine support, tighten the screws (16)to 5,5 ± 0,5 m.daN.
- The RH engine support, tighten the screws (17)to 4,5 ± 0,4 m.daN.
- The bottom timing cover (3).
Immobilise the engine flywheel, using tool [3].
Remove the screw (2).
Refit the accessories drive pulley and tighten to:
- Pre-tighten to : 3 ± 0,3 m.daN.
- Angular tighten to: 180° ± 1,8°.
Remove tool [3].
Refit:
- The top cover (1).
- The accessories belt
(see corresponding operation).
- The exhaust line
(see corresponding operation).
- The front RH splash-shield.
- The front RH wheel.
XSARA
Angl.-t2-page135-239-2005 9/01/06 10:14 Page 239
Page 246 of 462
Downloaded from www.Manualslib.com manuals search engine 240
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1]Flywheel setting peg: (-).0194.C
[2] Camshaft setting peg: (-).0194.B
[3] Crankshaft setting peg: (-).0194.A
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Checking and setting the timing.
Raise and support the vehicle, wheels hanging.
Disconnect the battery.
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line at the catalytic converter flexible pipe.
- Disconnect the connecteur at «a».
Remove the accessories drive belt
(see corresponding operation).
Support the engine with a roller jack equipped with a block.
Remove the four screws (5), the three screws (4)and the engine supports (3).
B1BP38TD
B1BP38UD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 240
Page 248 of 462
![Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 242
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Checking the timing (continued).
Peg the camshaft at «c», using tool [2]
(oil t Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 242
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Checking the timing (continued).
Peg the camshaft at «c», using tool [2]
(oil t](/manual-img/9/4138/w960_4138-247.png)
Downloaded from www.Manualslib.com manuals search engine 242
ENGINECHECKING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Checking the timing (continued).
Peg the camshaft at «c», using tool [2]
(oil the pegs).
WARNING: The magnetic track should not show any sign of damage and should not be
approached by any other magnetic source.
Peg the crankshaft at «d», using tool [3].
ESSENTIAL: Should it not be possible to peg the camshaft, check that the offset between
the camshaft pinion hole and the pegging hole is not more than 1 mm. If it is more, repeat
the operation to position the timing belt
(see corresponding operation).
Note : The index «e»of the dynamic tensioner roller should be centred in the interval «f».
Check the correct positioning of the index «e».
If it is not correct, repeat the operation to tension the timing belt
(see corresponding operation).
Remove tools [2]and [3].
Refitting.
Peg the flywheel at «b», using tool [1].
Remove the screw (8).
Refit the upper timing cover (11), lower timing cover (10), the accessories drive pulley (9), the screw (8).
Tightening method for the screw (8):
- Pre-tighten to 3 ± 0,3 m.daN.- Angular tighten: 180° ± 5°.
Remove the tool [1]and complete the refitting.
IMPERATIVE: Carry out the operations that are necessary following a reconnection of the battery
(see corresponding operation).
B1EP1HKC
B1EP1E5C
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 242
Page 249 of 462
Downloaded from www.Manualslib.com manuals search engine 243
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HX - 9HY - 9HZ
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
IMPERATIVE: Respect the safety and cleanliness requirements specific to High pressure Diesel
injection (HDi) engine versions.
Checking and setting the timing.
Raise and support the vehicle, wheels hanging.
Disconnect the battery.
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line at the flexible pipe.
- Disconnect the connecteur at «a».
Remove the accessories drive belt
(see corresponding operation).
Support the engine with a roller jack equipped with a block.
Remove the four screws (5), the three screws (4)and the engine supports (3).
B1BP38TD
B1BP38UD
C4
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 243
Page 255 of 462
Downloaded from www.Manualslib.com manuals search engine 249
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
B1BP304D
Tools.
[1] Flywheel setting peg: (-).0194.C
[2]Camshaft setting peg: (-).0194.B
[3]Crankshaft setting peg: (-).0194.A
Checking and setting the timing.
Removing.
Raise and support the vehicle, wheels hanging.
Disconnect the positive and negative terminals of the battery.
Remove:
- The front RH wheel.
- The front RH splash-shield.
- The accessories drive belt
(see corresponding operation).
Uncouple:
- The fuel supply unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
- The exhaust line
(at the flexible pipe).
Disconnect the connecter at «a».
Remove and move aside the power steering fluid reservoir (6).
Uncouple, plug and move aside the tube (2).
Support the engine with a roller jack equipped with a block.
Remove the engine supports (4)and (5).
XSARA PICASSO
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 249
Page 258 of 462
![Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The uppe Citroen BERLINGO 2005 1.G Workshop Manual Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The uppe](/manual-img/9/4138/w960_4138-257.png)
Downloaded from www.Manualslib.com manuals search engine 252
ENGINECHECKING AND SETTING THE VALVE TIMING
Engines: 9HZ - 9HY
Refitting.
Refit tool [1]at «b».
Remove the screw (10).
Refit:
- The upper timing cover (12).
- The lower timing cover (11).
- The accessories drive pulley (9).
- The screw (10).
Tightening torque
Screw (10)Pre-tighten to : 3 ± 0,3 m.daN.
Angular tighten : 180° ± 5°.
Remove tool [1].
Refit:
- The engine support (8), tighten to 5,5 ± 0,4 m.daN.
- The engine support (4), tighten to 6,1 ± 0,6 m.daN.
- The engine support (5), tighten to 2,5 ± 0,2 m.daN.
- The electrical harness (7).
- The power steering fluid reservoir (6).
XSARA PICASSO
Couple:
- The tube (2).
- The exhaust line, tighten the clip to 2,5 ± 0,3 m.daN.
- The fuel unions (1).
- The air/air heat exchanger inlet and outlet pipes (3).
Connect the connector at «a».
Refit:
- The accessories drive belt
(see corresponding operation).
- The front RH splash-shield (see corresponding operation).
- The front RH wheel, tighten to 9 ± 1 m.daN.
- Reconnect the positive and negative terminals of the battery.
IMPERATIVE: Perform the operations that are necessary following
a reconnection of the battery
(see corresponding operation).
Angl.-t2-page240-282-2005 9/01/06 10:16 Page 252