4 - 67
ENGCAMSHAFTS
Fit the timing chain
3 onto both
camshaft sprockets and install
the camshafts on the cylinder
head.
NOTE:The camshafts should be installed
onto the cylinder head so that the
punch mark
c on the exhaust
camshaft and the punch mark
d
on the intake camshaft must align
with the cylinder head surface, as
shown in the illustration.
CAUTION:
Do not turn the crankshaft dur-
ing the camshaft installation.
Damage or improper valve tim-
ing will result.
Install the clips, camshaft caps
4 and bolts (camshaft cap)
5.
T R..
Bolt (camshaft cap):
10 Nm
(1.0 m kg, 7.2 ft lb)
NOTE:Before removing the clips, cover
the cylinder head with a clean
rag to prevent the clips from into
the cylinder head cavity.
Apply the engine oil on the
thread and contact surface of the
bolts (camshaft cap).
Tighten the bolts (camshaft cap)
in a crisscross pattern.
CAUTION:
The bolts (camshaft cap) must
be tightened evenly, or damage
to the cylinder head, camshaft
caps, and camshaft will result.
2. Install:
Timing chain tensioner
Installation steps:
While pressing the tensioner
rod lightly with fingers, use a
thin screwdriver and wind the
tensioner rod up fully clockwise.
Placer la chaîne de distribution 3
sur les deux pignons d’arbre à
cames et installer les arbres à
cames dans la culasse.
N.B.:
Monter les arbres à cames dans la
culasse en veillant à ce que le repère
poinçonné c de l’arbre à cames
d’échappment et le repère poinçonné
d de l’arbre à cames d’admission
s’alignent sur la surface de la culasse,
comme illustré.
ATTENTION:
Ne pas faire tourner le vilebrequin
pendant la mise en place des arbres
à cames. Cela risquerait d’entraî-
ner une mauvaise synchronisation
des soupapes et de les endomma-
ger.
Monter, les clips les et chapeaux
d’arbre à cames 4 et les boulons
(chapeau d’arbre d’cames) 5.
T R..
Boulon (chapeau d’arbre à
cames):
10 Nm
(1,0 m kg, 7,2 ft lb)
N.B.:
Avant de retirer les clips, couvrir la
culasse d’un chiffon propre pour
empêcher qu’ils ne tombent dans la
cavité de la culasse.
Appliquer de l’huile moteur sur
toute la surface des boulons (cha-
peau d’arbre à cames).
Serrer les boulons (chapeau d’arbre
à cames) en suivant un ordre entre-
croisé.
ATTENTION:
Il importe de serrer les boulons
(chapeau d’arbre à cames) unifor-
mément pour éviter d’endomma-
ger la culasse, les chapeaux d’arbre
à cames et l’arbre à cames.
2. Monter:
Tendeur de la chaîne de distribu-
tion
Etapes du montage:
Tout en comprimant légèrement la
tige du tendeur à l’aide du doigt, la
visser complètement (tourner dans
le sens des aiguilles d’une montre)
en se servant d’un tournevis fin.
ARBRES A CAMES
4 - 69
ENGCAMSHAFTS
3. Turn:
Crankshaft
Counterclockwise several
turns.
4. Check:
Rotor T.D.C. mark
Align with the crankcase align
mark.
Camshaft match marks
Align with the cylinder head
surface.
Out of alignment
→ Adjust. With the rod fully wound and the
chain tensioner UP mark
a fac-
ing upward, install the gasket
1
and the timing chain tensioner
2, and tighten the bolt
3 to the
specified torque.
T R..
Bolt (timing chain
tensioner):
10 Nm
(1.0 m kg, 7.2 ft lb)
Release the screwdriver, check
the tensioner rod to come out
and tighten the gasket
4 and
the cap bolt
5 to the specified
torque.
T R..
Tensioner cap bolt:
7 Nm
(0.7 m kg, 5.1 ft lb)
5
4New
5. Install:
Timing mark accessing screw
1
Crankshaft end accessing
screw
2
6. Install:
Timing chain guide (top side)
1
Cylinder head cover gasket
2
Cylinder head cover
3
Bolt (cylinder head cover)
4
NOTE:Apply the sealant on the cylinder
head cover gasket.
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
Quick gasket®:
ACC-QUICK-GS-KT
YAMAHA Bond No. 1215:
90890-85505
3. Tourner:
Vilebrequin
De quelques tours dans le sens
inverse des aiguilles d’une mon-
tre.
4. Contrôler:
Repère de PMH du rotor
Aligner sur l’index fixe du carter.
Repères aligner sur d’alignement
de l’arbre à cames la surface de la
culasse.
Non alignés → Régler. La tige complètement vissée et le
repère UP a du tendeur de chaîne
orienté vers le haut, monter le joint
1 et le tendeur de chaîne 2, puis
serrer le boulon 3 au couple spé-
cifié.
T R..
Boulon (tendeur de chaîne
de distribution):
10 Nm
(1,0 m kg, 7,2 ft lb)
Relâcher le tournevis, s’assurer
que la tige du tendeur sort, puis
serrer le joint 4
et le boulon capu-
chon 5 au couple spécifié.
T R..
Boulon capuchon de
tendeur de chaîne de
distribution:
7 Nm
(0,7 m kg, 5,1 ft lb)
5. Monter:
Vis d’accès du repère de distribu-
tion 1
Vis d’accès de l’extrémité de
vilebrequin 2
6. Monter:
Guide de chaîne de distribution
(côté supérieur) 1
Joint de couvre-culasse 2
Couvre-culasse 3
Boulon (couvre-culasse) 4
N.B.:
Enduire le joint du couvre-culasse de
pâte d’étanchéité.
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
Quick gasket®:
ACC-QUICK-GS-KT
YAMAHA Bond n° 1215:
90890-85505
ARBRES A CAMES
4 - 125
ENGCLUTCH
EC4A3000REMOVAL POINTS
Clutch boss
1. Remove:
Nut
1
Lock washer
2
Clutch boss
3
NOTE:Straighten the lock washer tab and
use the clutch holding tool
4 to hold
the clutch boss.
ÈFor USA and CDN
ÉExcept for USA and CDN
Clutch holding tool:
YM-91042/90890-04086
ÈÉ
EC4A4000INSPECTIONEC484100Clutch housing and boss
1. Inspect:
Clutch housing
1
Cracks/wear/damage
→
Replace.
Clutch boss
2
Scoring/wear/damage
→
Replace.
EC484201Primary driven gear
1. Check:
Circumferential play
Free play exists
→ Replace.
Gear teeth
a
Wear/damage
→ Replace.
Clutch spring
1. Measure:
Clutch spring free length
a
Out of specification
→
Replace springs as a set.
Clutch spring free
length:
37.0 mm (1.46 in)
36.0 mm (1.42 in)
POINTS DE DEPOSE
Noix d’embrayage
1. Déposer:
Ecrou 1
Rondelle-frein 2
Noix d’embrayage 3
N.B.:
Redresser la rondelle-frein et utiliser
l’outil de poignée d’embrayage 4 pour
maintenir la noix d’embrayage.
È
USA et CDN
É
Excepté USA et CDN
Outil de poignée
d’embrayage:
YM-91042/90890-04086
CONTROLE
Cloche et noix d’embrayage
1. Contrôler:
Cloche d’embrayage 1
Craquelures/usure/endommage-
ment → Ramplacer.
Noix d’embrayage 2
Rayures/usure/endommagement
→ Ramplacer.
Pignon mené primaire
1. Contrôler:
Jeu circonférentiel
Jeu → Ramplacer.
Dent
a
Usure/endommagement → Ram-
placer.
Ressort d’embrayage
1. Mesurer:
Longueur libre de ressort
d’embrayage
a
Hors spécification → Ramplacer
tous les ressorts.
Longueur libre de ressort
d’embrayage:
37,0 mm (1,46 in)
36,0 mm (1,42 in)
EMBRAYAGE
4 - 129
ENGCLUTCH
EC4A5000ASSEMBLY AND INSTALLATION
Push lever shaft
1. Install:
Push lever shaft
1
Bolt (push lever shaft)
2
NOTE:Apply the lithium soap base grease
on the oil seal lip.
Apply the engine oil on the push
lever shaft.
Fit the seat plate
3 in the groove
a of the push lever shaft and
tighten the bolt (seat plate).
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
3
1a2
Clutch
1. Install:
Primary driven gear
1
Thrust washer
2
Clutch boss
3
NOTE:Apply the engine oil on the primary
driven gear inner circumference.
2. Install:
Lock washer
1
Nut (clutch boss)
2
NOTE:Use the clutch holding tool
3 to hold
the clutch boss.
ÈFor USA and CDN
ÉExcept for USA and CDN
T R..60 Nm (6.0 m · kg, 43 ft · lb)
Clutch holding tool:
YM-91042/90890-04086
New
ÈÉ
3. Bend the lock washer
1 tab.
ASSEMBLAGE ET MONTAGE
Arbre de levier de poussée
1. Monter:
Arbre de levier de poussée 1
Boulon (arbre de levier de pous-
sée) 2
N.B.:
Enduire la lèvre de la bague d’étan-
chéité de graisse à base de savon au
lithium.
Enduire l’arbre de levier de poussée
d’huile moteur.
Asseoir le siège 3 dans la gorge
a
du arbre de levier de poussée et serrer
le boulon (siège).
T R..10 Nm (1,0 m · kg, 7,2 ft · lb)
Embrayage
1. Monter:
Pignon mené primaire 1
Rondelle de butée 2
Noix d’embrayage 3
N.B.:
Enduire la circonférence intérieure du
pignon d’huile de moteur.
2. Monter:
Rondelle-frein 1
Ecrou (noix d’embrayage) 2
N.B.:
Utiliser l’outil de poignée d’embrayage
3 pour maintenir la noix d’embrayage.
È
USA et CDN
É
Excepté USA et CDN
T R..60 Nm (6,0 m · kg, 43 ft · lb)
Outil de poignée
d’embrayage:
YM-91042/90890-04086
New
3. Courber la languette de la rondelle-
frein 1.
EMBRAYAGE
4 - 151
ENGBALANCER
BALANCER
Extent of removal:
1 Balancer shaft drive gear
2 Balancer shaft
Extent of removal Order Part name Q’ty Remarks
BALANCER REMOVAL
Preparation for removal Primary driven gear Refer to “CLUTCH” section.
Right crankcase cover Refer to “OIL FILTER ELEMENT, WATER PUMP
AND RIGHT CRANKCASE COVER” section.
Stator Refer to “AC MAGNETO AND STARTER CLUTCH”
section.
1 Nut (primary drive gear) 1
Refer to “REMOVAL POINTS”.
2 Nut (balancer shaft driven gear) 1
3 Lock washer 1
4 Primary drive gear 1
5 Balancer shaft drive gear 1
6 Lock washer 1
7 Balancer shaft driven gear 1
8 Balancer shaft 1 Refer to “REMOVAL POINTS”.
1
2
2
4 - 155
ENGBALANCER
REMOVAL POINTS
Balancer shaft drive gear and
balancer shaft driven gear
1. Straighten the lock washer tab.
2. Loosen:
Nut (primary drive gear)
1
Nut
(balancer shaft driven gear)
2
NOTE:Place an aluminum plate
a between
the teeth of the balancer shaft drive
gear
3 and driven gear
4.
Balancer shaft
1. Remove:
Balancer shaft
1
NOTE:When removing the balancer shaft,
align the center
a of the balancer
shaft weight along the line connect-
ing the centers of the crankshaft and
balancer shaft.
INSPECTION
Primary drive gear, balancer shaft
drive gear and balancer shaft
driven gear
1. Inspect:
Primary drive gear
1
Balancer shaft drive gear
2
Balancer shaft driven gear
3
Wear/damage
→ Replace.
Balancer shaft
1. Inspect:
Balancer shaft
Cracks/damage
→ Replace.
POINTS DE DEPOSE
Pignon menant et pignon mené du
balancier
1. Redresser l’ongle de rondelle
d’arrêt.
2. Desserrer:
Ecrou
(pignon menant primaire) 1
Ecrou
(pignon mené de balancier) 2
N.B.:
Placer une plaquette en aluminium a
entre les dents du pignon menant 3 et le
pignon mené 4 du balancier.
Balancier
1. Déposer:
Balancier 1
N.B.:
Avant de déposer l’arbre de balancier,
aligner le centre a du poids de l’arbre
de balancier avec la ligne reliant le cen-
tre du vilebrequin et le centre de l’arbre
de balancier.
CONTROLE
Pignon menant primaire, pignon
menant et pignon mené du balancier
1. Contrôler:
Pignon menant primaire 1
Pignon menant du balancier 2
Pignon mené du balancier 3
Usure/endommagement → Rem-
placer.
Balancier
1. Contrôler:
Balancier
Craquelures/endommagement →
Remplacer.
BALANCIER
4 - 156
ENG
AUSBAU
Ausgleichswellen-Antriebs- und -
Abtriebsräder
1. Die Lasche der Sicherungs-
scheibe umbiegen.
2. Lockern:
Mutter (Primärantriebsrad)
1
Mutter (Ausgleichswelle-
Abtriebsrad)
2
HINWEIS:
Ein Stückchen Aluminium
a zwi-
schen die Zähne des Ausgleichswel-
len-Antriebsrades
3 und
Ausgleichswellen-Abtriebrades
4
legen.
Ausgleichswelle
1. Demontieren:
Ausgleichswelle
1
HINWEIS:
Beim Ausbau der Ausgleichswelle
muß sich das Ausgleichsgewicht mit-
tig
a auf der Fluchtlinie zwischen
den Mittelpunkten der Nockenwellen-
und Ausgleichswellen-Enden befin-
den.
PRÜFUNG
Primär- und Ausgleichswellen-
Antriebs- und -Abtriebsräder
1. Kontrollieren:
Primärantriebsrad
1
Ausgleichswellen-Antriebsrad
2
Ausgleichswellen-Abtriebsrad
3
Verschleiß/Beschädigung
→
Erneuern.
Ausgleichswelle
1. Kontrollieren:
Ausgleichswelle
Rißbildung/Beschädigung
→
Erneuern.PUNTI DI RIMOZIONE
Ingranaggio conduttore della
transmissione primaria e ingranaggio
condotto dell’albero di equilibratura
1. Spianare la linguetta della rondella
di bloccaggio.
2. Allentare:
Dado (ingranaggio conduttore
della trasmissione primaria) 1
Dado (ingranaggio condotto
dell’albero di equilibratura) 2
NOTA:
Inserire una piastra di alluminio a tra i
denti dell’ingranaggio conduttore 3 e
l’ingranaggio condotto 4 dell’albero di
equilibratura.
Albero di equilibratura
1. Rimuovere:
Albero di equilibratura 1
NOTA:
Nel rimuovere l’albero di equilibratura,
allineare il centro del peso dell’albero di
equilibratura a lungo la linea che col-
lega i punti centrali dell’albero motore e
dell’albero di equilibratura.
ISPEZIONE
Ingranaggio conduttore della trasmis-
sione primaria, ingranaggio condut-
tore dell’albero di equilibratura e
ingranaggio condotto dell’albero di
equilibratura
1. Ispezionare:
Ingranaggio conduttore della tra-
smissione primaria 1
Ingranaggio conduttore
dell’albero di equilibratura 2
Ingranaggio condotto dell’albero
di equilibratura 3
Usura/danno → Sostituire.
Albero di equilibratura
1. Ispezionare:
Albero di equilibratura
Incrinature/danno → Sostituire.PUNTOS DE EXTRACCIÓN
Engranaje de accionamiento del
eje del compensador y engranaje
impulsado del eje del compensa-
dor
1. Enderece la lengüeta de la aran-
dela de freno.
2. Aflojar:
Tuerca (engranaje de acciona-
miento primario)
1
Tuerca (engranaje impulsado
del eje del compensador)
2
NOTA:
Coloque una plancha de aluminio
a
entre el diente del engranaje de
accionamiento del eje del compensa-
dor
3 y el engranaje impulsado
4.
Eje del compensador
1. Extraer:
Eje del compensador
1
NOTA:
Cuando extraiga el eje del compen-
sador, alinee el centro
a del peso
del eje del compensador a través de
la línea conectando los centros del
cigüeñal y el eje del compensador.
INSPECCIÓN
Engranaje de accionamiento pri-
mario, engranaje de acciona-
miento del eje del compensador y
engranaje impulsado del eje del
compensador
1. Inspeccionar:
Engranaje de accionamiento
primario
1
Engranaje de accionamiento
del eje del compensador
2
Engranaje impulsado del eje
del compensador
3
Desgaste/daños
→ Reempla-
zar.
Eje del compensador
1. Inspeccionar:
Eje del compensador
Grietas/daños
→ Reemplazar.
AUSGLEICHSWELLE
BILANCIERE
COMPENSADOR
4 - 157
ENGBALANCER
ASSEMBLY AND INSTALLATION
Balancer shaft, balancer shaft
drive gear and balancer shaft
driven gear
1. Install:
Balancer shaft
1
NOTE:Apply the engine oil on the bear-
ing.
When installing the balancer shaft,
align the center
a of the balancer
shaft weight along the line con-
necting the centers of the crank-
shaft and balancer shaft.
2. Install:
Balancer shaft driven gear
1
NOTE:Install the balancer shaft driven gear
onto the balancer shaft while aligning
the punch mark
a on the balancer
shaft driven gear with the lower
spline
b on the balancer shaft end.
3. Install:
Balancer shaft drive gear
1
NOTE:Align the punched mark
a on the
balancer shaft drive gear with the
punched mark
b on the balancer
shaft driven gear
2.
Align the punched mark
c on the
balancer shaft drive gear with the
lower spline
d on the crankshaft
end.
4. Install:
Lock washer
1
Nut
(balancer shaft driven gear)
2
Primary drive gear
3
Nut (primary drive gear)
4
NOTE:Install the primary drive gear with
its stepped side
a facing the
engine.
Place an aluminum plate
b
between the teeth of the balancer
shaft drive gear
5 and driven gear
6.
5. Bend the lock washer tab.
T R..50 Nm (5.0 m · kg, 36 ft · lb)
T R..75 Nm (7.5 m · kg, 54 ft · lb)
ASSEMBLAGE ET INSTALLATION
Balancier, pignon menant et pignon
mené du balancier
1. Monter:
Balancier 1
N.B.:
Enduire le roulement d’huile moteur.
Avant d’installer l’arbre de balancier,
aligner le centre a du poids de l’arbre
de balancier avec la ligne reliant le
centre du vilebrequin et le centre de
l’arbre de balancier.
2. Monter:
Pignon mené du balancier 1
N.B.:
Monter le pignon mené du balancier sur
le balancier en veillant à aligner le repère
poinçonné a du pignon et la carrelure
inférieure b de l’extrémité du balancier.
3. Monter:
Pignon menant du balancier 1
N.B.:
Aligner le repère poinçonné a sur le
pignon menant du balancier avec le
repère poinçonné b sur le pignon
mené du balancier 2.
Aligner le repère poinçonné c sur le
pignon menant de balancier et la
saillie d sur l’extrémité de vilebre-
quin.
4. Monter:
Rondelle frein 1
Ecrou
(pignon mené de balancier) 2
Pignon menant primaire 3
Ecrou
(pignon menant primaire) 4
N.B.:
Monter le pignon menant primaire en
dirigeant son côté à l’avancée a vers
le moteur.
Placer une plaquette en aluminium b
entre les dents du pignon menant 5 et
le pignon mené 6 du balancier.
5. Replier l’ongle de rondelle d’arrêt.
T R..50 Nm (5,0 m · kg, 36 ft · lb)
T R..75 Nm (7,5 m · kg, 54 ft · lb)
BALANCIER