YH4
GRAND
VITARA
7E-14 DIFFERENTIAL (FRONT)
1. Mounting bracket R
2. Mounting bracket L
1. Bolt and nut
2. Differential carrier
3. Cross member
4. Bolt
5. Differential rear mounting assembly
7) Position each bush to bracket as shown.
Length ªaº: 3.0 mm (0.12 in.)
8) Use following torque for reinstallation.
Tightening Torque
(a): 85 N
.m (8.5 kg-m, 61.5 lb-ft)
(b): 50 N
.m (5.0 kg-m, 36.5 lb-ft)
REAR MOUNTING
(For front differential carrier)
1) Lift up vehicle and remove mounting assembly by removing 2
bolts and nuts from differential carrier side and 2 bolts from cross
member side.
2) Check mounting rubber for damage or deterioration and replace
as necessary.
3) Use following torque for reinstallation.
Tightening Torque
(a): 50 N
.m (5.0 kg-m, 36.5 lb-ft)
YH4
GRAND
VITARA
10B-64 AIR BAG SYSTEM
ACCIDENT WITH OR WITHOUT DEPLOYMENT ± COM-
PONENT INSPECTIONS
Certain air bag and restraint system components must be in-
spected after any crash, whether the air bag deployed or not.
Those components are:
Steering column and shaft joints
± Check for length, damage and bend according to ªChecking
Steering Column for Accident Damageº in SECTION 3C1.
Steering column bracket and capsules
± Check for damage and bent.
If any faulty condition is found in above checks, replace faulty
part.
Steering wheel and driver air bag (inflator) module
± Check for damage or air bag (inflator) module fitness.
± Check trim cover (pad surface) for cracks.
± Check wire harness and connector for damage or tightness.
If any faulty condition is found in above checks, replace faulty
part.
Contact coil and combination switch assembly
± Check wire harness and connectors for damage or tightness.
± Check contact coil case for damage.
If any faulty condition is found in above checks, replace.
Instrument panel member and reinforcement
± Check for any distortion, bending, cracking or other damage.
If any faulty condition is found in above checks, replace.
YH4
GRAND
VITARA
4
31
2
2
4
31
For driver air bag (inflator) module
For passenger air bag (inflator) module
1. Stretch deployment harness to full length 10 m (33 ft).
2. Connect connectors.
3. Power source (12V vehicle battery).
4. Short the two deployment harness leads.
10B-74 AIR BAG SYSTEM
7) Stretch the deployment harness from the driver or passenger
air bag (inflator) module to its full length 10 m (33 ft).
8) Place a power source near the shorted end of the deployment
harness. Recommended application: 12 Volts minimum, 2
amps minimum. A vehicle battery is suggested.
9) Verify that the area around the driver or passenger air bag (in-
flator) module is clear of all people and loose or flammable ob-
jects.
10) [In case of Driver Air Bag (Inflater) Module]
Verify that the driver air bag (inflator) module is resting with its
vinyl trim cover facing up.
[In case of Passenger Air Bag (Inflator) Module]
Verify that the passenger air bag (inflator) module is firmly and
properly secured in passenger air bag (inflator) module deploy-
ment fixture (special tool).
11) Connect the driver or passenger air bag (inflator) module to the
deployment harness connector and lock connector with lock le-
ver.
12) Notify all people in the immediate area that you intend to deploy
the air bag (inflator) module.
NOTE:
When the air bag deploys, the rapid gas expansion will
create a substantial report. Wear suitable ear protection.
Notify all people in the immediate area that you intend to
deploy the air bag (inflator) module and suitable ear
protection should be worn.
When the air bag deploys, the driver air bag (inflator)
module may jump about 30 cm (1 ft) vertically. This is a
normal reaction of the driver air bag (inflator) module to
the force of the rapid gas expansion inside the air bag.
After the air bag (inflator) module has been deployed, the
surface of the air bag may contain a powdery residue.
This powder consists primarily of cornstarch (used to lu-
bricate the bag as it inflates) and byproducts of the
chemical reaction.
YH4
GRAND
VITARA
Driver side for left hand steering vehicle
Driver side for right hand steering vehicle
1. Stretch deployment harness to its full length
10 m (33 ft).
2. Drop cloth, blanket or similar item2
10B-80 AIR BAG SYSTEM
8) Route deployment harness out the vehicle.
9) Verify that the inside of the vehicle and the area surrounding
the vehicle are clear of all people and loose or flammable ob-
jects.
10) Stretch the deployment harness to its full length 10 m (33 ft).
11) Place a power source near the shorted end of the deployment
harness. Recommended application: 12 Volts minimum, 2
amps minimum. A vehicle battery is suggested.
12) Completely cover windshield area and front door window
openings with a drop cloth, blanket to similar item. This reduces
the possibility of injury due to possible fragmentation of the ve-
hicle's glass or interior.
13) Notify all people in the immediate area that you intend to deploy
the air bag (inflator) module.
NOTE:
When the air bag deploys, the rapid gas expansion will
create a substantial report. Wear suitable ear protection.
Notify all people in the immediate area that you intend to
deploy the air bag (inflator) module and suitable ear
protection should be worn.
After the air bag (inflator) module has been deployed, the
surface of the air bag may contain a powdery residue.
This powder consists primarily of cornstarch (used to lu-
bricate the bag as it inflates) and byproducts of the
chemical reaction.
WARNING:
Safety precautions must be observed when handling a
deployed air bag (inflator) module.
After deployment, the metal surfaces of the air bag (infla-
tor) module will be very hot. Do not touch the metal areas
of the air bag (inflator) module for about 30 minutes after
deployment.
Do not apply water, oil, etc. to deployed air bag (inflator)
module.
If the deployed air bag (inflator) module must be moved
before it is cool, wear gloves and handle by the air bag or
vinyl trim.
Failure to follow procedures may result in fire or personal
injury.
YH4
GRAND
VITARA
1. Stretch it to full length 10m (33 ft).
2. Power source (12V vehicle battery)
3. Connect one banana plug to positive terminal of power
source (12V vehicle battery) and then the other to
negative terminal to immediately deploy.
4. Short harness leads after deployment.
5. Drop cloth, blanket or similar them
5
AIR BAG SYSTEM 10B-81
14) Separate the two banana plugs on the deployment harness.
15) Connect the deployment harness to the power source (12 V ve-
hicle battery) to immediately deploy the driver or passenger air
bag.
16) Disconnect the deployment harness from the power source (12
V vehicle battery) and short the two deployment harness leads
together by fully seating one banana plug into the other.
17) Put on a pair of shop gloves to protect your hands from possible
irritation and heat when handling the deployed air bag (inflator)
module.
NOTE:
As a precaution, gloves and safety glasses are recom-
mended to prevent any possible irritation of the skin or
eyes.
18) Disconnect the deployment harness from the air bag (inflator)
module as soon after deployment as possible. This will prevent
damage to the deployment harness due to possible contact
with the hot air bag (inflator) module canister. The deployment
harness are designed to be reused. They should, however, be
inspected for damage after each deployment and replaced if
necessary.
19) Carefully remove drop cloth from vehicle and clean off any frag-
ments or discard drop cloth entirely.
20) Repeat Steps 2) through 19) to deploy driver or passenger air
bag (inflator) module which has not been deployed, if any.
YH4
GRAND
VITARA
1. Seat belt pretensioner (retractor assembly)
2. Webbing
3. 185 cm (6 ft) of clearance
4. Exhaust hole
1. Stretch deployment harness to full length 10 m (33 ft).
2. Connect connectors.
3. Power source (12V vehicle battery)
4. Short the two deployment harness leads.
5. Seat belt pretensioner harness
4
AIR BAG SYSTEM 10B-85
6) Pull out the webbing fully as shown at the left and cut it at the
root of the pretensioner (retractor assembly) as shown in the
figure.
WARNING:
As the drum of the retractor assembly turns very quick-
ly as soon as the webbing is cut, fix the retractor assem-
bly with a vise on the workbench and keep your hands
and fingers away from it when cutting the webbing.
7) Clear a space on the ground about 185 cm (6 ft) in diameter
where the seat belt pretensioner is to be activated. A paved,
outdoor location where there is no activity is preferred. If an out-
door location is not available, a space on the shop floor where
there is no activity and sufficient ventilation is recommended.
Ensure no loose or flammable objects are within the activation
area.
8) Place the seat belt pretensioner as shown in the figure on the
ground in the space just cleared.
9) Stretch the deployment harness from the seat belt pretension-
er to its full length 10 m (33 ft).
10) Place a power source near the shorted end of the deployment
harness. Recommended application: 12 Volts minimum, 2
amps minimum. A vehicle battery is suggested.
11) Verify that the area around the seat belt pretensioner is clear
of all people and loose or flammable objects.
12) Verify that the seat belt pretensioner is placed as shown in the
figure on the ground in the space just cleared.
13) Connect the seat belt pretensioner harness to the deployment
harness connector and lock the connector with lock lever.
Special Tool
(A): 09932-75030
YH4
GRAND
VITARA
1. Shorted
Driver side for left hand steering vehicle
Driver side for right hand steering vehicle
1. Stretch deployment harness
to its full length 10 m (33 ft).
2. Drop cloth, blanket or similar item.
10B-90 AIR BAG SYSTEM
5) Check that there is no open/short or damage in special tool (de-
ployment harness). If any faulty condition is found, do not use
it and be sure to use new deployment harness.
Special Tool
(A): 09932-75030
6) Short the two deployment harness leads together by fully seat-
ing one banana plug into the other.
WARNING:
Deployment wires shall remain shorted and not be con-
nected to a power source until the pretensioner is to be
activated.
Special Tool
(A): 09932-75030
7) Connect the deployment harness connector to the seat belt
pretensioner harness and lock the connector with lock lever.
Special Tool
(A): 09932-75030
8) Route deployment harness out the vehicle.
9) Verify that the inside of the vehicle and the area surrounding
the vehicle are clear of all people and loose or flammable ob-
jects.
10) Stretch the deployment harness to its full length 10 m (33 ft).
11) Place a power source near the shorted end of the deployment
harness. Recommended application: 12 Volts minimum, 2
amps minimum. A vehicle battery is suggested.
12) Completely cover windshield area and front door window
openings with a drop cloth, blanket to similar item. This reduces
the possibility of injury due to possible fragmentation of the ve-
hicle's glass or interior.
13) Notify all people in the immediate area that you intend to acti-
vate the seat belt pretensioner.
YH4
GRAND
VITARA
1. Stretch it to full length 10m (33 ft).
2. Power source (12V vehicle battery)
3. Connect one banana plug to positive terminal of power
source (12V vehicle battery) and then the other to
negative terminal to immediately activate.
4. Short harness leads after activation.
5. Drop cloth, blanket or similar them.
AIR BAG SYSTEM 10B-91
NOTE:
When the pretensioner activates, the rapid gas expansion
will create a substantial report. Wear suitable ear protec-
tion. Notify all people in the immediate area that you intend
to activate the seat belt pretensioner and suitable ear
protection should be worn.
WARNING:
Safety precautions must be observed when handling an
activated seat belt pretensioner.
After activation, the metal surfaces of the seat belt
pretensioner will be very hot. Do not touch the metal
areas of the seat belt pretensioner for about 30 min-
utes after activation.
Do not apply water, oil, etc. to activated seat belt pre-
tensioner.
If the activated seat belt pretensioner must be moved
before it is cool, wear gloves and handle by using non-
metal material.
Failure to follow procedures may result in fire or per-
sonal injury.
14) Separate the two banana plugs on the deployment harness.
15) Connect the deployment harness to the power source (12 V ve-
hicle battery) to immediately activate the pretensioner.
16) Disconnect the deployment harness from the power source (12
V vehicle battery) and short the two deployment harness leads
together by fully seating one banana plug into the other.