HEADLAMP (FOR USA)
LT-19
C
D
E
F
G
H
I
J
L
MA
B
LT
Revision: August 20072004 QX56
4. Touch “HEAD LAMP” on “SELECT TEST ITEM” screen.
WORK SUPPORT
Operation Procedure
1. Touch “HEAD LAMP” on “SELECT TEST ITEM” screen.
2. Touch “WORK SUPPORT” on “SELECT DIAG MODE” screen.
3. Touch item on “SELECT WORK ITEM” screen.
4. Touch “START”.
5. Touch “CHANGE SETT”.
6. The setting will be changed and “CUSTOMIZING COMPLETED” will be displayed.
7. Touch “END”.
Display Item List
DATA MONITOR
Operation Procedure
1. Touch “HEAD LAMP” on “SELECT TEST ITEM” screen.
2. Touch “DATA MONITOR” on “SELECT DIAG MODE” screen.
3. Touch either “ALL SIGNALS” or “SELECTION FROM MENU” on the “SELECT MONITOR ITEM" screen.
4. Touch “START”.
5. When “SELECTION FROM MENU” is selected, touch individual items to be monitored. When “ALL SIG-
NALS” is selected, all the items will be monitored.
6. Touch “RECORD” while monitoring, then the status of the monitored item can be recorded. To stop
recording, touch “STOP”.
Display Item List
LKIA0183E
Item Description CONSULT-II Factory setting
BATTERY SAVER SETExterior lamp battery saver control mode can be changed
in this mode. Selects exterior lamp battery saver control
mode between ON/OFF.ON×
OFF —
ALL SIGNALS Monitors all the signals.
SELECTION FROM MENU Selects and monitors individual signal.
Monitor item Contents
IGN ON SW “ON/OFF” Displays “IGN position (ON)/OFF, ACC position (OFF)” judged from the ignition switch signal.
ACC ON SW “ON/OFF” Displays “ACC (ON)/OFF, Ignition OFF (OFF)” status judged from ignition switch signal.
HI BEAM SW “ON/OFF”Displays status (high beam switch: ON/Others: OFF) of high beam switch judged from lighting
switch signal.
HEAD LAMP SW 1 “ON/OFF”Displays status (headlamp switch 1: ON/Others: OFF) of headlamp switch 2 judged from light-
ing switch signal.
HEAD LAMP SW 2 “ON/OFF”Displays status (headlamp switch 2: ON/Others: OFF) of headlamp switch 2 judged from light-
ing switch signal.
LIGHT SW 1ST “ON/OFF”Displays status (lighting switch 1st position: ON/Others: OFF) of lighting switch judged from
lighting switch signal.
LT-24
HEADLAMP (FOR USA)
Revision: August 20072004 QX56
4. CHECK HEADLAMP INPUT SIGNAL
1. Turn ignition switch OFF.
2. Disconnect front combination lamp RH and LH connectors.
3. Turn ignition switch ON.
4. Select “IPDM E/R” on CONSULT-II, and select “ACTIVE TEST”
on “SELECT DIAG MODE” screen.
5. Select “EXTERNAL LAMPS” on “SELECT TEST ITEM” screen.
6. Touch “HI” on "ACTIVE TEST" screen.
7. When headlamp high beam is operating, check voltage between
front combination lamp RH and LH harness connector and
ground.
OK or NG
OK >> GO TO 6.
NG >> GO TO 5.
5. CHECK HEADLAMP CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect IPDM E/R connector.
3. Check continuity between IPDM E/R harness connector E123
terminal 56 (L/W) and front combination lamp RH harness con-
nector E107 terminal 6 (L/W).
4. Check continuity between IPDM E/R harness connector E123
terminal 55 (G) and front combination lamp LH harness connec-
tor E11 terminal 6 (G).
OK or NG
OK >> Replace IPDM E/R. Refer to PG-29, "Removal and Installation of IPDM E/R" .
NG >> Repair harness or connector.
6. CHECK HEADLAMP GROUND
1. Check continuity between front combination lamp RH harness
connector E107 terminal 2 (B) and ground.
2. Check continuity between front combination lamp LH harness
connector E11 terminal 2 (B) and ground.
OK or NG
OK >> Check front combination lamp connector for damage or
poor connection. Repair as necessary.
NG >> Repair harness or connector.
Front combination lamp
(–) Voltage (+)
ConnectorTe r m i n a l
(wire color)
RH E107 6 (L/W)
Ground Battery voltage
LH E11 6 (G)
WKIA1852E
56 (L/W) - 6 (L/W) : Continuity should exist.
55 (G) - 6 (G) : Continuity should exist.
WKIA1853E
2 (B) - Ground : Continuity should exist.
2 (B) - Ground : Continuity should exist.
WKIA1854E
HEADLAMP (FOR USA)
LT-25
C
D
E
F
G
H
I
J
L
MA
B
LT
Revision: August 20072004 QX56
Headlamp HI Does Not Illuminate (One Side)EKS007A1
1. BULB INSPECTION
Inspect inoperative headlamp bulb.
OK or NG
OK >> GO TO 2.
NG >> Replace headlamp bulb. Refer to LT- 3 2 , "
HEADLAMP (INNER SIDE), FOR HIGH BEAM" .
2. CHECK POWER TO HEADLAMP
1. Disconnect inoperative headlamp connector.
2. Turn the high beam headlamps ON.
3. Check voltage between inoperative headlamp terminal and
ground.
OK or NG
OK >> GO TO 3.
NG >> GO TO 4.
3. CHECK HEADLAMP GROUND
1. Turn the high beam headlamps OFF.
2. Check continuity between inoperative headlamp connector and
ground.
OK or NG
OK >> Check headlamp connector for damage or poor connec-
tion. Repair as necessary.
NG >> Repair open circuit in harness between inoperative headlamp and ground.
Front combination lamp
(–)Vo l ta g e
(Approx.) (+)
ConnectorTe r m i n a l
(wire color)
RH E107 6 (L/W)
Ground Battery voltage
LH E11 6 (G)
WKIA1852E
Front combination lamp
Continuity
ConnectorTe r m i n a l
(wire color)
RH E107
2 (B) Ground Yes
LH E11
WKIA1854E
HEADLAMP (FOR USA)
LT-27
C
D
E
F
G
H
I
J
L
MA
B
LT
Revision: August 20072004 QX56
3. CHECK IPDM E/R
1. Select “IPDM E/R” on CONSULT-II, and select “DATA MONI-
TOR” on “SELECT DIAG MODE” screen.
2. Make sure “HL LO REQ” turns ON when lighting switch is in
2ND position.
OK or NG
OK >> Replace IPDM E/R. Refer to PG-29, "Removal and
Installation of IPDM E/R" .
NG >> Replace BCM. Refer to BCS-19, "
Removal and Installa-
tion of BCM" .
4. CHECK HEADLAMP INPUT SIGNAL
1. Turn ignition switch OFF.
2. Disconnect front combination lamp RH and LH connectors.
3. Turn ignition switch ON.
4. Select “IPDM E/R” on CONSULT-II, and select “ACTIVE TEST” on “SELECT DIAG MODE” screen.
5. Select “EXTERNAL LAMPS” on “SELECT TEST ITEM” screen.
6. Touch “LO” on "ACTIVE TEST" screen.
7. When headlamp low beam is operating, check voltage between
front combination lamp RH and LH harness connector and
ground.
OK or NG
OK >> GO TO 6.
NG >> GO TO 5.
5. CHECK HEADLAMP CIRCUIT
1. Turn ignition switch OFF.
2. Disconnect IPDM E/R connector.
3. Check continuity between IPDM E/R harness connector E123
terminal 54 (R/Y) and front combination lamp RH harness con-
nector E107 terminal 5 (R/Y).
4. Check continuity between IPDM E/R harness connector E123
terminal 52 (L) and front combination lamp LH harness connec-
tor E11 terminal 5 (L).
OK or NG
OK >> Replace IPDM E/R. Refer to PG-29, "Removal and Installation of IPDM E/R" .
NG >> Repair harness or connector.When lighting switch is in
2ND position: HL LO REQ ON
SKIA5780E
Front combination lamp
(–) Voltage (+)
ConnectorTe r m i n a l
(wire color)
RH E107 5 (R/Y)
Ground Battery voltage
LH E11 5 (L)
WKIA1855E
54 (R/Y) - 5 (R/Y) : Continuity should exist.
52 (L) - 5 (L) : Continuity should exist.
WKIA1856E
LT-28
HEADLAMP (FOR USA)
Revision: August 20072004 QX56
6. CHECK HEADLAMP GROUND
1. Turn ignition switch OFF.
2. Check continuity between front combination lamp RH harness
connector E107 terminal 1 (B) and ground.
3. Check continuity between front combination lamp LH harness
connector E11 terminal 1 (B) and ground.
OK or NG
OK >> Check front combination lamp connector for damage or
poor connection, ballasts (HID control unit) and xenon
bulbs. Repair as necessary.
NG >> Repair harness or connector.
Headlamp LO Does Not Illuminate (One Side)EKS007A4
1. BULB INSPECTION
Inspect ballasts (HID control unit) and xenon bulb of inoperative headlamp bulb.
OK or NG
OK >> GO TO 2.
NG >>
(step1) Replace xenon bulb with other side bulb or new one. (If lamp illuminates correctly,
replace the xenon bulb).
(step2) Replace ballast (HID control unit) with other side ballast or new one. (If lamp illuminates
correctly, replace the ballast).
2. CHECK POWER TO HEADLAMP
1. Disconnect inoperative headlamp connector.
2. Turn the low beam headlamps ON.
3. Check voltage between inoperative headlamp connector termi-
nal and ground.
OK or NG
OK >> GO TO 3.
NG >> GO TO 4.1 (B) - Ground : Continuity should exist.
1 (B) - Ground : Continuity should exist.
WKIA1857E
Front combination lamp
(–)Vo ltag e
(Approx.) (+)
ConnectorTe r m i n a l
(wire color)
RH E107 5 (R/Y)
Ground Battery voltage
LH E11 5 (L)
WKIA1855E
LT-32
HEADLAMP (FOR USA)
Revision: August 20072004 QX56
If the vehicle front body has been repaired and/or the headlamp assembly has been replaced, check aiming.
Use the aiming chart shown in the figure.
Basic illuminating area for adjustment should be within the range shown on the aiming chart.
Adjust headlamps accordingly.
Bulb Replacement EKS007A7
HEADLAMP (OUTER SIDE), FOR LOW BEAM
1. Position fender protector aside.
2. Turn headlamp switch OFF.
3. Disconnect battery ground cable.
4. Remove ballast.
5. Disconnect the electrical connector.
6. Release bulb retaining spring and pull bulb straight out.
7. Installation is in the reverse order of removal.
HEADLAMP (INNER SIDE), FOR HIGH BEAM
1. Turn headlamp switch OFF.
2. Disconnect the electrical connector.
3. Turn the bulb counterclockwise to remove it.
4. Installation is in the reverse order of removal.
FRONT PARKING LAMP (INNER OR OUTER)
1. Turn the bulb socket counterclockwise to unlock it.
2. Pull the bulb to remove it from the socket.
3. Installation is in the reverse order of removal.
FRONT SIDE MARKER LAMP
1. Position fender protector aside.
2. Turn the bulb socket counterclockwise to unlock it.
3. Pull the bulb to remove it from the socket.
WKIA3894E
LT-42
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -
Revision: August 20072004 QX56
How to Proceed With Trouble DiagnosisEKS007AG
1. Confirm the symptom or customer complaint.
2. Understand operation description and function description. Refer to LT-35, "
System Description" .
3. Perform the Preliminary Check. Refer to LT-42, "
Preliminary Check" .
4. Check symptom and repair or replace the cause of malfunction.
5. Does the headlamp operate normally? If YES: GO TO 6. If NO: GO TO 4.
6. Inspection End.
Preliminary CheckEKS007AH
CHECK BCM CONFIGURATION
1. CHECK BCM CONFIGURATION
Confirm BCM configuration for "DTRL" is set to "WITH". Refer to BCS-13, "
READ CONFIGURATION PROCE-
DURE" .
OK or NG
OK >> Continue preliminary check. Refer to LT- 4 2 , "INSPECTION FOR POWER SUPPLY AND
GROUND CIRCUIT" .
NG >> Change BCM configuration for "DTRL" to "WITH". Refer to BCS-16, "
WRITE CONFIGURATION
PROCEDURE" .
INSPECTION FOR POWER SUPPLY AND GROUND CIRCUIT
1. CHECK FUSES AND FUSIBLE LINK
Check for blown fuses or fusible link.
Refer to LT- 3 7 , "
Wiring Diagram — DTRL —" .
OK or NG
OK >> GO TO 2.
NG >> If fuse is blown, be sure to eliminate cause of blown fuse before installing new fuse. Refer to PG-
4, "POWER SUPPLY ROUTING CIRCUIT" .
35 O/B Combination switch output 2
ONLighting, turn, wiper OFF
Wiper dial position 4
36 R/W Combination switch output 1
38 W/L Ignition switch (ON) ON — Battery voltage
39 W CAN-H — — —
40 R CAN-L — — —
67 B Ground ON — 0V
70 W/B Battery power supply (fusible
link)OFF
—Battery voltage Terminal
No.Wire
colorSignal nameMeasuring condition
Reference value
(Approx.) Ignition
switchOperation or condition
SKIA5292E
Unit Power source Fuse No.
BCMBattery f
Ignition switch ON or START position 59
Daytime light relay Battery 45
HEADLAMP (FOR CANADA) - DAYTIME LIGHT SYSTEM -
LT-43
C
D
E
F
G
H
I
J
L
MA
B
LT
Revision: August 20072004 QX56
2. CHECK POWER SUPPLY CIRCUIT
1. Disconnect BCM connectors.
2. Check voltage between BCM harness connector and ground.
OK or NG
OK >> GO TO 3.
NG >> Check harness for open or short between BCM and fuse
or fusible link.
3. CHECK GROUND CIRCUIT
Check continuity between BCM harness connector and ground.
OK or NG
OK >> Inspection End.
NG >> Check ground circuit harness.
INSPECTION PARKING BRAKE SWITCH CIRCUIT
1. CHECK BRAKE INDICATOR
1. Turn ignition switch ON.
2. Apply parking brake.
3. Release parking brake.
OK or NG
OK >> Inspection End.
NG >> GO TO 2.
BCM
(–)Ignition switch position
(+)
OFF ACC ON
ConnectorTerminal
(wire color)
M18 38 (W/L)
Ground0V 0VBattery
voltage
M20 70 (W/B)Battery
voltageBattery
voltageBattery
voltage
WKIA1436E
BCM
Continuity
ConnectorTe r m i n a l
(wire color)
M20 67 (B) Ground Yes
LIIA0915E
Brake indicator in combination meter should illuminate
when parking brake is applied and turn OFF when
released.