Page 2741 of 4449
![INFINITI FX35 2004 Service Manual EM-16
[VQ35DE]
DRIVE BELTS
Revision: 2004 November 2004 FX35/FX45
ALTERNATOR AND POWER STEERING OIL PUMP BELT
1. Remove front engine undercover with power tool.
2. Loosen idler pulley lock nut (A) and INFINITI FX35 2004 Service Manual EM-16
[VQ35DE]
DRIVE BELTS
Revision: 2004 November 2004 FX35/FX45
ALTERNATOR AND POWER STEERING OIL PUMP BELT
1. Remove front engine undercover with power tool.
2. Loosen idler pulley lock nut (A) and](/manual-img/42/57021/w960_57021-2740.png)
EM-16
[VQ35DE]
DRIVE BELTS
Revision: 2004 November 2004 FX35/FX45
ALTERNATOR AND POWER STEERING OIL PUMP BELT
1. Remove front engine undercover with power tool.
2. Loosen idler pulley lock nut (A) and adjust tension by turning
adjusting bolt (B).
For specified belt tension, refer to EM-15, "Checking Drive
Belts" .
3. Tighten nut (A).
AIR CONDITIONER COMPRESSOR BELT
1. Remove front engine undercover with power tool.
2. Loosen idler pulley lock nut (C) and adjust tension by turning adjusting bolt (D).
For specified belt tension, refer to EM-15, "Checking Drive Belts" .
3. Tighten nut (C).
Removal and InstallationABS004TZ
REMOVAL
1. Remove front engine undercover with power tool.
2. Remove alternator and power steering oil pump belt. Refer to EM-16, "
ALTERNATOR AND POWER
STEERING OIL PUMP BELT" .
3. Remove air conditioner compressor belt. Refer to EM-16, "
AIR CONDITIONER COMPRESSOR BELT" .
CAUTION:
Grease is applied to idler pulley adjusting bolt. Be careful to keep grease away from belt.
INSTALLATION
1. Install belts to pulley in reverse order of removal.
CAUTION:
Make sure belt is correctly engaged with pulley groove.
Check for engine oil and engine coolant are not adhered to belt and each pulley grooves.
2. Adjust belt tension. Refer to EM-15, "
Tension Adjustment" .
3. Tighten each adjusting bolt and nut to the specified torque.
4. Make sure that tension of each belt is within the standard. : 34.8 N·m (3.5 kg-m, 26 ft-lb)
SBIA0532E
: 34.8 N·m (3.5 kg-m, 26 ft-lb)
Page 2760 of 4449
OIL PAN AND OIL STRAINER
EM-35
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
c. Tighten bolts in numerical order as shown in the figure.
4. Install oil pan drain plug.
Refer to illustration of components of former page for installation direction of washer.
5. Install in the reverse order of removal after this step.
NOTE:
At least 30 minutes after oil pan is installed, pour engine oil.
INSPECTION AFTER INSTALLATION
1. Check the engine oil level and add engine oil. Refer to LU-7, "ENGINE OIL" .
2. Start engine, and check there is no leak of engine oil.
3. Stop engine and wait for 10 minutes.
4. Check the engine oil level again. Refer to LU-7, "
ENGINE OIL" .
PBIC0782E
Page 2766 of 4449
![INFINITI FX35 2004 Service Manual OIL PAN AND OIL STRAINER
EM-41
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
4. Install oil pan (lower) in the order below.
a. Apply liquid gasket thoroughly with tube pres INFINITI FX35 2004 Service Manual OIL PAN AND OIL STRAINER
EM-41
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
4. Install oil pan (lower) in the order below.
a. Apply liquid gasket thoroughly with tube pres](/manual-img/42/57021/w960_57021-2765.png)
OIL PAN AND OIL STRAINER
EM-41
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
4. Install oil pan (lower) in the order below.
a. Apply liquid gasket thoroughly with tube presser [SST:
WS39930000 ( – )] as in illustration.
Use Genuine RTV Silicone Sealant or equivalent. Refer to
GI-48, "
RECOMMENDED CHEMICAL PRODUCTS AND
SEALANTS" .
NOTE:
Attaching should be done within 5 minutes after coating.
b. Tighten bolts in numerical order as shown in the figure.
5. Install oil pan drain plug.
Refer to illustration of components of former page for installation direction of washer.
6. Install in the reverse order of removal after this step.
NOTE:
At least 30 minutes after oil pan is installed, pour engine oil.
INSPECTION AFTER INSTALLATION
1. Check the engine oil level and add engine oil. Refer to LU-7, "ENGINE OIL" .
2. Start engine, and check there is no leak of engine oil.
3. Stop engine and wait for 10 minutes.
4. Check the engine oil level again. Refer to LU-7, "
ENGINE OIL" .
PBIC1146E
PBIC0782E
Page 2773 of 4449
![INFINITI FX35 2004 Service Manual EM-48
[VQ35DE]
FUEL INJECTOR AND FUEL TUBE
Revision: 2004 November 2004 FX35/FX45
Lubricate O-ring with new engine oil.
Do not clean O-ring with solvent.
Make sure that O-ring and its mating part a INFINITI FX35 2004 Service Manual EM-48
[VQ35DE]
FUEL INJECTOR AND FUEL TUBE
Revision: 2004 November 2004 FX35/FX45
Lubricate O-ring with new engine oil.
Do not clean O-ring with solvent.
Make sure that O-ring and its mating part a](/manual-img/42/57021/w960_57021-2772.png)
EM-48
[VQ35DE]
FUEL INJECTOR AND FUEL TUBE
Revision: 2004 November 2004 FX35/FX45
Lubricate O-ring with new engine oil.
Do not clean O-ring with solvent.
Make sure that O-ring and its mating part are free of foreign material.
When installing O-ring, be careful not to scratch it with tool or fingernails. Also be careful not
to twist or stretch O-ring. If O-ring was stretched while it was being attached, do not insert it
quickly into fuel tube.
Insert O-ring straight into fuel tube. Do not decenter or twist it.
Insert fuel damper and fuel sub-tube straight into fuel tube.
Tighten mounting bolts evenly in turn.
After tightening mounting bolts, make sure that there is no gap between flange and fuel tube.
2. Install O-rings to fuel injector paying attention to the items below.
CAUTION:
Upper and lower O-ring are different. Be careful not to confuse them.
Handle O-ring with bare hands. Never wear gloves.
Lubricate O-ring with new engine oil.
Do not clean O-ring with solvent.
Make sure that O-ring and its mating part are free of foreign material.
When installing O-ring, be careful not to scratch it with tool or fingernails. Also be careful not to
twist or stretch O-ring. If O-ring was stretched while it was being attached, do not insert it
quickly into fuel tube.
Insert O-ring straight into fuel tube. Do not decenter or twist it.
3. Install fuel injector to fuel tube with the following procedure.
a. Insert clip into clip mounting groove on fuel injector.
Insert clip so that lug “A” of fuel injector matches notch “A” of
clip.
CAUTION:
Do not reuse clip. Replace it with a new one.
Be careful to keep clip from interfering with O-ring. If
interference occurs, replace O-ring.
b. Insert fuel injector into fuel tube with clip attached.
Insert it while matching it to the axial center.
Insert fuel injector so that lug “B” of fuel tube matches notch
“B” of clip.
Make sure that fuel tube flange is securely fixed in flange fix-
ing groove on clip.
c. Make sure that installation is complete by checking that fuel
injector does not rotate or come off.
4. Install spacers on intake manifold.Fuel tube side : Blue
Nozzle side : Brown
PBIC1931E
Page 2787 of 4449
![INFINITI FX35 2004 Service Manual EM-62
[VQ35DE]
FRONT TIMING CHAIN CASE
Revision: 2004 November 2004 FX35/FX45
d. Put a paint mark on crankshaft pulley aligning with angle mark
on crankshaft pulley bolt. Then, further retighten bolt INFINITI FX35 2004 Service Manual EM-62
[VQ35DE]
FRONT TIMING CHAIN CASE
Revision: 2004 November 2004 FX35/FX45
d. Put a paint mark on crankshaft pulley aligning with angle mark
on crankshaft pulley bolt. Then, further retighten bolt](/manual-img/42/57021/w960_57021-2786.png)
EM-62
[VQ35DE]
FRONT TIMING CHAIN CASE
Revision: 2004 November 2004 FX35/FX45
d. Put a paint mark on crankshaft pulley aligning with angle mark
on crankshaft pulley bolt. Then, further retighten bolt by “60”
degrees (equivalent to one graduation)].
11. Rotate crankshaft pulley in normal direction (clockwise when viewed from front) to confirm it turns
smoothly.
12. For the following operations, perform steps in the reverse order of removal.
NOTE:
If hydraulic pressure inside chain tensioner drops after removal/installation, slack in the guide may gener-
ate a pounding noise during and just after engine start. However, this is normal. Noise will stop after
hydraulic pressure rises.
INSPECTION AFTER INSTALLATION
Before starting engine, check the levels of engine coolant, lubrications and working fluid. If less than
required quantity, fill to the specified level.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of engine coolant, engine oil and working
fluid, fuel and exhaust gas.
Bleed air from passages in pipes and tubes of applicable lines, such as in cooling system.
After cooling down engine, again check amounts of engine coolant, engine oil and working fluid. Refill to
specified level, if necessary.
Summary of the inspection items:
SEM751G
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Working fluid Level Leakage Level
Page 2799 of 4449
![INFINITI FX35 2004 Service Manual EM-74
[VQ35DE]
TIMING CHAIN
Revision: 2004 November 2004 FX35/FX45
6. After installing rear timing chain case, check surface height dif-
ference between following parts on oil pan mounting surface.
I INFINITI FX35 2004 Service Manual EM-74
[VQ35DE]
TIMING CHAIN
Revision: 2004 November 2004 FX35/FX45
6. After installing rear timing chain case, check surface height dif-
ference between following parts on oil pan mounting surface.
I](/manual-img/42/57021/w960_57021-2798.png)
EM-74
[VQ35DE]
TIMING CHAIN
Revision: 2004 November 2004 FX35/FX45
6. After installing rear timing chain case, check surface height dif-
ference between following parts on oil pan mounting surface.
If not within standard, repeat above installation procedure.
7. Position crankshaft so No. 1 piston is set at TDC on the com-
pression stroke.
Make sure that dowel pin hole, dowel pin and crankshaft key
are located as shown in the figure.
NOTE:
Though camshaft does not stop at position as shown in the
figure, for the placement of cam nose, it is generally accepted
camshaft is placed for the same direction of the figure.
CAUTION:
Hole on small dia. side must be used for intake side dowel pin hole. Do not misidentify (ignore
big dia. side).
8. Install timing chains (secondary) and camshaft sprockets.
CAUTION:
Matching marks between timing chain and sprockets slip
easily. Confirm all matching mark positions repeatedly dur-
ing the installation process.
a. Push plunger of secondary chain tensioner and keep it pressed
in with a stopper pin.Standard (Rear timing chain case to cylinder block):
–0.24 to 0.14 mm (–0.0094 to 0.0055 in)
SEM943G
Camshaft dowel pin hole (intake side)
: At cylinder head upper face side in each bank.
Camshaft dowel pin (exhaust side)
: At cylinder head upper face side in each bank.
Crankshaft key
: At cylinder head side of right bank.
KBIA1073E
SEM430G
Page 2804 of 4449
![INFINITI FX35 2004 Service Manual TIMING CHAIN
EM-79
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
19. Install front timing chain case as follows:
a. Apply liquid gasket to front timing chain case back side INFINITI FX35 2004 Service Manual TIMING CHAIN
EM-79
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
19. Install front timing chain case as follows:
a. Apply liquid gasket to front timing chain case back side](/manual-img/42/57021/w960_57021-2803.png)
TIMING CHAIN
EM-79
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
19. Install front timing chain case as follows:
a. Apply liquid gasket to front timing chain case back side as
shown in the figure with tube presser [SST: WS39930000 ( – )].
Use Genuine RTV Silicone Sealant or equivalent. Refer to
GI-48, "
RECOMMENDED CHEMICAL PRODUCTS AND
SEALANTS".
b. Install dowel pin on rear timing chain case into dowel pin hole on
front timing chain case.
c. Tighten bolts to the specified torque in order as shown in the fig-
ure.
d. After tightening, retighten them to specified torque in numerical
order shown in figure.
20. After installing front timing chain case, check the surface height
difference between the following parts on the oil pan mounting
surface.
If not within specification, repeat the installation procedure.
21. Install right and left intake valve timing control covers as follows:
a. Install seal rings in shaft grooves.
b. Apply liquid gasket to intake valve timing control covers as
shown in the figure with tube presser [SST: WS39930000 ( – )].
Use Genuine RTV Silicone Sealant or equivalent. Refer to
GI-48, "
RECOMMENDED CHEMICAL PRODUCTS AND
SEALANTS".
PBIC1133E
8 mm (0.31 in) dia. bolts : 1, 2
: 28.4 N·m (2.9 kg-m, 21 ft-lb)
6 mm (0.24 in) dia. bolts : Except the above
: 12.7 N·m (1.3 kg-m, 9 ft-lb)
KBIA1303E
Standard
Front timing chain case to rear timing chain case:
–0.14 to 0.14 mm (–0.005 to 0.0055 in)
SEM943G
SBIA0492E
Page 2805 of 4449
![INFINITI FX35 2004 Service Manual EM-80
[VQ35DE]
TIMING CHAIN
Revision: 2004 November 2004 FX35/FX45
c. Install collared O-ring in front cover engine oil hole (left and right
sides).
d. Being careful not to move seal ring from the ins INFINITI FX35 2004 Service Manual EM-80
[VQ35DE]
TIMING CHAIN
Revision: 2004 November 2004 FX35/FX45
c. Install collared O-ring in front cover engine oil hole (left and right
sides).
d. Being careful not to move seal ring from the ins](/manual-img/42/57021/w960_57021-2804.png)
EM-80
[VQ35DE]
TIMING CHAIN
Revision: 2004 November 2004 FX35/FX45
c. Install collared O-ring in front cover engine oil hole (left and right
sides).
d. Being careful not to move seal ring from the installation groove,
align dowel pins on chain case with the holes to install intake
valve timing control covers.
e. Tighten bolts in the numerical order as shown in the figure.
22. Install crankshaft pulley as follows:
a. Fix crankshaft using ring gear stopper [SST: KV10117700 (J-44716)].
b. Install crankshaft pulley, taking care not to damage front oil seal.
When press-fitting crankshaft pulley with a plastic hammer, tap on its center portion (not circumfer-
ence).
c. Tighten bolt.
d. Put a paint mark on crankshaft pulley aligning with angle mark
on crankshaft pulley bolt. Then, further retighten bolt by “60”
degrees (equivalent to one graduation).
23. Rotate crankshaft pulley in normal direction (clockwise when viewed from front) to confirm it turns
smoothly.
24. For the following operations, perform steps in the reverse order of removal.
NOTE:
If hydraulic pressure inside chain tensioner drops after removal/installation, slack in guide may generate a
pounding noise during and just after engine start. However, this does not indicate an unusualness. Noise
will stop after hydraulic pressure rises.
INSPECTION AFTER INSTALLATION
Before starting engine, check the levels of engine coolant, lubrications and working fluid. If less than
required quantity, fill to the specified level.
Run engine to check for unusual noise and vibration.
PBIC2045E
PBIC0918E
: 44.1 N·m (4.5 kg-m, 33 ft-lb)
SEM751G