Page 2492 of 4449
DTC P1217 ENGINE OVER TEMPERATURE
EC-1151
[VK45DE]
C
D
E
F
G
H
I
J
K
L
MA
EC
Revision: 2004 November 2004 FX35/FX45
*1: Turn the ignition switch ON.
*2: Engine running at 3,000 rpm for 10 minutes.
*3: Drive at 90 km/h (55 MPH) for 30 minutes and then let idle for 10 minutes.
*4: After 60 minutes of cool down time.
For more information, refer to CO-32, "
OVERHEATING CAUSE ANALYSIS" .
Component InspectionABS00CAX
COOLING FAN MOTOR
1. Disconnect cooling fan motor harness connector.
2. Supply cooling fan motor terminals with battery voltage and
check operation.
Cooling fan motor should operate.
If NG, replace cooling fan motor.
OFF 11Cylinder headStraight gauge feeler
gauge0.1 mm (0.004 in) Maxi-
mum distortion (warping)EM-224
12Cylinder block and pis-
tonsVisual No scuffing on cylinder
walls or pistonEM-240
Engine Step Inspection item Equipment Standard Reference page
SpeedTe r m i n a l s
(+) (−)
Cooling fan motor High 1, 2 3, 4
SEF321T
Page 2628 of 4449
REFRIGERANT PRESSURE SENSOR
EC-1287
[VK45DE]
C
D
E
F
G
H
I
J
K
L
MA
EC
Revision: 2004 November 2004 FX35/FX45
REFRIGERANT PRESSURE SENSORPFP:92136
Component DescriptionABS00CF0
The refrigerant pressure sensor is installed at the condenser of the
air conditioner system. The sensor uses an electrostatic volume
pressure transducer to convert refrigerant pressure to voltage. The
voltage signal is sent to ECM, and ECM controls cooling fan system.
PBIB1492E
PBIB2657E
Page 2751 of 4449
![INFINITI FX35 2004 Service Manual EM-26
[VQ35DE]
EXHAUST MANIFOLD AND THREE WAY CATALYST
Revision: 2004 November 2004 FX35/FX45
EXHAUST MANIFOLD AND THREE WAY CATALYSTPFP:14004
Removal and InstallationABS004U4
REMOVAL
WARNING:
Perform INFINITI FX35 2004 Service Manual EM-26
[VQ35DE]
EXHAUST MANIFOLD AND THREE WAY CATALYST
Revision: 2004 November 2004 FX35/FX45
EXHAUST MANIFOLD AND THREE WAY CATALYSTPFP:14004
Removal and InstallationABS004U4
REMOVAL
WARNING:
Perform](/manual-img/42/57021/w960_57021-2750.png)
EM-26
[VQ35DE]
EXHAUST MANIFOLD AND THREE WAY CATALYST
Revision: 2004 November 2004 FX35/FX45
EXHAUST MANIFOLD AND THREE WAY CATALYSTPFP:14004
Removal and InstallationABS004U4
REMOVAL
WARNING:
Perform the work when the exhaust and cooling system have completely cooled down.
1. Remove engine cover with power tool. Refer to EM-19, "
INTAKE MANIFOLD COLLECTOR" .
2. Remove air cleaner case and air duct. Refer to EM-17, "
AIR CLEANER AND AIR DUCT" .
3. Remove front and rear engine undercover and front cross bar with power tool.
4. Disconnect heated oxygen sensors 2 (bank 1 and bank 2) harness connectors.
5. Using heated oxygen sensor wrench (SST), remove heated oxy-
gen sensors 2 (bank 1 and bank 2).
CAUTION:
Be careful not to damage heated oxygen sensor.
Discard any heated oxygen sensor which has been
dropped from a height of more than 0.5 m (19.7 in) onto a
hard surface such as a concrete floor; replace with a new
sensor.
1. Heated oxygen sensor 2 (bank 1) 2. Three way catalyst (right bank) 3. Gasket
4. heated oxygen sensor 1 (bank 1) 5. Exhaust manifold cover (right bank) 6. Exhaust manifold (right bank)
7. Exhaust manifold (left bank) 8. Exhaust manifold cover (left bank) 9. Three way catalyst (left bank)
10. heated oxygen sensor 1 (bank 2) 11. Heated oxygen sensor 2 (bank 2)
SBIA0583E
KBIA1740E
Page 2787 of 4449
![INFINITI FX35 2004 Service Manual EM-62
[VQ35DE]
FRONT TIMING CHAIN CASE
Revision: 2004 November 2004 FX35/FX45
d. Put a paint mark on crankshaft pulley aligning with angle mark
on crankshaft pulley bolt. Then, further retighten bolt INFINITI FX35 2004 Service Manual EM-62
[VQ35DE]
FRONT TIMING CHAIN CASE
Revision: 2004 November 2004 FX35/FX45
d. Put a paint mark on crankshaft pulley aligning with angle mark
on crankshaft pulley bolt. Then, further retighten bolt](/manual-img/42/57021/w960_57021-2786.png)
EM-62
[VQ35DE]
FRONT TIMING CHAIN CASE
Revision: 2004 November 2004 FX35/FX45
d. Put a paint mark on crankshaft pulley aligning with angle mark
on crankshaft pulley bolt. Then, further retighten bolt by “60”
degrees (equivalent to one graduation)].
11. Rotate crankshaft pulley in normal direction (clockwise when viewed from front) to confirm it turns
smoothly.
12. For the following operations, perform steps in the reverse order of removal.
NOTE:
If hydraulic pressure inside chain tensioner drops after removal/installation, slack in the guide may gener-
ate a pounding noise during and just after engine start. However, this is normal. Noise will stop after
hydraulic pressure rises.
INSPECTION AFTER INSTALLATION
Before starting engine, check the levels of engine coolant, lubrications and working fluid. If less than
required quantity, fill to the specified level.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of engine coolant, engine oil and working
fluid, fuel and exhaust gas.
Bleed air from passages in pipes and tubes of applicable lines, such as in cooling system.
After cooling down engine, again check amounts of engine coolant, engine oil and working fluid. Refill to
specified level, if necessary.
Summary of the inspection items:
SEM751G
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Working fluid Level Leakage Level
Page 2789 of 4449
![INFINITI FX35 2004 Service Manual EM-64
[VQ35DE]
TIMING CHAIN
Revision: 2004 November 2004 FX35/FX45
NOTE:
This section describes procedures for removing/installing front timing chain case and timing chain related
parts, and rear tim INFINITI FX35 2004 Service Manual EM-64
[VQ35DE]
TIMING CHAIN
Revision: 2004 November 2004 FX35/FX45
NOTE:
This section describes procedures for removing/installing front timing chain case and timing chain related
parts, and rear tim](/manual-img/42/57021/w960_57021-2788.png)
EM-64
[VQ35DE]
TIMING CHAIN
Revision: 2004 November 2004 FX35/FX45
NOTE:
This section describes procedures for removing/installing front timing chain case and timing chain related
parts, and rear timing chain case, when oil pan (upper) needs to be removed/installed for engine overhaul,
etc.
To remove/install front timing chain case, timing chain, and its related parts without removing oil pan
(upper), refer to EM-54, "
FRONT TIMING CHAIN CASE" .
REMOVAL
1. Place vehicle onto lift.
2. Remove front tire.
3. Disconnect negative battery terminal.
4. Remove engine cover with power tool. Refer to EM-19, "
INTAKE MANIFOLD COLLECTOR" .
5. Remove air cleaner case assembly. Refer to EM-17, "
AIR CLEANER AND AIR DUCT" .
6. Remove front and rear engine undercover with power tool.
7. Drain engine coolant from radiator. Refer to CO-11, "
Changing Engine Coolant" .
8. Drain engine oil from oil pan. Refer to LU-9, "
Changing Engine Oil" .
9. Remove engine harnesses.
10. Remove intake manifold collectors (upper and lower) with power tool. Refer to EM-19, "
INTAKE MANI-
FOLD COLLECTOR" .
11. Remove radiator cooling fan assembly. Refer to CO-21, "
COOLING FAN" .
12. Remove A/C compressor from bracket with piping connected, and temporarily secure it aside. Refer to
ATC-139, "
Components" .
13. Remove power steering oil pump from bracket with piping connected, and temporarily secure it aside.
Refer to PS-31, "
POWER STEERING OIL PUMP" .
14. Remove power steering oil pump bracket. Refer to PS-31, "
POWER STEERING OIL PUMP" .
15. Remove alternator. Refer to SC-23, "
CHARGING SYSTEM" .
16. Remove water bypass hose, water hose clamp and idler pulley bracket from front timing chain case.
17. Remove right and left intake valve timing control covers with
power tool.
Loosen bolts in reverse order as shown in the figure.
U s e s e a l c u t t e r [ S S T: K V 1 0 1111 0 0 ( J - 3 7 2 2 8 ) ] o r a n e q u i v a l e n t
tool to cut liquid gasket for removal.
CAUTION:
Shaft is internally jointed with intake camshaft sprocket
center hole. When removing, keep it horizontal until it is
completely disconnected.
1. Timing chain tensioner (secondary) 2. Internal chain guide 3. Timing chain tensioner (secondary)
4. Camshaft sprocket (EXH) 5. Timing chain (secondary) 6. Timing chain (primary)
7. Camshaft sprocket (INT) 8. Camshaft sprocket (EXH) 9. Timing chain (secondary)
10. Camshaft sprocket (INT) 11. Slack guide 12. Crankshaft sprocket
13. Timing chain tensioner (primary) 14. Intake valve timing control cover 15. Collared O-ring
16. O-ring 17. Chain tensioner cover 18. Intake valve timing control cover
19. Water hose clamp 20. Idler pulley bracket 21. Idler pulley
22. Crankshaft pulley 23. Front oil seal 24. Idler pulley
25. A/C compressor bracket 26. Water pump cover 27. Bracket
28. Front timing chain case 29. Bracket 30. Rear timing chain case
31. O-ring 32. Tension guide 33. Water drain plug (front side)
SEM728G
Page 2806 of 4449
TIMING CHAIN
EM-81
[VQ35DE]
C
D
E
F
G
H
I
J
K
L
MA
EM
Revision: 2004 November 2004 FX35/FX45
Warm up engine thoroughly to make sure there is no leakage of engine coolant, engine oil and working
fluid, fuel and exhaust gas.
Bleed air from passages in pipes and tubes of applicable lines, such as in cooling system.
After cooling down engine, again check amounts of engine coolant, engine oil and working fluid. Refill to
specified level, if necessary.
Summary of the inspection items:
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Working fluid Level Leakage Level
Page 2839 of 4449
EM-114
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2004 November 2004 FX35/FX45
Bleed air from passages in pipes and tubes of applicable lines, such as in cooling system.
After cooling down engine, again check amounts of engine coolant, engine oil and working fluid. Refill to
specified level, if necessary.
Summary of the inspection items:
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Working fluid Level Leakage Level
Fuel — Leakage —
Exhaust gas — Leakage —
Page 2843 of 4449
![INFINITI FX35 2004 Service Manual EM-118
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2004 November 2004 FX35/FX45
5. Remove front drive shaft LH and RH sides. Refer to FAX-12, "FRONT DRIVE SHAFT" .
6. Remove alternator. Refer to SC-23, "
CHARG INFINITI FX35 2004 Service Manual EM-118
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2004 November 2004 FX35/FX45
5. Remove front drive shaft LH and RH sides. Refer to FAX-12, "FRONT DRIVE SHAFT" .
6. Remove alternator. Refer to SC-23, "
CHARG](/manual-img/42/57021/w960_57021-2842.png)
EM-118
[VQ35DE]
ENGINE ASSEMBLY
Revision: 2004 November 2004 FX35/FX45
5. Remove front drive shaft LH and RH sides. Refer to FAX-12, "FRONT DRIVE SHAFT" .
6. Remove alternator. Refer to SC-23, "
CHARGING SYSTEM" .
7. Remove starter motor. Refer to SC-10, "
STARTING SYSTEM" .
8. Remove front propeller shaft from front final drive assembly side. Refer to PR-4, "
FRONT PROPELLER
SHAFT" .
9. Separate engine from transmission assembly. Refer to AT- 2 6 6 , "
TRANSMISSION ASSEMBLY" .
10. Remove engine mounting insulator FR and engine mounting bracket with power tool.
11. Remove front final drive assembly from oil pan (upper). Refer to FFD-10, "
FRONT FINAL DRIVE ASSEM-
BLY" .
INSTALLATION
Note to the following, and install in the reverse order of removal.
For a location with a positioning pin, insert it securely into hole of
mating part.
For a part with a specified installation orientation, refer to com-
ponent figure in EM-115, "
AWD MODEL" .
When installing engine mounting bracket on cylinder block,
tighten two upper bolts (shown as A in figure) first. Then tighten
two lower bolts (shown as B in figure). (LH and RH sides)
Install engine mounting bracket (lower) paying attention to the
following.
–a. Temporarily tighten mounting bolts (shown as C, D and E in
figure).
–b. Tighten mounting bolts to the specified torque with following
mounting surfaces touched.
Engine mounting bracket to engine mounting bracket (lower)
(shown as C and D in figure).
Front final drive to engine mounting bracket (lower) (shown as E
in figure).
INSPECTION AFTER INSTALLATION
Before starting engine, check the levels of engine coolant, engine oil and working fluid. If less than
required quantity, fill to the specified level.
Use procedure below to check for fuel leakage.
–Turn ignition switch ON (with engine stopped). With fuel pressure applied to fuel piping, check for fuel
leakage at connection points.
–Start engine. With engine speed increased, check again for fuel leakage at connection points.
Run engine to check for unusual noise and vibration.
Warm up engine thoroughly to make sure there is no leakage of engine coolant, engine oil, working fluid,
fuel and exhaust gas.
Bleed air from passages in pipes and tubes of applicable lines, such as in cooling system.
After cooling down engine, again check amounts of engine coolant, engine oil and working fluid. Refill to
specified level, if necessary.
Summary of the inspection items:
SBIA0477E
SBIA0478E
Item Before starting engine Engine running After engine stopped
Engine coolant Level Leakage Level
Engine oil Level Leakage Level
Working fluid Level Leakage Level