2003 YAMAHA TTR125 lock

[x] Cancel search: lock

Page 186 of 510

YAMAHA TTR125 2003  Notices Demploi (in French) 3 - 18
INSP
ADJ
BRAKE PEDAL HEIGHT ADJUSTMENT
1. Check:
Brake pedal height a 
Out of specification → Adjust.
2. Adjust:
Brake pedal height
FRONT BRAKE PAD INSPECTION AND 
REPLACEMENT (TT-R125LW)
1

Page 196 of 510

YAMAHA TTR125 2003  Notices Demploi (in French) 3 - 23
INSP
ADJ
FRONT FORK INSPECTION/
REAR SHOCK ABSORBER ASSEMBLY INSPECTION/
REAR SHOCK ABSORBER SPRING PRELOAD ADJUSTMENT
EC36C000
FRONT FORK INSPECTION
1. Inspect:
Front fork smooth action
Opera

Page 198 of 510

YAMAHA TTR125 2003  Notices Demploi (in French) 3 - 24
INSP
ADJ
TIRE PRESSURE CHECK
NOTE:
Be sure to remove all dirt and mud from
around the locknut and adjuster before
adjustment.
The length of the spring (installed) changes
1.5 mm (0.06 in) per

Page 199 of 510

YAMAHA TTR125 2003  Notices Demploi (in French) INSP
ADJCONTRÔLE DE LA PRESSION DE GONFLAGE DE PNEU
REIFENDRUCK PRÜFEN
HINWEIS:
Vor dem Einstellen alle Verschmutzungen
um die Kontermutter und den Einsteller
herum beseitigen.
Die Einbaulänge de

Page 202 of 510

YAMAHA TTR125 2003  Notices Demploi (in French) 3 - 26
INSP
ADJ
STEERING HEAD INSPECTION AND ADJUSTMENT
3. Check:
Steering smooth action
Turn the handlebar lock to lock.
Unsmooth action → Adjust steering ring
nut.
4. Adjust:
Steering ring nut
S

Page 203 of 510

YAMAHA TTR125 2003  Notices Demploi (in French) INSP
ADJCONTRÔLE ET RÉGLAGE DE LA TÊTE DE FOURCHE
LENKKOPF KONTROLLIEREN UND EINSTELLEN
3. Kontrollieren:
Leichtgängigkeit der Lenkung
Lenker hin und her bewegen.
Schwergängigkeit → Ringmutter

Page 204 of 510

YAMAHA TTR125 2003  Notices Demploi (in French) 3 - 27
INSP
ADJ
STEERING HEAD INSPECTION AND ADJUSTMENT
T R..
Ring nut (final tightening):
20 Nm (2.0 m • kg, 14 ft • lb)
Check the steering stem by turning it lock
to lock. If there is any bindi

Page 215 of 510

YAMAHA TTR125 2003  Notices Demploi (in French) ENG
 
4 - 3 
CARBURATEUR  
VERGASER
VERGASER 
Demontage-Arbeiten: 
1 
 Vergaser demontieren
Demontage-ArbeitenReihen-
folgeBauteil Anz. Bemerkungen 
VERGASER DEMONTIEREN 
Vorbereitung für den 
Ausbau