LU-28
[YD22DDTi]
OIL COOLER
OIL COOLERPFP:21305
Removal and InstallationEBS00OE8
CAUTION:
Be careful not to get burned when engine and engine oil are hot.
When removing, prepare a shop cloth to absorb any engine oil leakage or spillage.
Completely wipe off any engine oil that adhere to engine and vehicle.
REMOVAL
1. Remove engine undercover.
2. Drain engine coolant by removing cylinder block drain plug and radiator drain plug. Refer to CO-31,
"DRAINING ENGINE COOLANT" and EM-212, "CYLINDER BLOCK" .
3. Remove exhaust front tube. Refer to EX-2, "
EXHAUST SYSTEM" .
4. Remove water hoses.
5. Loosen connecting bolt and remove oil cooler.
INSPECTION AFTER REMOVAL
Check oil cooler for cracks. Check oil cooler for clogging by blowing through coolant inlet. If necessary, replace
oil cooler.
INSTALLATION
Installation is in the reverse order of removal.
Confirm that no foreign objects are adhering to the installation
planes of oil cooler or cylinder block.
Tighten the connecting bolt after aligning the stopper on the cyl-
inder block side with protrusion of oil cooler.
INSPECTION AFTER INSTALLATION
1. Check the engine oil level and the engine coolant level, and add engine oil and engine coolant. Refer to
LU-20, "
ENGINE OIL" and CO-31, "ENGINE COOLANT" .
1. Oil cooler 2. O-ring 3. Water hose
4. Gasket 5. Water hose connector 6. Connecting bolt
PBIC2441E
SBIA0126E
OIL COOLER
LU-29
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
LU
2. Start engine, and make sure that there is no leaks of engine oil or engine coolant.
3. Stop engine and wait for 10 minutes.
4. Check the engine oil level and the engine coolant level again. Refer to LU-20, "
ENGINE OIL" and CO-31,
"ENGINE COOLANT" .
LU-30
[YD22DDTi]
OIL PUMP
OIL PUMPPFP:15010
Removal and InstallationEBS01AJ3
REMOVAL
Remove oil pump housing. Refer to EM-185, "PRIMARY TIMING CHAIN" .
INSTALLATION
Install in the reverse order of removal.
INSPECTION AFTER INSTALLATION
1. After warming up engine, check there is no leaks of engine oil.
2. Stop engine and wait for 10 minutes.
3. Check the engine oil level and add engine oil. Refer to LU-20, "
ENGINE OIL" .
Disassembly and AssemblyEBS01AI7
DISASSEMBLY
1. Remove oil pump cover.
2. Remove inner rotor and outer rotor from oil pump housing.
3. After removing regulator plug, remove inner and outer regulator springs and regulator valve.
INSPECTION AFTER DISASSEMBLY
Clearance of Oil Pump Parts
Measure the clearance with feeler gauge.
Clearance between outer rotor and oil pump housing (position 1)
Tip clearance between inner rotor and outer rotor (position 2)
1. Oil pump housing 2. Outer rotor 3. Inner rotor
4. Oil pump cover 5. Regulator valve 6. Outer regulator spring
7. Inner regulator spring 8. Regulator plug
PBIC2381E
Standard : 0.114 - 0.260 mm (0.0045 - 0.0102 in)
Standard : Below 0.18 mm (0.0071in)
JLC355B
OIL PUMP
LU-31
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
LU
Measure the clearance with the feeler gauge and the straight-
edge.
Side clearance between inner rotor and oil pump housing (posi-
tion 3)
Side clearance between outer rotor and oil pump housing (posi-
tion 4)
Calculate the clearance between inner rotor and oil pump housing as follows.
–Measure the outer diameter of protruded portion of inner rotor
(position 5).
–Measure the inner diameter of oil pump housing with the inside
micrometer (position 6).
(Clearance) = (Inner diameter of oil pump housing) – (Outer
diameter of inner rotor)
If measured/calculated values are out of the standard, replace
oil pump assembly.
Regulator Valve Clearance
(Clearance) = (Valve hole diameter) – (Regulator valve outer diame-
ter)
If out of the standard, replace oil pump assembly.
CAUTION:
Coat regulator valve with new engine oil.
Make sure that it falls smoothly into valve hole by its own
weight.Standard : 0.050 - 0.090 mm (0.0020 - 0.0035 in)
Standard : 0.030 - 0.190 mm (0.0012 - 0.0075 in)
JLC356B
PBIC0253E
Standard : 0.045 - 0.091mm (0.0018 - 0.0036 in)
SBIA0124E
Standard : 0.040 - 0.097 mm (0.0016 - 0.0038 in)
PBIC2382E
SERVICE DATA AND SPECIFICATIONS (SDS)
LU-33
[YD22DDTi]
C
D
E
F
G
H
I
J
K
L
MA
LU
SERVICE DATA AND SPECIFICATIONS (SDS)PFP:00030
Standard and LimitEBS00CTZ
OIL PRESSURE
OIL PUMP
Unit: mm (in)
REGULATOR VALVE
Unit: mm (in)
OIL CAPACITY (APPROXIMATE)
Unit: · (Imp qt)
Tightening TorqueEBS00B0F
Unit: N·m (kg-m, ft-lb)
Unit: N·m (kg-m, in-lb)* Engine speed rpm
Approximate discharge pressure kPa (bar, kg/cm
2 , psi)
Idle speed
2,000140 (1.40, 1.43, 20.3) or more
270 (2.70, 2.75, 39.2) or more
Oil pump housing to outer rotor radial clearance 0.114 - 0.260 (0.0045 - 0.0102)
Inner rotor to outer rotor tip clearance Below 0.18 (0.0071)
Oil pump housing to inner rotor side clearance 0.050 - 0.090 (0.0020 - 0.0035)
Oil pump housing to outer rotor side clearance 0.030 - 0.190 (0.0012 - 0.0075)
Inner rotor to oil pump housing clearance 0.045 - 0.091 (0.0018 - 0.0036)
Regulator valve to valve hole clearance 0.040 - 0.097 (0.0016 - 0.0038)
With oil filter change 5.2 (4-5/8 Imp qt)
Without oil filter change 4.9 (4-3/8 Imp qt)
Dry engine (engine overhaul) 6.3 (5-1/2 Imp qt)
Oil pressure switch 13.0 - 17.0 (1.4 - 1.7, 10 - 12)
Oil pan drain plug34 (3.5, 25)
Oil filter bracket21.5 (2.2, 16)
Oil filler body (TYPE B) 22 (2.2, 16)
Oil filter (TYPE A)18 (1.8, 13)
Oil pump cover Bolts 6.9 (0.7, 61)*
Screws 6.9 (0.7, 61)*
Regulator plug54 (5.5, 40)
Water hose connector 23.6 (2.4, 17)
Oil cooler24.5 (2.5, 18)
CO-1
ENGINE COOLING SYSTEM
B ENGINE
CONTENTS
C
D
E
F
G
H
I
J
K
L
M
SECTION
A
CO
ENGINE COOLING SYSTEM
QR
PRECAUTIONS .......................................................... 3
Precautions for Liquid Gasket .................................. 3
LIQUID GASKET APPLICATION PROCEDURE ..... 3
PREPARATION ........................................................... 4
Special Service Tools ............................................... 4
Commercial Service Tools ........................................ 4
OVERHEATING CAUSE ANALYSIS .......................... 5
Troubleshooting Chart .............................................. 5
COOLING SYSTEM .................................................... 7
Cooling Circuit .......................................................... 7
System Chart ........................................................... 8
ENGINE COOLANT .................................................... 9
Inspection ................................................................. 9
LEVEL CHECK ..................................................... 9
LEAK CHECK ....................................................... 9
Changing Engine Coolant ........................................ 9
DRAINING ENGINE COOLANT ........................... 9
REFILLING ENGINE COOLANT ........................ 10
FLUSHING COOLING SYSTEM ......................... 10
RADIATOR ................................................................ 12
Removal and Installation ........................................ 12
REMOVAL ........................................................... 12
INSTALLATION ................................................... 13
INSPECTION AFTER INSTALLATION ............... 13
Checking Radiator Cap .......................................... 13
Checking Radiator .................................................. 13
RADIATOR (ALUMINUM TYPE) .............................. 14
Disassembly and Assembly ................................... 14
PREPARATION ................................................... 14
DISASSEMBLY ................................................... 14
ASSEMBLY ......................................................... 15
INSPECTION ...................................................... 17
COOLING FAN ......................................................... 18
Removal and Installation ........................................ 18
REMOVAL ........................................................... 18
INSTALLATION ................................................... 18
DISASSEMBLY AND ASSEMBLY ...................... 18WATER PUMP .......................................................... 20
Removal and Installation ........................................ 20
REMOVAL ........................................................... 20
INSPECTION AFTER REMOVAL ....................... 21
INSTALLATION ................................................... 21
INSPECTION AFTER INSTALLATION ................ 21
THERMOSTAT AND WATER CONTROL VALVE .... 22
Removal and Installation ........................................ 22
REMOVAL ........................................................... 22
INSPECTION AFTER REMOVAL ....................... 23
INSTALLATION ................................................... 23
INSPECTION AFTER INSTALLATION ................ 23
SERVICE DATA AND SPECIFICATIONS (SDS) ...... 24
Standard and Limit .................................................. 24
CAPACITY ........................................................... 24
THERMOSTAT .................................................... 24
WATER CONTROL VALVE ................................. 24
RADIATOR .......................................................... 24
Tightening Torque ................................................... 24
YD22DDTi
PRECAUTIONS ........................................................ 25
Precautions For Liquid Gasket ............................... 25
LIQUID GASKET APPLICATION PROCEDURE ... 25
PREPARATION ......................................................... 26
Special Service Tools ............................................. 26
Commercial Service Tools ...................................... 26
OVERHEATING CAUSE ANALYSIS ........................ 27
Troubleshooting Chart ............................................ 27
COOLING SYSTEM .................................................. 29
Cooling Circuit ........................................................ 29
System Chart .......................................................... 30
ENGINE COOLANT .................................................. 31
Inspection ............................................................... 31
LEVEL CHECK .................................................... 31
CO-2 CHECKING RADIATOR SYSTEM FOR LEAKS ... 31
Changing Engine Coolant ....................................... 31
DRAINING ENGINE COOLANT .......................... 31
REFILLING ENGINE COOLANT ......................... 32
FLUSHING COOLING SYSTEM ......................... 33
RADIATOR ................................................................ 34
Removal and Installation ........................................ 34
REMOVAL ........................................................... 34
INSTALLATION .................................................... 34
INSPECTION AFTER INSTALLATION ................ 34
Checking Radiator Cap .......................................... 35
Checking Radiator .................................................. 35
COOLING FAN .......................................................... 36
Removal and Installation ........................................ 36
REMOVAL ........................................................... 36
INSTALLATION .................................................... 36
DISASSEMBLY AND ASSEMBLY ....................... 36
RADIATOR (ALUMINUM TYPE) ............................... 38
Disassembly and Assembly .................................... 38
PREPARATION ................................................... 38
DISASSEMBLY ................................................... 38
ASSEMBLY ......................................................... 39
INSPECTION ....................................................... 41WATER PUMP ........................................................... 42
Removal and Installation ......................................... 42
REMOVAL ............................................................ 42
INSPECTION AFTER REMOVAL ........................ 43
INSTALLATION .................................................... 43
INSPECTION AFTER INSTALLATION ................ 43
THERMOSTAT AND WATER PIPING ....................... 44
Removal and Installation ......................................... 44
REMOVAL ............................................................ 44
INSPECTION AFTER REMOVAL ........................ 45
INSTALLATION .................................................... 45
INSPECTION AFTER INSTALLATION ................ 45
SERVICE DATA AND SPECIFICATIONS (SDS) ...... 46
Standard and Limit .................................................. 46
CAPACITY ........................................................... 46
THERMOSTAT ..................................................... 46
RADIATOR ........................................................... 46
Tightening Torque ................................................... 46
PRECAUTIONS
CO-3
[QR]
C
D
E
F
G
H
I
J
K
L
MA
CO
[QR]PRECAUTIONSPFP:00001
Precautions for Liquid GasketEBS00MRX
LIQUID GASKET APPLICATION PROCEDURE
1. Remove old liquid gasket adhering to the liquid gasket application surface and the mating surface.
Remove liquid gasket completely from the liquid gasket application surface, mounting bolts, and bolt
holes.
2. Wipe the liquid gasket application surface and the mating surface with white gasoline (lighting and heating
use) to remove adhering moisture, grease and foreign materials.
3. Attach liquid gasket tube to the tube presser (special service
tool).
Use Genuine Liquid Gasket or equivalent.
Within five minutes of liquid gasket application, install the mat-
ing component.
If liquid gasket protrudes, wipe it off immediately.
Do not retighten mounting bolts or nuts after the installation.
Wait 30 minutes or more after installation before refilling
engine oil and engine coolant.
PBIC2160E