2003 JEEP GRAND CHEROKEE Tools

[x] Cancel search: Tools

Page 628 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual ²Continuous Rear Wipe Mode- The internal
circuitry and hardware of the right (wiper) multi-
function switch control sleeve provides one continu-
ous rear wipe switch position.
²Front Washer Mode- Th

Page 637 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual ²Normally Open Terminal- The normally open
terminal (87) is connected to the high speed brush of
the front wiper motor through a front wiper high/low
relay high speed output circuit, and is connected

Page 638 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (2) Position the wiper high/low relay in the proper
receptacle in the PDC.
(3) Align the wiper high/low relay terminals with
the terminal cavities in the PDC receptacle.
(4) Push firmly and evenly on

Page 656 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual 8W-01 WIRING DIAGRAM INFORMATION
TABLE OF CONTENTS
page page
WIRING DIAGRAM INFORMATION
DESCRIPTION
DESCRIPTION - HOW TO USE WIRING
DIAGRAMS...........................1
DESCRIPTION - CIRCUIT INFORMATI

Page 662 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual DESCRIPTION - CONNECTOR, GROUND AND
SPLICE INFORMATION
CAUTION: Not all connectors are serviced. Some
connectors are serviced only with a harness. A typ-
ical example might be the Supplemental Restrai

Page 663 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual ²Ohmmeter - Used to check the resistance
between two points of a circuit. Low or no resistance
in a circuit means good continuity.
CAUTION: Most of the electrical components used
in todays vehicles

Page 665 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual STANDARD PROCEDURE - TESTING FOR A
SHORT TO GROUND ON FUSES POWERING
SEVERAL LOADS
(1) Refer to the wiring diagrams and disconnect or
isolate all items on the suspected fused circuits.
(2) Replace the

Page 1226 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual 8W-97 POWER DISTRIBUTION
TABLE OF CONTENTS
page page
POWER DISTRIBUTION
DESCRIPTION..........................1
OPERATION............................1
SPECIAL TOOLS
POWER DISTRIBUTION SYSTEMS.........2