2003 JEEP GRAND CHEROKEE Wheel remove

[x] Cancel search: Wheel remove

Page 1485 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual REMOVAL
WARNING: BEFORE SERVICING THE STEERING
COLUMN THE AIRBAG SYSTEM MUST BE DIS-
ARMED. FAILURE TO DO SO MAY RESULT IN ACCI-
DENTAL DEPLOYMENT OF THE AIRBAG AND
POSSIBLE PERSONAL INJURY.(Refer to

Page 1488 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (13) Remove the column coupler bolt (Fig. 13) and
slide the coupler off the column shaft.
(14) Remove the column mounting nuts (Fig. 13)
and lower column off mounting studs. Remove the
column from the

Page 1491 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual KEY-IN IGNITION SWITCH
DESCRIPTION
The key-in ignition switch is concealed within and
integral to the ignition switch, which is mounted on
the steering column. The key-in ignition switch is
actuated b

Page 1492 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (4) A release tang is located on bottom of key cyl-
inder (Fig. 18).(5) Position a small screwdriver or pin punch into
tang access hole on bottom of steering column lower
cover (Fig. 19).
(6) Push the

Page 1493 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual GEAR
TABLE OF CONTENTS
page page
GEAR
DESCRIPTION.........................16
OPERATION...........................16
REMOVAL.............................16
INSTALLATION.........................16
ADJUS

Page 1506 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual INSTALLATION
(1) Install the steering damper to the axle bracket
and tie rod.
(2) Install the steering damper bolt in the axle
bracket and tighten bolt to 88 N´m (65 ft. lbs.).
(3) Install the nut at

Page 1507 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual INSTALLATION
(1) Align and install the pitman arm on steering
gear shaft.
(2) Install the washer and nut on the shaft and
tighten the nut to 251 N´m (185 ft. lbs.).
(3) Install drag link ball stud to

Page 1510 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual DIAGNOSIS AND TESTING - PUMP LEAKAGE
(1) Possible areas of pump leakage (Fig. 3).
STANDARD PROCEDURE
STANDARD PROCEDURE - INITIAL OPERATION
- 4.0L
WARNING: THE FLUID LEVEL SHOULD BE
CHECKED WITH ENGIN