2003 JEEP GRAND CHEROKEE Connectors

[x] Cancel search: Connectors

Page 1606 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual DIAGNOSIS AND TESTING - OVERDRIVE
ELECTRICAL CONTROLS
The overdrive off switch, valve body solenoid, case
connectors and related wiring can all be tested with
a 12 volt test lamp or a volt/ohmmeter. C

Page 1624 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual CAUTION: Be sure the shoulder on the inside diam-
eter of the bearing is facing forward.
(8) Verify that splines in overdrive planetary gear
and overrunning clutch hub are aligned with Align-
ment Too

Page 1644 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (8) Disengage all wiring connectors from the
shifter assembly.
(9) Remove all nuts holding the shifter assembly to
the floor pan (Fig. 239).
(10) Remove the shifter assembly from the vehicle.
INSTALLA

Page 1646 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual simultaneous movement without causing the trans-
mission throttle lever to either move ahead of, or lag
behind the lever on the throttle body.
ADJUSTMENT VERIFICATION
(1) Turn ignition key to OFF posi

Page 1751 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (3) Install nuts to hold seal plate to floor pan.
Tighten nuts to 7 N´m (65 in.lbs.).
(4) Install the shift cable to the shifter assembly
bracket. Push cable into the bracket until secure.
(5) Place

Page 1780 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual Replace the driving shell if worn, cracked or dam-
aged.
Replace planetary gear sets if gears, pinion pins, or
carrier are damaged in any way. Replace the annulus
gears and supports if either componen

Page 1782 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual INSTALLATION
(1) Place the floor shifter lever in PARK position.
(2) Loosen the adjustment screw on the shift cable.
(3) Verify that the park lock cable adjustment tab
is pulled upward to the unlocked

Page 1879 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual INSTALLATION
(1) Position flip up glass on liftgate.
(2) Install hinge fasteners, hand tight only.
(3) With the glass panel in the fully open position,
fully raised position, push the glass forward to