TRANSFER BOX - LT230SE
REPAIRS 41-27
Transfer box - V8
$% 41.20.25.99
Remove
1.Remove front exhaust pipe.
+ MANIFOLDS AND EXHAUST
SYSTEMS - V8, REPAIRS, Front pipe.
2.Drain transfer box oil.
+ MAINTENANCE, PROCEDURES,
Transfer box.
3.Remove 8 bolts securing rear cross member
and remove cross member.
4.Remove 3 nuts securing intermediate silencer
to tail pipe.
5.Release silencer from mounting rubbers,
remove silencer and discard gasket.
6.Remove front propeller shaft.
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - front.
7.Remove rear propeller shaft.
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - rear.8.Remove handbrake drum retaining screw and
remove handbrake drum.
9.Remove 4 bolts from handbrake back plate,
release back plate and tie aside.
10.Remove clevis pin and 'C' washer securing
high/low ratio selector cable to selector lever
and release cable from abutment bracket.
TRANSFER BOX - LT230SE
REPAIRS 41-29
22.Remove 4 bolts and nut securing RH mounting
to body and transfer box.
23.Remove nut securing LH mounting to body.
24.Raise gearbox and remove RH mounting.
25.With assistance, remove transfer box from
gearbox.
26.Remove input shaft oil seal.
+ TRANSFER BOX - LT230SE,
REPAIRS, Oil seal - input shaft.
Refit
1.Fit new input shaft oil seal.
+ TRANSFER BOX - LT230SE,
REPAIRS, Oil seal - input shaft.
2.Clean transfer box to gearbox mating faces.
3.Raise transfer box on jack and align to guide
studs LRT-41-009.
4.Clean transfer box to gearbox bolt threads.
5.Apply Loctite 290 to bolt and stud threads.
6.Fit and lightly tighten 2 bolts and nut securing
transfer box to gearbox. If new stud is to be
fitted apply Loctite 290 to threads of stud
and tighten to 45 Nm (33 lbf.ft)
7.Remove guide studs, fit and lightly tighten 3
bolts.
8.Tighten bolts and nut by diagonal selection to
45 Nm (33 lbf.ft.
9.Position gearbox RH mounting and tighten
bolts to 85 Nm (63 lbf.ft).
10.Tighten gearbox RH mounting nut to 48 Nm
(35 lbf.ft).
11.Fit nut to LH mounting and tighten to 48 Nm (35
lbf.ft).
12.Remove 4 bolts securing support plate to
gearbox jack.
13.Remove 4 bolts securing support plate LRT-99-
010 to transfer box and remove plate.
14.Clean threads of bottom plate bolts.
15.Apply Loctite 290 to threads of bolts.
16.Fit 4 bolts securing bottom plate and tighten to
25 Nm (18 lbf.ft).
17.Using new washers position breather pipe and
tighten banjo bolt.
18.Connect multiplug to transfer box neutral switch
and secure harness. 19. If fitted - Connect Lucars to differential lock
switch.
20.Connect multiplug and Lucars to reverse lamp
switch and oil temperature sensor.
21.Position high/low ratio selector cable and
secure with 'C' washer and clevis pin.
22.Secure cable to fuel pipes with new cable ties.
23.Clean handbrake back plate and mating face.
24.Position handbrake back plate, fit bolts and
tighten to 75 Nm (55 lbf.ft).
25.Clean handbrake drum.
26.Fit handbrake drum and tighten retaining
screw.
27.Fit front propeller shaft.
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - front.
28.Fit rear propeller shaft.
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - rear.
29.Clean exhaust silencer and tail pipe mating
faces.
30.Position silencer and secure on mountings,
using a new gasket align to tail pipe, fit nuts
and tighten to 25 Nm (18 lbf.ft).
31.Position rear cross member, fit bolts and
tighten to 26 Nm (19 lbf.ft).
32.Refill transfer box with oil.
+ MAINTENANCE, PROCEDURES,
Transfer box.
33.Fit front exhaust pipe.
+ MANIFOLDS AND EXHAUST
SYSTEMS - V8, REPAIRS, Front pipe.
TRANSFER BOX - LT230SE
41-30 REPAIRS
Gasket - rear cover plate
$% 41.20.30
Remove
1.Mark rear cover to bearing housing for
assembly purposes.
2.Note fitted position of stud nut, remove stud nut
and 5 bolts securing rear cover.
3.Carefully release rear cover from bearing
housing.
Refit
1.Clean rear cover, mating face on bearing
housing and sealant from stud/bolt threads.
2.Apply sealant Part No. STC 3254 to rear cover
mating face.
3.Align reference marks and position rear cover.
4.Apply Loctite 290 to stud/bolt threads, fit rear
cover plate stud nut and bolts and tighten to 25
Nm (18 lbf.ft).
5.Top-up transfer box oil.
+ MAINTENANCE, PROCEDURES,
Transfer box.
Switch - differential lock - Up to 03 MY
$% 41.20.34
Remove
1.Remove front propeller shaft.
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - front.
2.Disconnect 2 Lucars from switch.
3.Remove switch and remove nut from switch.
Refit
1.Clean switch and gearbox face.
2.Fit nut to switch with counterbore positioned
towards switch head. The nut acts as a spacer
to ensure that switch setting is correct.
Always ensure that nut is fully tightened to
switch head, (no gap).
3.Apply Hylomar PL 32 sealant to switch thread.
4.Position switch into front output housing until
nut bottoms out on housing.
TRANSFER BOX - LT230SE
REPAIRS 41-33
Seal - front output shaft
$% 41.20.51
Remove
1.Position vehicle on 4 post ramp.
2.Remove front propeller shaft.
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - front.
3.Restrain transfer box drive flange using tool
LRT-51-003. Remove and discard drive flange
nut, remove and discard steel and felt washers.
4.Using tool LRT-99-500 if necessary, remove
drive flange from transfer box.
5.Remove seal from transfer box. Refit
1.Clean seal mating faces.
2.Lubricate seal with gearbox oil.
3.Fit new seal using tool LRT-41-012.
4.Position drive flange, fit new felt and steel
washers.
5.Position tool LRT-51-003 and tighten new
drive flange nut to 148 Nm (109 lbf.ft).
6.Fit propeller shaft.
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - front.
7.Top-up transfer box oil.
+ MAINTENANCE, PROCEDURES,
Transfer box.
TRANSFER BOX - LT230SE
REPAIRS 41-35
3.Fit new seal using tool LRT-41-012.
4.Position drive flange, fit new felt and steel
washers.
5.Position tool LRT-51-003 and tighten new
drive flange nut to 148 Nm (109 lbf.ft).
6.Position handbrake drum and tighten screw.
7.Tighten brake shoe adjuster bolt to 25 Nm (18
lbf.ft) then loosen one and a half turns.
8.Check that brake drum is free to rotate.
9.Fit propeller shaft.
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - front.
10.Top-up transfer box oil.
+ MAINTENANCE, PROCEDURES,
Transfer box.
Gasket - rear output shaft housing
$% 41.20.55
Remove
1.Drain transfer gearbox oil.
+ MAINTENANCE, PROCEDURES,
Transfer box.
2.Remove rear output shaft seal.
+ TRANSFER BOX - LT230SE,
REPAIRS, Seal - rear output shaft.
3.Mark output shaft housing to main casing for
assembly purposes.
4.Note position of shoulder bolt, remove 6 bolts
securing housing to main casing.
Refit
1.Clean output shaft housing, mating face on
main casing and sealant from bolt threads.
2.Apply sealant, Part No. STC 3254 to mating
flange on output shaft housing.
3.Fit output shaft housing to main casing.
4.Apply Loctite 290 to bolt threads.
5.Fit output shaft housing bolts and tighten by
diagonal selection to 45 Nm (33 lbf.ft).
6.Fit rear output shaft seal.
+ TRANSFER BOX - LT230SE,
REPAIRS, Seal - rear output shaft.
7.Fill transfer gearbox with oil.
+ MAINTENANCE, PROCEDURES,
Transfer box.
AUTOMATIC GEARBOX - ZF4HP22 - 24
44-26 REPAIRS
Refit
1.Clean shaft and seal housing.
2.Using a suitable adapter, fit new seal.
3.Position selector quadrant and connecting rod.
4.Position selector shaft and secure to quadrant
using new roll pin.
5.Fit valve body assembly.
+ AUTOMATIC GEARBOX - ZF4HP22
- 24, REPAIRS, Valve body assembly.
Gearbox - convertor and transfer
gearbox - Diesel
$% 44.20.04.99
Remove
1.Release fixings and remove battery cover.
2.Disconnect battery earth lead.
3.Raise vehicle on a ramp.
4.Remove starter motor
+ CHARGING AND STARTING,
REPAIRS, Starter motor - diesel.
5.Remove 2 upper bolts securing gearbox
housing to engine.
6.Remove bolt securing closing plate to gearbox
housing.
7.Remove exhaust front pipe.
+ MANIFOLDS AND EXHAUST
SYSTEMS - Td5, REPAIRS, Pipe - front.
8.Remove 3 nuts securing intermediate silencer
to tail pipe.
9.Release and remove silencer from rubber
mountings.
10.Drain automatic gearbox oil.
+ MAINTENANCE, PROCEDURES,
Automatic gearbox.
AUTOMATIC GEARBOX - ZF4HP22 - 24
REPAIRS 44-27
11.Drain transfer gearbox oil.
+ MAINTENANCE, PROCEDURES,
Transfer box.
12.Remove front propeller shaft
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - front.
13.Remove rear propeller shaft
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - rear.
14.Remove and discard 3 bolts securing torque
converter to drive plate.
15.Remove handbrake drum retaining screw and
remove brake drum. 16.Remove 4 bolts from handbrake back plate,
release back plate and tie aside.
17.Remove clip securing high/low ratio selector
cable to transfer gearbox lever, remove 'C' clip
and remove outer cable from gearbox.
18.Disconnect 2 Lucars from differential lock
switch and multiplugs from high/low ratio switch
and neutral sensor.
19.Remove cable tie and multi plug from bracket
to transfer box.
AUTOMATIC GEARBOX - ZF4HP22 - 24
44-30 REPAIRS
14.Secure gearbox breather pipes to bulkhead
clip.
15.Connect multiplugs to high/low ratio switch and
neutral sensor. Connect Lucars to differential
lock switch.
16.Position cable tie and multi plug to transfer box
bracket.
17.Connect high/low ratio cable to transfer box
and secure with retaining clips.
18.Position hand brake back plate and tighten
bolts to 75 Nm (55 lbf.ft).
19.Fit hand brake drum and tighten screw.
20.Remove bolts securing tool LRT-99-008A to
gearbox.
21.Rotate engine to align torque converter, fit new
bolts and tighten to 50 Nm (37 lbf.ft).
22.Fit rear propeller shaft.
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - rear.
23.Fit front propeller shaft.
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - front.
24.Fill transfer gearbox with oil.
+ MAINTENANCE, PROCEDURES,
Transfer box.
25.Fill automatic gearbox with oil.
+ MAINTENANCE, PROCEDURES,
Automatic gearbox.
26.Position intermediate silencer and secure to
mounting rubbers.
27.Clean silencer and tail pipe mating faces.
28.Position new gasket to tail pipe and tighten
nuts to 25 Nm (18 lbf.ft).
29.Fit exhaust front pipe.
+ MANIFOLDS AND EXHAUST
SYSTEMS - Td5, REPAIRS, Pipe - front.
30.Fit bolt securing closing plate to gearbox
housing and tighten to 7 Nm (5.2 lbf.ft).
31.Fit upper bolts securing gearbox housing to
engine and tighten to 50 Nm (37 lbf.ft).
32.Fit starter motor.
+ CHARGING AND STARTING,
REPAIRS, Starter motor - diesel.
33.Tighten remaining gearbox housing to engine
bolts to 50 Nm (37 lbf.ft).
34.Connect battery earth lead.
35.Fit battery cover and secure with fixings.
36.Check and adjust selector cable.
+ AUTOMATIC GEARBOX - ZF4HP22
- 24, ADJUSTMENTS, Cable - selector.
Gearbox - convertor and transfer
gearbox - V8
$% 44.20.04.99
Remove
1.Release fixings and remove battery cover.
2.Disconnect battery earth lead.
3.Raise vehicle on a ramp.
4.Remove 8 bolts securing centre cross member
and remove cross member.
5.Remove exhaust front pipe.
+ MANIFOLDS AND EXHAUST
SYSTEMS - V8, REPAIRS, Front pipe.
6.Remove 3 nuts securing intermediate silencer
to tail pipe.
7.Release and remove silencer from rubber
mountings.
8.Drain automatic gearbox oil.
+ MAINTENANCE, PROCEDURES,
Automatic gearbox.
9.Drain transfer gearbox oil.
+ MAINTENANCE, PROCEDURES,
Transfer box.
10.Remove front propeller shaft
+ PROPELLER SHAFTS, REPAIRS,
Propeller shaft - front.