2002 JEEP GRAND CHEROKEE ohm

[x] Cancel search: ohm

Page 639 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual DIAGNOSIS AND TESTING - WIPER ON/OFF
RELAY
The wiper on/off relay (Fig. 29) is located in the
Power Distribution Center (PDC) in the engine com-
partment near the battery. Refer to the appropriate
wir

Page 662 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual DESCRIPTION - CONNECTOR, GROUND AND
SPLICE INFORMATION
CAUTION: Not all connectors are serviced. Some
connectors are serviced only with a harness. A typ-
ical example might be the Supplemental Restrai

Page 663 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual ²Ohmmeter - Used to check the resistance
between two points of a circuit. Low or no resistance
in a circuit means good continuity.
CAUTION: Most of the electrical components used
in todays vehicles

Page 664 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual STANDARD PROCEDURE - TESTING OF
VOLTAGE POTENTIAL
(1) Connect the ground lead of a voltmeter to a
known good ground (Fig. 7).
(2) Connect the other lead of the voltmeter to the
selected test point. Th

Page 1239 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The cigar lighter relay cannot be repaired or
adjusted and, if faulty or damaged, it must be
replaced.
OPERATION
The ISO relay consists of an electromagnetic coil, a
resistor or diode, and three (two

Page 1426 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (3) Apply a small amount of clean engine oil to
o-rings.
(4) Position filter/regulator to body and install 2
bolts. Tighten bolts to 3 N´m (30 in. lbs.) torque.
(5) Connect 3 fittings. Refer to Quick

Page 1463 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The PCM determines injector on-time (pulse width)
based on various inputs.
DIAGNOSIS AND TESTING - FUEL INJECTOR
To perform a complete test of the fuel injectors and
their circuitry, use the DRB scan

Page 1469 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The other two heater elements (downstream sen-
sors 1/2 and 2/2) are controlled by the downstream
heater relay through output signals from the PCM.
To avoid a large simultaneous current surge, power
i
Page:   < prev 1-10 ... 9-16 17-24 25-32 33-40 41-48 next >