2002 JEEP GRAND CHEROKEE 4.7l intake manifold

[x] Cancel search: 4.7l intake manifold

Page 1381 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (7) Connect throttle cable and speed control cable
to throttle body.
(8) Install fuel rail (Refer to 14 - FUEL SYSTEM/
FUEL DELIVERY/FUEL RAIL - INSTALLATION).
(9) Install ignition coil towers (Refer

Page 1384 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual INSPECTION
(1) Inspect the exhaust manifold for cracks in the
mating surface and at every mounting bolt hole.
(2) Using a straight edge and a feeler gauge, check
the mating surface for warp and twist.

Page 1434 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (8) Connect fuel return and pressure lines to fuel
pump module fittings (Fig. 16). Refer to Quick-Con-
nect Fittings.
(9) Install fuel tank. Refer to Fuel Tank Installa-
tion.
FUEL RAIL
DESCRIPTION
DE

Page 1437 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (9) Disconnect speed control cable at throttle body
(if equipped). Refer to Speed Control Cable.
(10) Disconnect automatic transmission cable at
throttle body (if equipped).
(11) Remove cable routing

Page 1453 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (8) Inspect system body grounds for loose or dirty
connections. Refer to Group 8, Wiring for ground
locations.
(9) Verify crankcase ventilation (CCV) operation.
Refer to Emission Control System for ad

Page 1454 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (18) 4.0L Engine: Verify wire harness connector is
firmly connected to Engine Coolant Temperature
(ECT) sensor (Fig. 11).(19) 4.7L Engine: Verify MAP and Engine Coolant
Temperature (ECT) sensor electr

Page 1458 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual SPECIFICATIONS
TORQUE - FUEL INJECTION
DESCRIPTION N-m Ft. Lbs. In. Lbs.
Air Cleaner Housing Mount. Nuts 10 93
Air Cleaner Air Duct Clamps 4 35
Air Cleaner Resonator Bolts 4 35
Engine Coolant Temperat

Page 1462 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (5) Push sensor against flywheel/drive plate. With
sensor pushed against flywheel/drive plate, tighten
mounting bolt to 7 N´m (60 in. lbs.) torque.
(6) Route sensor wiring harness into wire shield.
(