2002 JEEP GRAND CHEROKEE ECU

[x] Cancel search: ECU

Page 1807 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (2) Remove seal plug from low range fork lockpin
access hole. Then move shift sector to align low range
fork lockpin with access hole.
(3) Remove range fork lockpin with size number
one easy-out tool

Page 1814 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual REAR OUTPUT SHAFT/YOKE/DRIVE CHAIN
Check condition of the seal contact surfaces of the
yoke slinger (Fig. 49). This surface must be clean and
smooth to ensure proper seal life. Replace the yoke
nut an

Page 1823 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (18) Install shift rail (Fig. 81). Be sure rail is
seated in both shift forks.
(19) Rotate shift sector to align lockpin hole in low
range fork with access hole in case.
(20) Insert an easy-out in ran

Page 1826 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual NV242HD REAR RETAINER
(1) Apply bead of MopartSealer, or LoctiteŸ
Ultra Gray, to mating surface of rear retainer. Sealer
bead should be a maximum of 3/16 in.
(2) Install rear retainer on rear case. T

Page 1836 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual CONDITION POSSIBLE CAUSE CORRECTION
NOISY INÐOR JUMPS OUT OF
4WD LOW RANGE1. Transfer case not completely
engaged in 4WD LOW (possibly
from shift to 4L while rolling)1. Stop vehicle, shift transfer c

Page 1854 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (7) Apply 3 mm (1/8 in.) wide bead of Mopartgas-
ket maker or silicone adhesive sealer to mounting
surface of rear retainer. Allow sealer to set-up
slightly before proceeding.
(8) Slide rear retainer

Page 1882 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual LIFTGATE
REMOVAL
CAUTION: DO NOT DISCONNECT THE SUPPORT ROD
CYLINDERS WITH THE LIFTGATE CLOSED. THE SUP-
PORT ROD PISTONS ARE OPERATED BY HIGH PRES-
SURE GAS. THIS PRESSURE COULD CAUSE DAMAGE
AND /OR

Page 1887 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (7) Remove glass run channel from door.
INSTALLATION
(1) Position glass run channel in door (Fig. 6).
(2) Align glass run channel with door frame run
channel and slide channel upward to secure door.
(